Micro Hydro - Operation and Maintenance

From energypedia
Revision as of 16:58, 14 June 2009 by ***** (***** | *****) (New page: Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M p...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Operation and maintenance (O+M) procedures must be planned and put into action in the initial stages of any scheme to prevent breakdowns and reduced power outputs. The failure to use O+M procedures will result in financial problems and loss of confidence in the value of micro-hydro. The design engineer, the equipment installers and the users of the scheme, all have important parts to play in the O+M of micro-hydro schemes.