Difference between revisions of "File:Provision of PV System Installation Verification Services.doc"

From energypedia
***** (***** | *****)
m (Text replace - "Template:License otherswork World Bank" to " {| cellspacing="8" cellpadding="0" style="width:100%; clear:both; text-align:left; margin:0.5em auto; background-color:#f9f9f9; border:2px solid #e0e0e0; " class="layouttemplate licensetpl")
***** (***** | *****)
m (Text replace - "PRC" to "REPRC")
Line 14: Line 14:
 
[[Category:Photovoltaic|{{PAGENAME}}]]
 
[[Category:Photovoltaic|{{PAGENAME}}]]
 
[[Category:PV|{{PAGENAME}}]]
 
[[Category:PV|{{PAGENAME}}]]
[[Category:PRC_Terms_of_Reference|{{PAGENAME}}]]
+
[[Category:REPRC_Terms_of_Reference|{{PAGENAME}}]]
 
[[Category:Project_Resource_Center|{{PAGENAME}}]]
 
[[Category:Project_Resource_Center|{{PAGENAME}}]]
 
[[Category:Hybrid_Systems|{{PAGENAME}}]]
 
[[Category:Hybrid_Systems|{{PAGENAME}}]]

Revision as of 15:06, 26 February 2014

Summary

The objective of this TOR is to confirm for each company participating to the grant, that 25 PV systems (PV modules or PV/wind hybrid systems) meet precise eligibility requirements. The systems are previously selected the Project Management Office (PMO) of the Commission in charge of State Economy and Trade. The consultant therefore confirms eligibility criteria through verification questionnaires and surveys.


Licensing

⧼wm-license-cc-wiki-link⧽
attribution NonCommercial
This file is licensed under the Creative CommonsAttribution-NonCommercial 4.0 International license.
You are free:
  • to share – to copy, distribute and transmit the work
  • to remix – to adapt the work
Under the following conditions:
  • attribution – You must attribute the work in the manner specified by the author or licensor (but not in any way that suggests that they endorse you or your use of the work).
  • NonCommercial – You may not use the material for commercial purposes.


File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:00, 27 September 2013 (133 KB)***** (***** | *****)The objective of this TOR is to confirm for each company participating to the grant, that 25 PV systems (PV modules or PV/wind hybrid systems) meet precise eligibility requirements. The systems are previously selected the Project Management Office (PMO...

There are no pages that use this file.