Click here to register!
Difference between revisions of "EnDev Indonesia Site Criteria Checklist for Solar / Micro Hydro Power Plants"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 2: | Line 2: | ||
= Overview = | = Overview = | ||
− | Purpose of the "[[:File: | + | Purpose of the "[[:File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|EnDev Indonesia Site Criteria Checklist]]" is to assess the suitability of a site to accommodate '''Pembangkit Listrik Tenaga Surya (PLTS)''' - '''(Solar Power Plants)''' or'''Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) '''facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.<br/> |
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | ||
Line 10: | Line 10: | ||
= Download = | = Download = | ||
− | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|left|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]] | + | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf|thumb|left|180px|Download: EnDev Indonesia Site Criteria Checklist (Solar / Micro Hydro Power Plant)|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMH.pdf]] |
− | |||
+ | <br/> | ||
= Further Information = | = Further Information = | ||
Line 27: | Line 27: | ||
<references /> | <references /> | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Mini-grid]] | ||
+ | [[Category:Solar]] | ||
+ | [[Category:Micro_Hydro]] | ||
+ | [[Category:Rural_Development]] | ||
+ | [[Category:Hydro]] | ||
[[Category:Rural_Electrification]] | [[Category:Rural_Electrification]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 04:33, 11 November 2014
Overview
Purpose of the "EnDev Indonesia Site Criteria Checklist" is to assess the suitability of a site to accommodate Pembangkit Listrik Tenaga Surya (PLTS) - (Solar Power Plants) orPembangkit Listrik Tenaga Mikro Hidro (PLTMH) - (Micro Hydro Power Plant) facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).
Download
Further Information
Reference