Turbines in Private Sector Participation (PSP) Hydro Rwanda
From energypedia
Revision as of 14:16, 20 September 2010 by ***** (***** | *****)
Three hydro sites are currently under development in the EnDev project PSP Hydro in Rwanda. Here is some date about the turbines and generators that will be installed in the projects:
| Project site | project developer |
capazity | Turbine Manufacturer |
| [kW] | |||
| Murunda | REPRO | 96 | generator: Ossberger (new)
turbine: Ossberger (old) |
| Masimeru and Maruruma | ENNY | 250 |
generator + turbine Kochendörfer (new) |
| Musarara | SOGEMR | 438 |
generator + turbine Ossberger (new) |