Difference between revisions of "Foundational Work to Improve the Energy Supply at Bugendana Socio-Pastoral Centre"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 2: | Line 2: | ||
|GBE project name=Foundational Work to Improve the Energy Supply at Bugendana Socio-Pastoral Centre | |GBE project name=Foundational Work to Improve the Energy Supply at Bugendana Socio-Pastoral Centre | ||
|GBE organisation=Archdiocese of Gitega | |GBE organisation=Archdiocese of Gitega | ||
− | |GBE date start= | + | |GBE date start=September 2019 |
− | |GBE date end= | + | |GBE date end=February 2020 |
|GBE project description=The purpose of the study is to assess the current and future demand for electricity in contrast to the current installed assets. Based on this assessment, various scenarios are proposed to upgrade the existing system with a least-cost approach, taking into consideration the use of energy as well as energy efficiency opportunities. This results in a list of possible system upgrades to allow for various intervention approaches. Based on the scenario overview, the system can be upgraded via other funds. This helps to lay the foundation for a lasting upgrade of the energy supply at the centre. | |GBE project description=The purpose of the study is to assess the current and future demand for electricity in contrast to the current installed assets. Based on this assessment, various scenarios are proposed to upgrade the existing system with a least-cost approach, taking into consideration the use of energy as well as energy efficiency opportunities. This results in a list of possible system upgrades to allow for various intervention approaches. Based on the scenario overview, the system can be upgraded via other funds. This helps to lay the foundation for a lasting upgrade of the energy supply at the centre. | ||
Revision as of 14:24, 18 September 2023
Foundational Work to Improve the Energy Supply at Bugendana Socio-Pastoral Centre
Last edit made by Helen Mengs on 2024-05-14. This is a wiki, do not hesitate to update information by clicking on "Edit with form".
Key Data
Organisation
Archdiocese of Gitega
Duration
September 2019 - February 2020
Project Description
The purpose of the study is to assess the current and future demand for electricity in contrast to the current installed assets. Based on this assessment, various scenarios are proposed to upgrade the existing system with a least-cost approach, taking into consideration the use of energy as well as energy efficiency opportunities. This results in a list of possible system upgrades to allow for various intervention approaches. Based on the scenario overview, the system can be upgraded via other funds. This helps to lay the foundation for a lasting upgrade of the energy supply at the centre.
GBE Component
Small Projects Fund
Categories
- Productive Use
- Business Development Support
Factsheet
Location
Country SPF
Burundi
Geographic coordinates of project site
3° 32' 20.08" S, 29° 54' 44.68" E
Latitude Longitude