Difference between revisions of "Geothermal Clean Energy Investment Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 18: Line 18:
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type other=
 
|PRC type other=
|PRC technology=Geothermal
+
|PRC technology geothermal=Geothermal
 
|PRC abstract=Investment in confirmation of geothermal resources and steam field development, as well as construction of the Steamfield Above-Ground System (SAGS) and power plants of approximately 110 MW and approximately 40 MW at the Ulubelu and Lahendong (Tompaso) geothermal fields, respectively.
 
|PRC abstract=Investment in confirmation of geothermal resources and steam field development, as well as construction of the Steamfield Above-Ground System (SAGS) and power plants of approximately 110 MW and approximately 40 MW at the Ulubelu and Lahendong (Tompaso) geothermal fields, respectively.
  
Line 24: Line 24:
 
}}
 
}}
  
 +
[[Category:Financing_and_Funding]]
 +
[[Category:Indonesia]]
 +
[[Category:Project_Resource_Center]]
 +
[[Category:PRC_Project_Financing]]
 +
[[Category:Geothermal]]
 
[[Category:PRC_Geothermal]]
 
[[Category:PRC_Geothermal]]
[[Category:Geothermal]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Project_Resource_Center]]
 
[[Category:Indonesia]]
 
[[Category:Financing_and_Funding]]
 

Revision as of 15:09, 11 February 2014



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type