MHP El Plan

From energypedia
Revision as of 22:46, 26 March 2014 by ***** (***** | *****)

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Country: Nicaragua (GPS Coordinates: ?)
Power Output: X kW
Project Status: in operation
Start of Construction: ?
Date of Commissioning: ?
Comments: ?



Operation Data

Head:
Flow:
Turbine Type: Pelton
Country: Nicaragua (GPS Coordinates: ?)
Power Output: X kW
Start of Construction ?
Date of Commissioning: ?
Comments: ?



Technical Information

Head:
Flow:
Turbine Type: Pelton
Country: Nicaragua (GPS Coordinates: ?)
Power Output: X kW
Start of Construction ?
Date of Commissioning: ?
Comments: ?



Civil Works

Penstock Diameter: X
Penstock Length:
Penstock Material: PVC
Dam Type
Dam Construction Material: X kW
Dam Height: ?
Dam Length: ?
Storage Volume Reservoir: ?

Electromechanical Equipment

Turbine:

Turbine Maufacturer: (Contact: )


Generator: Generator Manufaturer Generator Capacity

Electrical Transmission

Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA


Economic Information

Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold