Difference between revisions of "Preparation of Mini-Hydro Private Power Projects for Financial Closure"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
Line 1: Line 1:
 
 
{{RE Toolkit Database
 
{{RE Toolkit Database
 
|RET title=Preparation of Mini-Hydro Private Power Projects for Financial Closure
 
|RET title=Preparation of Mini-Hydro Private Power Projects for Financial Closure
Line 15: Line 14:
 
|RET type other=
 
|RET type other=
 
|RET technology=Small-Hydro/Mini-Hydro
 
|RET technology=Small-Hydro/Mini-Hydro
|RET abstract=The TOR below describes tasks to be undertaken to bring at least 2 mini-hydro subprojects, out of an initial long list of 20, to financial closure. The consultants will conduct the prefeasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on subprojects that have successfully obtained letters of intent from the utility for power purchase.
+
|RET abstract=Preparation of Mini-Hydro Private Power Projects for Financial Closure
 +
 
 +
 
 +
 
 +
The TOR below describes tasks to be undertaken to bring at least 2 mini-hydro subprojects, out of an initial long list of 20, to financial closure. The consultants will conduct the prefeasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on subprojects that have successfully obtained letters of intent from the utility for power purchase.
 
}}
 
}}
  
 +
[[Category:Project_Resource_Center]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:Project_Resource_Center]]
 

Revision as of 20:49, 30 September 2013