Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "MHP El Plan"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 210: Line 210:
 
|-
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Mini Grid:</span>
 
| style="width: 194px;" | <span style="line-height: 18px;">Mini Grid:</span>
| style="width: 390px;" | <span style="line-height: 18px;"></span>
+
| style="width: 390px;" | yes<span style="line-height: 18px;"></span>
 
|-
 
|-
 
| style="width: 194px;" | <span style="line-height: 18px;">Connection to national Grid:</span>
 
| style="width: 194px;" | <span style="line-height: 18px;">Connection to national Grid:</span>
Line 225: Line 225:
 
|}
 
|}
  
<br/>
 
 
<br/>
 
  
 
= Economic Information<br/> =
 
= Economic Information<br/> =
Line 261: Line 258:
 
|}
 
|}
  
<br/>
 
  
 
= Project Photos<br/> =
 
= Project Photos<br/> =
 +
 +
{| border="1" align="left" cellspacing="1" cellpadding="2" style="width: 600px;"
 +
|-
 +
| style="width: 50%;" | [[File:ElPlan.JPG|thumb|Add caption here]]
 +
| style="width: 50%;" |
 +
|-
 +
| style="width: 50%;" |
 +
| style="width: 50%;" |
 +
|}

Revision as of 20:53, 27 March 2014

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: 24 kW
Project Status: in operation
Comments: -




Operation Data

Gross Head: 200m
Net/Design Head: 200m
Flow (design flow): 20 l/s
Comments on flow variation during the year: Problems with flow during dry season.




Technical Information

Comments: General Technical Comments on the Project


Civil Works and Penstock

Dam construction material: Concrete
Dam Dimensions:
Storage Volume Reservoir:
Sedimentation Basin material: Concrete
Sedimentation Basin Dimensions:
Penstock Length:
Penstock Diameter at Beginning:
Penstock Diameter at End:
Penstock Changes of Diameter:
Penstock Material: PVC
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, 1 injector
Turbine Diameter:
Turbine Material:
Turbine Manufacturer: Nica Bosch (Contact: company does not exist any more)
Potencial (nominal): 24 kW
Rated Head:
Rated Flow:
Rated Speed:
Runaway Speed:
Shaft diameter and material:
Direction of Rotation: clockwise
Orientation of Shaft: horizontal

Generator:

Generator Manufacturer and Model: Stamford
Phases: 3
Potencial (nominal):
Nominal voltage:
Nominal Speed:
Frequency: 60 Hz
Isolation Class:

Mechanical Transmission / Coupling

Type of Belt:
Belt Manufacturer:
Distance between Pulleys:
Diameter of Generator Pulley:
Diameter of Generator Pulley:

Control System

Control System Manufacturer and Model: Thomson and Howe Energy Systems, J2
Type of Control: Load Control
Capacity:


Electrical Transmission

Mini Grid: yes
Connection to national Grid: no
Grid Voltage:
Diameter of Conductor:
Transformer Rating:


Economic Information

Developer: (Contact: )
Start of Construction:
Date of Commissioning:
Ownership / Operation Model:
Operator:
Tariff structure:
Connected Housholds: 25
Connection Cost Cost to be covered by houshold:
Overall Project Costs:


Project Photos

Add caption here