MHP El Plan
From energypedia
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Power Output: | X kW |
Project Status: | in operation |
Comments: | ? |
Operation Data
Gross Head: | |
Net Head: | |
Flow (design flow): | |
Comments on flow variation during the year: | |
Technical Information
Comments: | General Technical Comments on the Project |
Civil Works and Penstock
Dam construction material: | |
Dam Height: | |
Dam Lenght: | |
Dam Width: | |
Storage Volume Reservoir: | ? |
Sedimentation Basin: | |
Penstock Length: | |
Penstock Diameter at Beginning: | X |
Penstock Diameter at End: | X |
Penstock Changes of Diameter: | |
Penstock Material: | PVC |
Security Valve: |
Electromechanical Equipment
Turbine
Turbine Type: | Pelton, x injectors |
Turbine Manufacturer: | (Contact:) |
Potencial (nominal): | |
Rated Head: | |
Rated Flow: | |
Rated Speed: | X |
: | |
: | |
: | |
: | |
: | |
: | |
: |
Generator:
Generator Manufacturer and Model: | |
Phases: | 3 |
Potencial (nominal): | |
Nominal voltage: | |
Speed: | |
Frequenzy: | X |
Insolation Class: | |
: | |
Electrical Transmission
Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA
Economic Information
Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold
|-
| style="width: 194px;" | Start of Construction:
| style="width: 390px;" | ?
|-
| style="width: 194px;" | Date of Commissioning:
| style="width: 390px;" | ?