Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

MHP El Plan

From energypedia
Revision as of 18:41, 27 March 2014 by ***** (***** | *****)

Overview

Name of the site: El Plan
Country: Nicaragua (GPS Coordinates: ?)
Turbine Type: Pelton
Power Output: X kW
Project Status: in operation
Start of Construction: ?
Date of Commissioning: ?
Comments: ?



Operation Data

Gross Head:
Net Head:
Flow (design flow):
Comments on flow variation during the year:



Technical Information

Head:
Flow:
Turbine Type: Pelton
Country: Nicaragua (GPS Coordinates: ?)
Power Output: X kW
Start of Construction ?
Date of Commissioning: ?
Comments: ?



Civil Works and Penstock

Size of Dam:
Dam Material:
Desarenador:
Camera de Carga:
Penstock Diameter: X
Penstock Length:
Penstock Material: PVC
Dam Type
Dam Construction Material: X kW
Dam Height: ?
Dam Length: ?
Storage Volume Reservoir: ?
Security Valve:

Electromechanical Equipment

Turbine

Turbine Type: Pelton, x injectors
Turbine Manufacturer: (Contact:)
Potencial (nominal):
Rated Head:
Rated Flow:
Rated Speed: X
:
:
:
:
:
:
:

Generator:

Generator Manufacturer and Model:
Phases: 3
Potencial (nominal):
Nominal voltage:
Speed:
Frequenzy: X
Insolation Class:
:



Electrical Transmission

Mini Grid yes Connection to national Grid Voltage Transmission Conductor Diameter of Conductor Transformer Rating kvA


Economic Information

Developer: (Contact: )
Operator: (Contact: )
Ownership / Operation Model: Privately owned
Tariff structure: Not applicable
Cost: Connected Hounsholds Connection Cost Cost to be covered by houshold


Project Photos