This page summarizes experiences of management and working models for MHP in Peru. Most of the experience was gained before 2010, however it is still relevant.
 
  
= Key points of the operational model<br/> =
 
  
*The ''owner'' needs to be clearly defined.
+
= Overview<br/> =
*A ''user committee'' is formed for oversight (usually based on existing community organisation).
+
 
*''Tariffs'' are defined
+
This page summarizes experiences of management and working models for '''micro hydro power (MHP)''' in Peru.
*The ''operator'' appointed by open competition
+
 
*There is a ''contract'' linking owner and operator
+
Most of the experience was gained before 2010, however it is still relevant.
*There is a ''supply'' contract between operator and each consumer
+
 
 +
 
 +
 
 +
= Key Points of the Operational Model<br/> =
 +
 
 +
*The owner needs to be clearly defined.
 +
*A user committee is formed for oversight (usually based on existing community organisation).
 +
*Tariffs are defined
 +
*The operator appointed by open competition
 +
*There is a contract linking owner and operator
 +
*There is a supply contract between operator and each consumer
  
 
Often there is a need for training and awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.
 
Often there is a need for training and awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.
  
= Tariff structure and metering<br/> =
+
 
 +
 
 +
= Tariff Structure and Metering<br/> =
  
 
Tariffs for micro hydro and for grid extension are based on '''declining block tariffs '''to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)
 
Tariffs for micro hydro and for grid extension are based on '''declining block tariffs '''to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)
Line 30: Line 40:
 
'''Experience''' in Peru shows that expenditure by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.
 
'''Experience''' in Peru shows that expenditure by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.
  
= Ownership and contracts<br/> =
+
 
 +
 
 +
= Ownership and Contracts<br/> =
  
 
The owner has an agreement with the operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.
 
The owner has an agreement with the operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.
Line 45: Line 57:
  
 
The owner provides office and workshop for operator.
 
The owner provides office and workshop for operator.
 +
 +
  
 
== Operator<br/> ==
 
== Operator<br/> ==
  
The operator is responsible for:
+
<u>The operator is responsible for:</u>
  
 
*providing electricity service to subscribers at agreed hours
 
*providing electricity service to subscribers at agreed hours
Line 54: Line 68:
 
*maintenance of all equipment
 
*maintenance of all equipment
 
*keeping owner informed with regular reports
 
*keeping owner informed with regular reports
 +
 +
  
 
The operator agrees to provide good and prompt service to the users and allow access to equipment and books to owner and users association.
 
The operator agrees to provide good and prompt service to the users and allow access to equipment and books to owner and users association.
Line 59: Line 75:
 
Failure to comply with the agreement will involve penalties and possible termination of contract.
 
Failure to comply with the agreement will involve penalties and possible termination of contract.
  
== Users' committe<br/> ==
+
 
 +
 
 +
== Users' Committe<br/> ==
  
 
The users committee is arbitrator of disputes between users and operator.
 
The users committee is arbitrator of disputes between users and operator.
Line 65: Line 83:
 
The users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others. Members serve for one year, renewable once and then cannot be re-elected for at least one year.
 
The users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others. Members serve for one year, renewable once and then cannot be re-elected for at least one year.
  
The committee is responsible for:
+
<u>The committee is responsible for:</u>
  
 
*overseeing the conservation of the electrical service.
 
*overseeing the conservation of the electrical service.
Line 76: Line 94:
 
Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.
 
Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.
  
= Conflict resolution<br/> =
+
 
 +
 
 +
= Conflict Resolution<br/> =
  
 
Users can ask the committee to arbitrate on disputes over bills with the operator and the committee's decision is final apart from the right to resort to other legal means.
 
Users can ask the committee to arbitrate on disputes over bills with the operator and the committee's decision is final apart from the right to resort to other legal means.
Line 82: Line 102:
 
In the event of any dispute over a bill, the user must first try to solve it with the operator. If not satisfied, a user can then take his/her complaint to a member of the users' committee, who will hear both sides and then present his / her findings, together with his/her own opinion, to the committee. The committe who will vote on their decision.
 
In the event of any dispute over a bill, the user must first try to solve it with the operator. If not satisfied, a user can then take his/her complaint to a member of the users' committee, who will hear both sides and then present his / her findings, together with his/her own opinion, to the committee. The committe who will vote on their decision.
  
= Various information<br/> =
+
 
 +
 
 +
= Various Information<br/> =
  
 
Tariffs, penalties, provision of public lighting etc are decided once a year.
 
Tariffs, penalties, provision of public lighting etc are decided once a year.
  
Tariffs take account of:
+
<u>Tariffs take account of:</u>
  
 
*Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
 
*Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
Line 92: Line 114:
 
*Generator capacity
 
*Generator capacity
  
Users are expected to pay within 15 days of billing.Penalties are applied for late payment per day.
 
  
Consumers are disconnected if their payments are outstanding for 3 months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost
 
  
Bills may need to include tax
+
Users are expected to pay within 15 days of billing. Penalties are applied for late payment per day.
 +
 
 +
Consumers are disconnected if their payments are outstanding for three months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost.
 +
 
 +
Bills may need to include tax.
  
 
Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc
 
Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc
  
Contract with the operator can be terminated if service is unsatisfactory.Normally for 5 years renewable.
+
Contract with the operator can be terminated if service is unsatisfactory.Normally for five years renewable.
  
