Micro Hydro Power (MHP) - Ethiopia, Ererte

From energypedia
Revision as of 14:25, 20 December 2010 by ***** (***** | *****)

Location of the site:

Country: Ethiopia
District: Bona Zuria
Kebele: Beshiro Gute
GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E

 

Start of Construction: August 2009

Date of Commissioning:


Ownership:

Robot Electric Users Cooperative/community based cooperative society


Tariff Structure:

Flat rate/monthly based per appliance


Technical Specification:


 Canal: Lined stone masonry having a length of 53m

 Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured

 

Turbine:

 T-15 cross flow turbine /Manufactured locally

Generator:


Grid:

 Wooden pole, ABC cable(2.76Km)


 

Ererti Fall.JPG
Ererti MHP site.JPG
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG