Difference between revisions of "Toolbox Entry/02"

From energypedia
***** (***** | *****)
(Created page with "{{TUEWAS ToolboxDB |TUW title=Analysis of Indian Electricity Distribution Systems for the Integration of High Shares of Rooftop PV |TUW author=Energynautics GmbH, GSES India |...")
 
***** (***** | *****)
 
Line 10: Line 10:
 
|TUW geographic=India
 
|TUW geographic=India
 
|TUW location=Delhi and Bhopal
 
|TUW location=Delhi and Bhopal
 +
|TUW file=002_Analysis of Indian Electricity Distribution Systems for the Integration of High Shares of Rooftop PV.pdf
 
|TUW reference=Integration of Renewable Energies in the Indian Electricity System (I-RE), Indo German Energy Programme
 
|TUW reference=Integration of Renewable Energies in the Indian Electricity System (I-RE), Indo German Energy Programme
 
|TUW url=https://www.energyforum.in/fileadmin/user_upload/india/media_elements/publications/05_GIZ_PV_Integration_India_Summary_Report.pdf
 
|TUW url=https://www.energyforum.in/fileadmin/user_upload/india/media_elements/publications/05_GIZ_PV_Integration_India_Summary_Report.pdf
 
|TUW abstract=Under the current national target based on National Solar Mission, 40 GW of rooftop PV shall be connected in India by 2022. To reach this target, a good understanding of the Indian power system, its regulatory frameworks, and the similarities and differences with other countries that have already deployed a large share of rooftop PV has to be developed by all stakeholders involved in the process. The study intends to provide an overview of the characteristics of the Indian power system and its problems with regard to a large scale rooftop PV rollout, as well as a template for distribution companies on how to deal with rising PV shares, which studies to conduct and which technology options to select. The scope of the study also includes detailed modelling and simulation of four different distribution grid feeders in Delhi and Bhopal.
 
|TUW abstract=Under the current national target based on National Solar Mission, 40 GW of rooftop PV shall be connected in India by 2022. To reach this target, a good understanding of the Indian power system, its regulatory frameworks, and the similarities and differences with other countries that have already deployed a large share of rooftop PV has to be developed by all stakeholders involved in the process. The study intends to provide an overview of the characteristics of the Indian power system and its problems with regard to a large scale rooftop PV rollout, as well as a template for distribution companies on how to deal with rising PV shares, which studies to conduct and which technology options to select. The scope of the study also includes detailed modelling and simulation of four different distribution grid feeders in Delhi and Bhopal.
 
}}
 
}}

Latest revision as of 12:33, 24 November 2022

► Back to the Toolbox

Last edited on 24/11/2022 by Hector Alfaro
(Date format: DD/MM/YYYY)

General Information

ID Number
02
Main Author
Energynautics GmbH, GSES India
Publication Year
2017
Type of Entry
Study Report


Enabling Distributed Technologies
  • Distributed generation (solar)






Which of the above categories best describe the material
Distribution planning
Geographical Scope of the Publication
India
Location within country
Delhi and Bhopal
File
Reference project name
Integration of Renewable Energies in the Indian Electricity System (I-RE), Indo German Energy Programme


URL
Abstract
Under the current national target based on National Solar Mission, 40 GW of rooftop PV shall be connected in India by 2022. To reach this target, a good understanding of the Indian power system, its regulatory frameworks, and the similarities and differences with other countries that have already deployed a large share of rooftop PV has to be developed by all stakeholders involved in the process. The study intends to provide an overview of the characteristics of the Indian power system and its problems with regard to a large scale rooftop PV rollout, as well as a template for distribution companies on how to deal with rising PV shares, which studies to conduct and which technology options to select. The scope of the study also includes detailed modelling and simulation of four different distribution grid feeders in Delhi and Bhopal.