 
Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.
 
Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.
  
 +
 +
 +
= Further Information <br/> =
 +
 +
= References<br/> =
 +
 +
<references />
 +
 +
[[Category:Peru]]
 +
[[Category:Hydro]]
 
[[Category:Maintenance_box]]
 
[[Category:Maintenance_box]]
[[Category:Löschen/alt?]]
 

Revision as of 12:07, 19 October 2012

Maintenance: Revision needed
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there.

In particular the following aspects and passages have been specified to be in need for a revision:
(Specify aspects/passages here and delete this sentence).


Overview

This page summarizes experiences of management and working models for micro hydro power (MHP) in Peru.

Most of the experience was gained before 2010, however it is still relevant.


Key Points of the Operational Model

  • The owner needs to be clearly defined.
  • A user committee is formed for oversight (usually based on existing community organisation).
  • Tariffs are defined
  • The operator appointed by open competition
  • There is a contract linking owner and operator
  • There is a supply contract between operator and each consumer

Often there is a need for training and awareness raising of consumers about the necessity to pay for electricity – and penalties for not paying on time. This issue is discussed below.


Tariff Structure and Metering

Tariffs for micro hydro and for grid extension are based on declining block tariffs to ensure viability of the system and to encourage productive uses. (Tariffs for diesel-based mini grids are more likely to be fixed tariff per kWh as marginal cost does not reduce.)

  1. First block: normally 6070% of users – 20 kWh per month – enough for 2 or 3 lights and radio and possibly small black & white TV. First 10 kWh per month of this is fixed payment, regardless of whether consumed.
  2. Second block: slightly lower per kWh for additional appliances, e.g. fridge, colour TV – small percentage of domestic users plus small shops/businesses – e.g. ice-making, selling cold drinks
  3. Third block: lowest tariff for additional kWh above 2nd block mostly for productive/industrial users, e.g. welders, ice-makers, workshops, millers

In return for lower marginal tariffs these users agree to avoid peak domestic consumption hours for operation of heavy loads.

RTENOTITLE

Metering is essential for this type of tariff structure but it might be possible to offer the option of energy limiters for the first block with a fixed monthly bill (perhaps less than that for the full 20 kWh). The advantage would be that consumers would know in advance their maximum monthly bill.

Experience in Peru shows that expenditure by block one users is less than expenditure on kerosene, batteries etc. prior to electrification.


Ownership and Contracts

The owner has an agreement with the operator, which is a small enterprise, selected by competitive tender, and which would normally require training – see below.

Owner and operator are both represented on the users’ committee.

The owner receives the users’ revenue payments from the operator on a monthly basis, together with a report on the state of the system and the list of bills paid.The operator is paid an initial base fee plus a regular fee (20% of revenue) and the remaining of funds go into a rural electrification fund for operating expenses, spare parts, maintenance costs, system expansion etc. The accounts are available for inspection by the users' committee.

The owner provides all necessary tools and equipment and provides technical and management training to the operator.

The operator must keep all equipment in good condition, carry out maintenance and provide regular electricity service and payment facilities.

If the equipment is damaged by negligence of the operator then the operator is liable.

The owner provides office and workshop for operator.


Operator

The operator is responsible for:

  • providing electricity service to subscribers at agreed hours
  • billing and collection of payments in accordance wit tariffs agreed with owner.
  • maintenance of all equipment
  • keeping owner informed with regular reports


The operator agrees to provide good and prompt service to the users and allow access to equipment and books to owner and users association.

Failure to comply with the agreement will involve penalties and possible termination of contract.


Users' Committe

The users committee is arbitrator of disputes between users and operator.

The users committee normally consists of a president, vice president, secretary (who keeps minutes) and at least two others. Members serve for one year, renewable once and then cannot be re-elected for at least one year.

The committee is responsible for:

  • overseeing the conservation of the electrical service.
  • establishing and applying sanctions for non compliance, especially between users and operator,
  • monitoring the operator’s monthly reports and deciding whether the contract should be renewed after the five year period.
  • meeting once per month
  • keeping minutes
  • conducting their business without any religious, political, racial or social bias

Members do not receive a salary but get 30% discount off their electricity bills provided they attend regularly.


Conflict Resolution

Users can ask the committee to arbitrate on disputes over bills with the operator and the committee's decision is final apart from the right to resort to other legal means.

In the event of any dispute over a bill, the user must first try to solve it with the operator. If not satisfied, a user can then take his/her complaint to a member of the users' committee, who will hear both sides and then present his / her findings, together with his/her own opinion, to the committee. The committe who will vote on their decision.


Various Information

Tariffs, penalties, provision of public lighting etc are decided once a year.

Tariffs take account of:

  • Average annual cost of operation, maintenance, generation, distribution, billing, tariff collection, spares, equipment and operator fees.
  • Expected sales of electricity
  • Generator capacity


Users are expected to pay within 15 days of billing. Penalties are applied for late payment per day.

Consumers are disconnected if their payments are outstanding for three months, and re-connection is only done after payment of overdue bills including penalties and reconnection cost.

Bills may need to include tax.

Revenue goes into Electrification Fund account.The operator’s fees are paid from this account and the balance used for spares, maintenance, new connections, re-positioning poles etc

Contract with the operator can be terminated if service is unsatisfactory.Normally for five years renewable.

Operator is paid fixed fee on signing plus 20% of revenue collected for management and admin service.