Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development 2"

From energypedia
***** (***** | *****)
(Created page with "{{HPNET Project Database |HPNET name=End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development |HPNET des...")
 
***** (***** | *****)
m
 
(One intermediate revision by one other user not shown)
Line 1: Line 1:
 
{{HPNET Project Database
 
{{HPNET Project Database
|HPNET name=End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development
 
 
|HPNET description=Rural electrification designing and planning, especially for micro grid-connected communities, requires quality data to verify results. This data can be difficult to locate in current literature. Case studies which show not only the types of loads encountered in rural off-grid installations, but also the variation of loads and the daily load profile in the context of a limited output system are extremely useful in enabling further research in this field to expand the current pool of knowledge. This paper describes the end-use load monitoring work that has been performed in an East Malaysian village since 2010 and the challenges associated with data gathering and end-use monitoring in a rapidly-developing rural settin
 
|HPNET description=Rural electrification designing and planning, especially for micro grid-connected communities, requires quality data to verify results. This data can be difficult to locate in current literature. Case studies which show not only the types of loads encountered in rural off-grid installations, but also the variation of loads and the daily load profile in the context of a limited output system are extremely useful in enabling further research in this field to expand the current pool of knowledge. This paper describes the end-use load monitoring work that has been performed in an East Malaysian village since 2010 and the challenges associated with data gathering and end-use monitoring in a rapidly-developing rural settin
 
|HPNET author=Kyle Weber
 
|HPNET author=Kyle Weber
 
|HPNET organization=Masdar Institute of Science and Technology
 
|HPNET organization=Masdar Institute of Science and Technology
|HPNET project location=5.978839799999999, 116.07531990000007
+
|HPNET project location=5.9788398, 116.0753199
 
|HPNET region=Southeast Asia
 
|HPNET region=Southeast Asia
 
|HPNET product type=Documents
 
|HPNET product type=Documents
Line 15: Line 14:
 
|HPNET topic technology sub transmission=
 
|HPNET topic technology sub transmission=
 
|HPNET topic people sub=Productive End Use
 
|HPNET topic people sub=Productive End Use
 +
|HPNET name=End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development
 
}}
 
}}
 
{{HPNET File Upload
 
{{HPNET File Upload
 
|HPNET file type=External link
 
|HPNET file type=External link
 
|HPNET file internal=
 
|HPNET file internal=
|HPNET file external=[[End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development\ End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development]]
+
|HPNET file external=[[End-Use_Load_Monitoring_of_a_Community_Microgrid_in_Rural_East_Malaysia:_Challenges_Faced_During_a_Period_of_Rapid_Development| End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development]]
 
}}
 
}}

Latest revision as of 13:36, 29 July 2016


Banner2.png

WISIONS
Practical Action
EnDev Indonesia
Hydro Empowerment Network

KNOWLEDGE PRODUCT SUMMARY

Title
End-Use Load Monitoring of a Community Microgrid in Rural East Malaysia: Challenges Faced During a Period of Rapid Development
Type
Case Studies
Organization
Masdar Institute of Science and Technology
Region/Country
Southeast Asia
Malaysia
Website
no website
Contact
no contact
E-mail
no email
Year of publication
Description
Rural electrification designing and planning, especially for micro grid-connected communities, requires quality data to verify results. This data can be difficult to locate in current literature. Case studies which show not only the types of loads encountered in rural off-grid installations, but also the variation of loads and the daily load profile in the context of a limited output system are extremely useful in enabling further research in this field to expand the current pool of knowledge. This paper describes the end-use load monitoring work that has been performed in an East Malaysian village since 2010 and the challenges associated with data gathering and end-use monitoring in a rapidly-developing rural settin
Author / Producer
Kyle Weber
View / Download

FILTERING

Filter 1:
Region / Country
Southeast Asia
  • Malaysia
Filter 2:
Knowledge Product Type
Document
  • Case Studies
Filter 3:
Theme / Topic
People and Environment
  • Productive End Use