Difference between revisions of "Preparation of Mini-Hydro Private Power Projects for Financial Closure"
From energypedia
***** (***** | *****) |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
+ | |||
{{Project Resource Center | {{Project Resource Center | ||
|PRC title=Preparation of Mini-Hydro Private Power Projects for Financial Closure | |PRC title=Preparation of Mini-Hydro Private Power Projects for Financial Closure | ||
Line 13: | Line 14: | ||
|PRC type terms=Pipeline Development | |PRC type terms=Pipeline Development | ||
|PRC type other= | |PRC type other= | ||
− | |PRC technology=Hydro | + | |PRC technology hydro=Hydro |
− | |PRC technology hydro=Small/Mini | + | |PRC technology hydro sub=Small/Mini |
|PRC abstract=The TOR describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase. | |PRC abstract=The TOR describes tasks to be undertaken to bring at least 2 mini-hydro sub-projects, out of an initial long list of 20, to financial closure. The consultants will conduct the pre-feasibility studies on 10 candidates. The private developers will be responsible for doing the full feasibility studies on sub-projects that have successfully obtained letters of intent from the utility for power purchase. | ||
}} | }} | ||
+ | [[Category:Hydro]] | ||
+ | [[Category:PRC_Hydro]] | ||
[[Category:Project_Resource_Center]] | [[Category:Project_Resource_Center]] | ||
− | |||
− |
Revision as of 15:02, 11 February 2014
Title of Document | ' |
Abstract | |
File Download | |
Original Source | |
Year | |
Region/Country | |
Language(s) | |
Document Type | |
Technology | |
Connection Type |