Difference between revisions of "Micro Hydro Power (MHP) Haeusleberg Farm"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
 
(9 intermediate revisions by the same user not shown)
Line 3: Line 3:
  
 
'''<u>Location of the site:</u>'''
 
'''<u>Location of the site:</u>'''
*<u>Country</u>: [[Germany Energy Situation|Germany]]
+
*<u>Country</u>: [[Germany_Energy_Situation|Germany]]
 
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 
*<u>District</u>: <span style="color: rgb(34, 34, 34); font-family: arial, sans-serif; font-size: small; line-height: 16px">Baden-Württemberg</span>
 
*<u>River</u>: Schanzbach
 
*<u>River</u>: Schanzbach
Line 10: Line 10:
 
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 
<br/>This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
  
<br/>
 
  
 
= Further Information - Project<br/> =
 
= Further Information - Project<br/> =
Line 16: Line 15:
 
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
 
'''Start of Construction:''' December 2011<br/>'''Date of Commissioning:''' June 2012
  
<br/>
+
&nbsp;
  
 
'''Ownership / Operation Model:''' Privately owned
 
'''Ownership / Operation Model:''' Privately owned
Line 24: Line 23:
 
<br/>'''Turbine:''' Pelton
 
<br/>'''Turbine:''' Pelton
  
'''Generator:''' Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
+
'''Generator:'''&nbsp;Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)
  
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" style="width: 100%;"
+
{| class="FCK__ShowTableBorders" border="0" cellpadding="3" cellspacing="1" width="100%"
 
|-
 
|-
 
| colspan="2" |  
 
| colspan="2" |  
[[File:Haeusleberg farm.jpg|frame|center|180px|A view over the Häusleberg organic farm]]
+
[[File:Haeusleberg farm.jpg|frame|center|500x500px|A view over the Häusleberg organic farm]]
  
 
|-
 
|-
 
| colspan="2" |  
 
| colspan="2" |  
<br/>
+
<br/>&nbsp;
  
 
|-
 
|-
| [[File:Haeusleberg turbine 1.jpg|frame|center|80px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
+
| [[File:Haeusleberg turbine 1.jpg|frame|center|200x500px|Side view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
| [[File:Haeusleberg turbine 2.jpg|frame|center|80px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
+
| [[File:Haeusleberg turbine 2.jpg|frame|center|200x500px|Top view of the installed turbine atop the wooden framed drainage barrel.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
 
| <br/>
 
| <br/>
 
|-
 
|-
| [[File:Haeusleberg turbine 3.jpg|frame|center|80px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
+
| [[File:Haeusleberg turbine 3.jpg|frame|center|200x500px|The turbine from below showing the pelton runner at the nozzle mounting bracket.]]<br/>
| [[File:Haeusleberg turbine 4.jpg|frame|center|80px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
+
| [[File:Haeusleberg turbine 4.jpg|frame|center|200x500px|The stator of the direct drive motor during modifications for the 12 V hybrid system.]]<br/>
 
|-
 
|-
 
| <br/>
 
| <br/>
| <br/>
+
| &nbsp;<br/>
 
|-
 
|-
| [[File:Haeusleberg turbine 5.jpg|frame|center|80px|Nozzle alignment test.]]<br/>
+
| [[File:Haeusleberg turbine 5.jpg|frame|center|200x500px|Nozzle alignment test.]]<br/>
 
|  
 
|  
 
|-
 
|-
Line 55: Line 54:
 
|}
 
|}
  
<br/>
+
 
  
 
= Further Information<br/> =
 
= Further Information<br/> =
  
 
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
 
*project website: [https://sites.google.com/site/haeusleberg/ sites.google.com/site/haeusleberg/]
*[[Germany Energy Situation|Germany Energy situation]]
+
 
 +
 
  
 
= References<br/> =
 
= References<br/> =

Latest revision as of 12:22, 17 July 2014

Overview

Location of the site:

  • Country: Germany
  • District: Baden-Württemberg
  • River: Schanzbach
  • GPS Coordinates: 47º55’40.5’’N 7º55’31.2’’E


This pico pelton turbine is part of a hybrid system which supplies electricity to the Häusleberg Organic Farm. For more information please go to the project website: sites.google.com/site/haeusleberg/


Further Information - Project

Start of Construction: December 2011
Date of Commissioning: June 2012

 

Ownership / Operation Model: Privately owned

Tariff structure: Not applicable


Turbine: Pelton

Generator: Modified direct drive motor, 3 phase, 20 V, 150 W (approximately)

A view over the Häusleberg organic farm


 

Side view of the installed turbine atop the wooden framed drainage barrel.

Top view of the installed turbine atop the wooden framed drainage barrel.



The turbine from below showing the pelton runner at the nozzle mounting bracket.

The stator of the direct drive motor during modifications for the 12 V hybrid system.


 
Nozzle alignment test.



Further Information


References