***** (***** | *****) (Created page with " thumb|right|180pxPurpose of this checklist is to assess the suitability of a site to accommodate...") |
***** (***** | *****) |
||
Line 1: | Line 1: | ||
− | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg|thumb|right|180px]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. | + | [[File:EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg|thumb|right|180px|alt=EnDev Indonesia Site Criteria Checklists for PLTS and PLTMHCover.jpg]]Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment. |
<br/> | <br/> | ||
Line 6: | Line 6: | ||
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs). | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Mini-grid]] | ||
+ | [[Category:Photovoltaic_(PV)]] | ||
+ | [[Category:Solar]] | ||
+ | [[Category:Micro_Hydro]] | ||
+ | [[Category:Rural_Development]] | ||
[[Category:Rural_Electrification]] | [[Category:Rural_Electrification]] | ||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 04:36, 17 July 2014
Purpose of this checklist is to assess the suitability of a site to accommodate PLTS or PLTMH facility. The checklist also considers available resources and anticipated demand for electricity. The checklist highlights the minimum data and information needed to make a first-level feasibility assessment.
Checklist is to be completed by the applicant for the PLTS or PLTMH infrastructure and submitted to the relevant decision-making authority, along with all supplementary information (e.g. site photographs).