Difference between revisions of "Private Power Generation (Bujagali) Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 18: Line 18:
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type financing=Examples of Economic & Financial Analysis
 
|PRC type other=
 
|PRC type other=
|PRC technology=General RE
+
|PRC technology general RE=General RE
 
|PRC technology solar=Photovoltaic (PV)
 
|PRC technology solar=Photovoltaic (PV)
 
|PRC abstract=Private Power Generation (Bujagali) Project - Uganda: the project is a 250 MW run of the river power plant with an adequate reservoir for daily storage, an intake powerhouse complex, and rock filled dam with a maximum height of about 30 meters, together with spillway and other associated works.
 
|PRC abstract=Private Power Generation (Bujagali) Project - Uganda: the project is a 250 MW run of the river power plant with an adequate reservoir for daily storage, an intake powerhouse complex, and rock filled dam with a maximum height of about 30 meters, together with spillway and other associated works.
Line 25: Line 25:
 
}}
 
}}
  
 +
[[Category:Solar]]
 +
[[Category:PRC_Solar]]
 +
[[Category:Uganda]]
 +
[[Category:PRC_Project_Financing]]
 +
[[Category:Project_Resource_Center]]
 
[[Category:Financing_and_Funding]]
 
[[Category:Financing_and_Funding]]
[[Category:Project_Resource_Center]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Uganda]]
 
[[Category:PRC_Solar]]
 
[[Category:Solar]]
 

Revision as of 15:02, 11 February 2014



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type