The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in Septmber 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.  
+
The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.  
  
Click [[:file:Factsheet_ererti.pdf|here]] for more information.  
+
Click [[:file:Factsheet ererti.pdf|here]] for more information.  
  
 
<br> '''Start of Construction: '''August 2009  
 
<br> '''Start of Construction: '''August 2009  
Line 35: Line 35:
 
<br>  
 
<br>  
  
{| width="100%" cellspacing="1" cellpadding="1" border="0" class="FCK__ShowTableBorders"
+
{| cellspacing="1" cellpadding="1" border="0" width="100%" class="FCK__ShowTableBorders"
 
|-
 
|-
 
| [[Image:Ererti Fall.JPG|left|370px|Ererti Fall.JPG]]  
 
| [[Image:Ererti Fall.JPG|left|370px|Ererti Fall.JPG]]  

Revision as of 14:57, 28 August 2011

Location of the site:

  • Country: Ethiopia
  • District: Bona
  • Kebele: Beshiro Gute
  • River: Ererte
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


The MHP plant Ererte has a capacity of 33 kW and is planned to be inaugurated in September 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.

Click here for more information.


Start of Construction: August 2009

Date of Commissioning:


Ownership: Robot Electric Users Cooperative/community based cooperative society

Tariff Structure: Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured 
  • Turbine: T-15 cross flow turbine /Manufactured locally
  • Generator: MARELLI-Brushless Synchronous,1500 rpm, 42 KVA, 33.6KW, 50 Hz, Efficiency - 89%, 380/440V(adjustable), 3 phase series STAR
  • Grid: Low Voltage distribution with ABC cable and Wooden pole(2.76Km)


Ererti Fall.JPG
Ererti MHP site.JPG
Ererte waterfall
Ererte MHP site
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG
Ererte intake and canal
Locally Manufactured T-15 Turbine