Lom Pangar Hydropower Project - Economic and Financial Analysis

From energypedia
Revision as of 18:33, 25 March 2014 by ***** (***** | *****)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)



Lom Pangar Hydropower Project - Economic and Financial Analysis

Title of Document Lom Pangar Hydropower Project - Economic and Financial Analysis
Abstract The project development objective is to increase hydropower generation capacity and reduce seasonal variability of water flow in the Sanaga River and to increase access to electricity. The document includes an example of economic and financial analysis: The economic analysis deals with demand forecast, demand scenarios and sensitivities to parameters; The financial analysis deals with the financial viability of the Lom Pangar dam and of the Lom Pangar power plant and with the financial situation of AES-SONEL and of the Electricity Development Corporation (EDC).
File Download

English: Cameroon Lom Pangar Hydropower Project E&FA.pdf

Original Source World Bank
Year 2012
Region/Country Africa - Cameroon
Language(s) English
Document Type Project Financing- Examples of Economic & Financial Analysis
Technology Hydro
Connection Type


Hydro