Make sure you register to our monthly newsletter, it's going out soon! Stay up do date about the latest energy news and our current activities.
Click here to register!

Difference between revisions of "Thermo-technical retrofitting of public buildings"

From energypedia
***** (***** | *****)
(Created page with "{{Biogas Project Database |BSP Project Name=Thermo-technical retrofitting of public buildings |BSP Project Desc=Within the project 'Energy efficiency in the grid connected ene...")
 
***** (***** | *****)
Line 1: Line 1:
 
{{Biogas Project Database
 
{{Biogas Project Database
 
|BSP Project Name=Thermo-technical retrofitting of public buildings
 
|BSP Project Name=Thermo-technical retrofitting of public buildings
|BSP Project Desc=Within the project 'Energy efficiency in the grid connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
+
|BSP Project Desc=Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
 
|BSP Project Budget=264.563.214,00 MNT
 
|BSP Project Budget=264.563.214,00 MNT
 
|BSP Project Status=Completed
 
|BSP Project Status=Completed
Line 8: Line 8:
 
|BSP Project End=2014/09/26
 
|BSP Project End=2014/09/26
 
|BSP Province Name=Khovd
 
|BSP Province Name=Khovd
|BSP Province=48.001732, 91.635858  
+
|BSP Province=48.001732, 91.635858
 
|BSP Organization=GIZ
 
|BSP Organization=GIZ
 
|BSP Tag Building=Building improvement
 
|BSP Tag Building=Building improvement
 
|BSP Tag Efficient=Efficient use of resources
 
|BSP Tag Efficient=Efficient use of resources
 
}}
 
}}
Building data and geometry:
 
Construction year: 1975
 
Cross volume: 3276.8 m3
 
thermal envelope: 1730.3 m2
 
Net volume: 2835 m3
 
net floor area: 799.3 m2
 
  
Implemented measures:
+
<u>Building data and geometry</u><br/>
Roof insulation with 20cm EPS- hard foam and waterproofing
 
Wall insulation with 15cm EPS- hard foam
 
New windows with 5-chamber plastic frame and double glazing
 
New exterior doors
 
Rehabilitation of the heating system
 
  
Contracting company: Tulgat bagana LLC
+
Construction year: 1975<br/>
 +
 
 +
Cross volume: 3276.8 m³<br/>
 +
 
 +
Thermal envelope: 1730.3 m²<br/>
 +
 
 +
Net volume: 2835 m³<br/>
 +
 
 +
Net floor area: 799.3 m²<br/>
 +
 
 +
<u>Implemented measures:</u><br/>
 +
 
 +
*Roof insulation with 20cm EPS- hard foam and waterproofing<br/>
 +
*Wall insulation with 15cm EPS- hard foam<br/>
 +
*New windows with 5-chamber plastic frame and double glazing<br/>
 +
*New exterior doors <br/>
 +
*Rehabilitation of the heating system<br/>
 +
 
 +
Contracting company: Tulgat bagana LLC<br/>

Revision as of 09:53, 13 November 2017

► Back to the Main Page

Key Project Data

Name
Thermo-technical retrofitting of public buildings
Description
Within the project 'Energy efficiency in the grid-connected energy supply' implemented by GIZ on behalf of the German federal Ministry for Economic Cooperation and Development (BMZ) and Swiss Development Cooperation (SDC) sixteen (16) have been retrofitted. This one of these buildings.
Project No.
Total Budget
264.563.214,00 MNT
Status
Icon Completed.png Completed
Timeframe
2014/07/22 - 2014/09/26
Type
other
Project Picture
No project picture uploaded.

Location in Mongolia

Province
Khovd
Loading map...

Further Information

Website
Factsheet
Organization
GIZ

Tagging

Publications

Currently, there are no publications related to this project.

Events

Currently, there are no events organized by this project.

Additional Comments



Building data and geometry

Construction year: 1975

Cross volume: 3276.8 m³

Thermal envelope: 1730.3 m²

Net volume: 2835 m³

Net floor area: 799.3 m²

Implemented measures:

  • Roof insulation with 20cm EPS- hard foam and waterproofing
  • Wall insulation with 15cm EPS- hard foam
  • New windows with 5-chamber plastic frame and double glazing
  • New exterior doors
  • Rehabilitation of the heating system

Contracting company: Tulgat bagana LLC