Difference between revisions of "EnDev Indonesia's Site Criteria Checklist for Solar/Micro Hydro Power Plants"
From energypedia
***** (***** | *****) (Created page with "{{HPNET Project Database |HPNET name=EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants |HPNET description=Purpose of the "EnDev Indonesia Site Crite...") |
***** (***** | *****) |
||
Line 1: | Line 1: | ||
{{HPNET Project Database | {{HPNET Project Database | ||
− | |||
|HPNET description=Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. | |HPNET description=Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. | ||
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | ||
|HPNET organization=Energising Development Indonesia | |HPNET organization=Energising Development Indonesia | ||
− | |HPNET project location=-6.1087634, 106. | + | |HPNET web=http://www.endev-indonesia.info/en/home |
+ | |HPNET project location=-6.1087634, 106.845599 | ||
|HPNET region=Southeast Asia | |HPNET region=Southeast Asia | ||
|HPNET product type=Documents | |HPNET product type=Documents | ||
Line 18: | Line 18: | ||
|HPNET topic people sub watershed= | |HPNET topic people sub watershed= | ||
|HPNET topic people sub community= | |HPNET topic people sub community= | ||
+ | |HPNET name=EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants | ||
}} | }} | ||
{{HPNET File Upload | {{HPNET File Upload |
Revision as of 19:48, 23 July 2016
KNOWLEDGE PRODUCT SUMMARY
Title
EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants
Type
Guides, Manuals, and Tools
Organization
Energising Development Indonesia
Region/Country
Southeast Asia
Indonesia
Indonesia
Website
Contact
no contact
E-mail
no email
Year of publication
Description
Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
Author / Producer
View / Download
FILTERING
Filter 1:
Region / Country
Region / Country
Southeast Asia
- Indonesia
Filter 2:
Knowledge Product Type
Knowledge Product Type
Document
- Guides, Manuals, and Tools
Filter 3:
Theme / Topic
Theme / Topic
Policy