Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Preparation of Mini-Hydro Private Power Projects for Financial Closure"

From energypedia
***** (***** | *****)
***** (***** | *****)
Line 15: Line 15:
 
|PRC technology=Hydro
 
|PRC technology=Hydro
 
|PRC technology hydro=Small/Mini
 
|PRC technology hydro=Small/Mini
|PRC abstract=The TOR below describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase.
+
|PRC abstract=The TOR describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase.
 
}}
 
}}
  
 +
[[Category:Project_Resource_Center]]
 +
[[Category:PRC_Hydro]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:PRC_Hydro]]
 
[[Category:Project_Resource_Center]]
 

Revision as of 16:40, 2 December 2013



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type