Difference between revisions of "Costs of Micro-Hydro Power Sites in Rwanda"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 2: Line 2:
 
|HPNET name=Costs of Micro-Hydro Power Sites in Rwanda
 
|HPNET name=Costs of Micro-Hydro Power Sites in Rwanda
 
|HPNET description=Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.
 
|HPNET description=Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.
 +
|HPNET author=Tim Chiaradia and Andreas Michel
 
|HPNET project location=-1.940278, 29.873887999999965
 
|HPNET project location=-1.940278, 29.873887999999965
 
|HPNET region=Global/Multiple
 
|HPNET region=Global/Multiple

Revision as of 13:07, 5 August 2016


Banner2.png

WISIONS
Practical Action
EnDev Indonesia
Hydro Empowerment Network

KNOWLEDGE PRODUCT SUMMARY

Title
Costs of Micro-Hydro Power Sites in Rwanda
Type
Guides, Manuals, and Tools
Organization
No organization entered yet.
Region/Country
Global/Multiple
Website
no website
Contact
no contact
E-mail
no email
Year of publication
Description
Micro-Hydro Power (MHP) projects come along with a big variety of costs. Planning and developing a site brings a number of country, probably regional specific costs. Similar to that are costs for operation and maintenance. All different cost categories play a role for individual projects, while big difference between countries due to different framework condition might occur. A clear cost analysis upfront is highly recommended.
Author / Producer
Tim Chiaradia and Andreas Michel
View / Download

FILTERING

Filter 1:
Region / Country
Global/Multiple
Filter 2:
Knowledge Product Type
Document
  • Guides, Manuals, and Tools
Filter 3:
Theme / Topic
Policy
  • Financing for Micro and Mini Hydro