MHP El Plan
From energypedia
Overview
Name of the site: | El Plan |
Country: | Nicaragua (GPS Coordinates: ?) |
Turbine Type: | Pelton |
Power Output: | X kW |
Project Status: | in operation |
Comments: | ? |
Operation Data
Gross Head: | |
Net/Design Head: | |
Flow (design flow): | |
Comments on flow variation during the year: |
Technical Information
Comments: | General Technical Comments on the Project |
Civil Works and Penstock
Dam construction material: | |
Dam Dimensions: | |
Storage Volume Reservoir: | ? |
Sedimentation Basin material: | |
Sedimentation Basin Dimensions: | |
Penstock Length: | |
Penstock Diameter at Beginning: | X |
Penstock Diameter at End: | X |
Penstock Changes of Diameter: | |
Penstock Material: | PVC |
Security Valve: |
Electromechanical Equipment
Turbine
Turbine Type: | Pelton, x injectors |
Turbine Diameter: | Pelton, x injectors |
Turbine Material: | Pelton, x injectors |
Turbine Manufacturer: | (Contact:) |
Potencial (nominal): | |
Rated Head: | |
Rated Flow: | |
Rated Speed: | X |
Runnaway Speed: | |
Shaft diameter and material: | |
Direction of Rotation: | |
Orientation of Shaft: |
Generator:
Generator Manufacturer and Model: | |
Phases: | 3 |
Potencial (nominal): | |
Nominal voltage: | |
Nominal Speed: | |
Frequency: | X |
Isolation Class: |
Mechanical Transmission / Coupling
Type of Belt: | |
Belt Manufacturer: | 3 |
Distance between Pulleys: | |
Diameter of Generator Pulley: | |
Diameter of Generator Pulley: |
Control System
Control System Manufacturer and Model: | |
Type of Control: | 3 |
Capacity: |
Electrical Transmission
Mini Grid: | |
Connection to national Grid: | 3 |
Grid Voltage: | |
Diameter of Conductor: | 3 |
Transformer Rating: |
Economic Information
Developer: (Contact: ) | |
Operator: | 3 |
Ownership / Operation Model: | |
Tariff structure: | 3 |
Connected Housholds: | |
Costs: | |
Connection Cost Cost to be covered by houshold: | 3 |
Connected Hounsholds: | |
Start of Construction: | ? |
Date of Commissioning: | ? |