Micro Hydro Power (MHP) - Ethiopia, Ererte

From energypedia
Revision as of 15:14, 26 July 2011 by ***** (***** | *****)

Location of the site:

  • Country: Ethiopia
  • District: Hula
  • Kebele: Beshiro Gute
  • River:
  • GPS coordinate: 6º33’26.8’’N 38º40’8.4’’ E


The MHP plant Ererte has a capacity of 33 kW and was inaugurated in May 2011. A total of approximately 200 households will be connected to the plant. The maximum number of potentially connectable households is 700.


Start of Construction: August 2009

Date of Commissioning:


Ownership: Robot Electric Users Cooperative/community based cooperative society

Tariff Structure: Flat rate/monthly based per appliance


Technical Specification:

  • Canal: Lined stone masonry having a length of 53m
  • Penstock: Mild stell having a diameter of 400mm and a length of 42m/locally manufactured 
  • Turbine:
    T-15 cross flow turbine /Manufactured locally
  • Generator:
  • Grid:
    Wooden pole, ABC cable(2.76Km)


Ererti Fall.JPG
Ererti MHP site.JPG
Ererti MHP weir ,Intake and canal.JPG
Locally Manufactured T-15 Turbine.JPG