Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Felou Hydroelectric Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 18: Line 18:
 
|PRC type other=
 
|PRC type other=
 
|PRC technology hydro=Hydro
 
|PRC technology hydro=Hydro
|PRC technology hydro sub=Large; Micro/Pico; Small/Mini
 
 
|PRC abstract=The 59 MW hydropower plant to be constructed at Felou i s a run-off-river plant at a site about 200 km downstream of the hydropower dam of Manantali on the river Senegal and about 15 km from the town of Kayes (population at 86,500 in 2003).
 
|PRC abstract=The 59 MW hydropower plant to be constructed at Felou i s a run-off-river plant at a site about 200 km downstream of the hydropower dam of Manantali on the river Senegal and about 15 km from the town of Kayes (population at 86,500 in 2003).
  
Line 24: Line 23:
 
}}
 
}}
  
 +
[[Category:Project_Resource_Center]]
 +
[[Category:Small-Hydro/Mini-Hydro]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Micro-Hydro/Pico-Hydro]]
 +
[[Category:Large_Hydro]]
 +
[[Category:Hydro_(large)]]
 +
[[Category:Hydro]]
 +
[[Category:PRC_Project_Financing]]
 +
[[Category:Financing_and_Funding]]
 +
[[Category:Senegal]]
 +
[[Category:Mauritania]]
 +
[[Category:Mali]]
 
[[Category:PRC_Hydro]]
 
[[Category:PRC_Hydro]]
[[Category:Mali]]
 
[[Category:Mauritania]]
 
[[Category:Senegal]]
 
[[Category:Financing_and_Funding]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Hydro]]
 
[[Category:Hydro_(large)]]
 
[[Category:Large_Hydro]]
 
[[Category:Micro-Hydro/Pico-Hydro]]
 
[[Category:Micro_Hydro]]
 
[[Category:Small-Hydro/Mini-Hydro]]
 
[[Category:Project_Resource_Center]]
 

Revision as of 15:10, 11 February 2014



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type