MHP El Plan
From energypedia
Revision as of 21:09, 26 March 2014 by ***** (***** | *****)
Overview
Location of the site:
- Country: Germany
- District: Baden-Württemberg
- River: Schanzbach
- GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E
This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/
Further Information - Project
Start of Construction: December 2011
Date of Commissioning: June 2012
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Turbine: Pelton
Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
| |
Further Information
- project website: sites.google.com/site/haeusleberg/
References
Location of the site:
- Country: text
- District: text
- River: text
- GPS Coordinates: text
add general comments such as number of connected HH in this segment
Start of construction:
Date of Commissioning:
Ownership / Operation Model:
Tariff structure:
Turbine:
Generator:
add picture of MHP location | add picture of MHP location |
add description of picture | add description of picture |
add picture of MHP location |
add picture of MHP location |
add description of picture | add description of picture |
add respective country category