Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Private Power Generation (Bujagali) Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 19: Line 19:
 
|PRC type other=
 
|PRC type other=
 
|PRC technology general RE=General RE
 
|PRC technology general RE=General RE
|PRC technology solar=Photovoltaic (PV)
 
 
|PRC abstract=Private Power Generation (Bujagali) Project - Uganda: the project is a 250 MW run of the river power plant with an adequate reservoir for daily storage, an intake powerhouse complex, and rock filled dam with a maximum height of about 30 meters, together with spillway and other associated works.
 
|PRC abstract=Private Power Generation (Bujagali) Project - Uganda: the project is a 250 MW run of the river power plant with an adequate reservoir for daily storage, an intake powerhouse complex, and rock filled dam with a maximum height of about 30 meters, together with spillway and other associated works.
  
Line 25: Line 24:
 
}}
 
}}
  
 +
[[Category:Financing_and_Funding]]
 +
[[Category:Project_Resource_Center]]
 +
[[Category:PRC_Project_Financing]]
 +
[[Category:Uganda]]
 +
[[Category:PRC_Solar]]
 
[[Category:Solar]]
 
[[Category:Solar]]
[[Category:PRC_Solar]]
 
[[Category:Uganda]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Project_Resource_Center]]
 
[[Category:Financing_and_Funding]]
 

Revision as of 15:03, 11 February 2014



Title of Document '
Abstract
File Download
Original Source
Year
Region/Country
Language(s)
Document Type
Technology
Connection Type