Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Portal:Hydro"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 34: Line 34:
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Operation and Business Models'''</span></div>  
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Operation and Business Models'''</span></div>  
 
*[[Promotion of local planning|Promotion of local planning]] / design capacities  
 
*[[Promotion of local planning|Promotion of local planning]] / design capacities  
*Modes of operation (public, private, community-based, …)  
+
*[[Modes of operation|Modes of operation]] (public, private, community-based, …)  
 
*[[Promotion of private sector participation|Promotion of private sector participation]] – Operator models / business set-up  
 
*[[Promotion of private sector participation|Promotion of private sector participation]] – Operator models / business set-up  
 
*[[Metering and billing systems|Metering and billing systems]] (metering, flat-rate / limiters, pre-payment)  
 
*[[Metering and billing systems|Metering and billing systems]] (metering, flat-rate / limiters, pre-payment)  
Line 51: Line 51:
 
|-
 
|-
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Social and environmental Impacts '''</span></div>  
 
| <div style="border-bottom: 1px solid rgb(70, 130, 180); padding: 1px 4px; font-size: 120%; text-align: left;"><span style="color: rgb(0, 0, 0);">'''Social and environmental Impacts '''</span></div>  
*[[Socio-economic development|Socio-economic development]]
+
*[[Socio-economic development|Socio-economic development]]  
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Monitoring (socio-economic studies, baseline studies, …)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  
 
*Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)  

Revision as of 14:21, 14 June 2009

Hydro.jpg
 Welcome to the Hydro section


Technological Aspects
  • Civil engineering
  • Power equipment (turbines, generators, …)
  • Control equipment
  • Transfer of technology (incl. licensing issue)
  • Upgrading of water mills, rehabilitation of existing power plants
  • Local production capacity for power equipment, tubes, wiring etc.(technical and management capacity)
  • Institutional set-up
  • Overall institutional set-up at national level (incl. rural electrification agencies)
  • International organisations
  • How to Plan a MHPP in brief
Policy Framework
Operation and Business Models
Financing Models
  • Grants, subsidies
  • Soft loans
  • Commercial loans
  • Venture capital
  • Involvment of MFIs, commercial banks, governmental financial institutions
  • Risk coverage (for project preparation, for constrcution phase, operation phase)
Social and environmental Impacts
  • Socio-economic development
  • Monitoring (socio-economic studies, baseline studies, …)
  • Conflict-sensitive project design (incl. household selection, tariffs, cross-subsidization)
  • Social implications of load management
  • Integration of gender issues
  • Consumer awareness and communication
  • Environmental impact assessments
Climate change-related issues
Frequently Asked Questions
Projects
Library
External Links
Discussions