Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Solar Home System (SHS) Costs"

From energypedia
***** (***** | *****)
m
***** (***** | *****)
m
Line 84: Line 84:
 
For an evaluation of these economic data, information on the quallity and sustainability of the SHS, as well as on O&M and services has to be collected. In addition, it has to be checked to what extent the target group of the poorer rural population could be reached within the different projects.  
 
For an evaluation of these economic data, information on the quallity and sustainability of the SHS, as well as on O&M and services has to be collected. In addition, it has to be checked to what extent the target group of the poorer rural population could be reached within the different projects.  
  
Source: Translated from the [http://www.endev.info/wiki/index.php/Subsidies_for_Solar_Home_Systems study conducted by SiNERGi] for EnDev (in German).
+
Source: Translated from the [http://www.endev.info/wiki/index.php/Subsidies_for_Solar_Home_Systems study on subsidies conducted by SiNERGi] for EnDev (in German).  
  
 
<br>
 
<br>

Revision as of 16:35, 2 September 2009

Compariosn of Costs and Subsidies

Country Example Model Market Costs in € per SHS Costumer Price in € Share of direkt Subsidies1
EnDev Nicaragua Cash Sales 600 (75-85 Wp) 220-280 54-63%
EnDev Honduras Two hand 576 (54 Wp) 231-301 60%
EnDev Bangladesh One hand 341 (50 Wp) 290 15%
EnDev Bangladesh II One hand 142-149 (21 Wp) 98-115 19-34%
EnDev Uganda Cash Sales 420 (50 Wp) 420 0%2
EnDev Senegal Concession 498 (50 Wp) 30 connection, 6 per month 70%
GTZ Tansania Cash Sales 200 (14 Wp) 200 0%
Roshan Pakistan Concession  ?? (40 Wp) 4,10 connection, 1,76 per month 100%
Solarstiftung Äthiopien Service NGO 200 (10 Wp) connection free, 0,17 per month 100%
Sunlabob Laos Service RESCO  ?? (20 Wp)  ?? connection, 2,5 per month 0%3
Sri Lanka RERED Two hand 372-437 (?30? Wp) 310-375 14-17%


1: of direct costs for the system and for installation, without O&M.
2: for private costumers, social infrastracture is subsidised with up to  85 % of costs.
3: but refinancing loans at discounted rates


For an evaluation of these economic data, information on the quallity and sustainability of the SHS, as well as on O&M and services has to be collected. In addition, it has to be checked to what extent the target group of the poorer rural population could be reached within the different projects.

Source: Translated from the study on subsidies conducted by SiNERGi for EnDev (in German).



⇒ Back to Solar Section