Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Impact Monitoring Guidelines"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 22: Line 22:
 
| <font size="2">Terms for Consultants/ Enumerators</font>  
 
| <font size="2">Terms for Consultants/ Enumerators</font>  
 
|  
 
|  
*<font size="2">[[Sample Terms for Consultant for Impact Evaluation|Sample Terms]]</font> for national / international consultants  
+
*<font size="2">Sample Terms</font> for national / international consultants  
 
*Sample Terms for enumerators&nbsp;
 
*Sample Terms for enumerators&nbsp;
  
|  
+
| ToR Consultants:<br>
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=535 Tor Baseline Study (Rwanda PSP Hydro) german version]
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=536 ToR Survey french version]
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=537 ToR Evaluation english version]
 +
 
 
|  
 
|  
 
|-
 
|-
Line 54: Line 58:
  
 
|  
 
|  
 +
Rural Electrifciation:
 +
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=532 Result Chain german version]
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=533 Result Chain engl. version]
 +
*[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=534 Result Chain french version]
 
*Cooking&nbsp;[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=381 Energy Impacts, Observation Fields and Indicators]  
 
*Cooking&nbsp;[http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=381 Energy Impacts, Observation Fields and Indicators]  
 
*IA Kenya: [http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=183&&Itemid=13 Result Chain]  
 
*IA Kenya: [http://www.endev.info/index.php?option=com_docman&task=doc_download&gid=183&&Itemid=13 Result Chain]  

Revision as of 14:11, 24 November 2009

The focus of the EnDev 2 M&E Sytem has shifted from Outcome Monitoring (EnDev 1) to Outcome and Impact Monitoring (EnDev 2). Therefore the Monitoring Group are developing recommendations for a "proper" impact M&E System.

We recommend to:

  • use the recommended list of indicators
  • conduct baseline studies before project intervention and impact studies after households, social infrastructure or SMEs got access to a form of modern energy
  • a theory based approach by applying the result chain for developing the study design
  • use a mixed methods approach: the logic of the comparative advantages of methods: that means the mix of quantitative (standarised household interviews) and qualitative methods (open/ semi-structured interviews with key persons and households or focus group discussions)
  • to include control groups if possible (households which do not have acces to modern energy) into your baseline and impact study 

The following table shows typical steps for baseline and impact studies, which we would recommend and support.

Steps Tasks Materials/ Support Library
Step 1: Preperation Terms for Consultants/ Enumerators
  • Sample Terms for national / international consultants
  • Sample Terms for enumerators 
ToR Consultants:
Selection Consultant/ Enumerators
  • Consultants
Study of available documents and statistics on national development goals and policies, national sector goals and policies, BMZ goals and concept for the partner country
  • Checklist on relevant development goals
Developing of Results Chains/ Indicators

Rural Electrifciation:

Developing of Questionnaires, interview guidelines, PRA tools (MAPP), observation criteria and other tools 
  • Questionnaires for HH (stoves), stove producers, social institutions and restaurants using ICS
  • PRA tools for focus group discussions (MAPP)
  • Interview guidelines for village authorities
  • Observation criteria for stoves in use (example lists of good cooking practices and of stove conditions) 
Sampling/ Selection target Group
Training of Supervisors and Enumerators/ Pretesting
  • Training Material
  • Training Agenda
Step 2: Implementation Logistics


Conducting Interviews
Data entry
Step 3: Data Analysis/ Reporting Data analysis
Data interpretation – in exchange with the project team (in a workshop)
  • Checklist for data interpretation
Report writing