Micro Hydro Power (MHP) - Ethiopia, Ererte
From energypedia
Revision as of 14:25, 20 December 2010 by ***** (***** | *****)
Location of the site:
Country: Ethiopia
District: Bona Zuria
Kebele: Beshiro Gute
GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E
Start of Construction: August 2009
Date of Commissioning:
Ownership:
Robot Electric Users Cooperative/community based cooperative society
Tariff Structure:
Flat rate/monthly based per appliance
Technical Specification:
Canal: Lined stone masonry having a length of 53m
Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured
Turbine:
T-15 cross flow turbine /Manufactured locally
Generator:
Grid:
Wooden pole, ABC cable(2.76Km)