= Definition  =
 
  
Venture capital is a type of private equity that refers to equity investments made, typically in less mature companies, for the launch, early development, or expansion of a business. Venture investment is most often found in the application of new technology, new marketing concepts and new products that have yet to be proven.
+
[[Portal:Hydro|►Back to Hydro Portal]]
  
Venture capital is a very important source of funding for startups that do not have access to capital markets. It typically entails high risk for the investor, but it has the potential for above-average returns.
+
= Overview =
  
''Definition by [http://www.investopedia.com/terms/v/venturecapital.asp Investopedia] ''<br>  
+
== Definition<br/> ==
  
= Venture Capital for Financing Micro-Hydro in Rwanda (GTZ Case Study)  =
+
Venture capital is a type of private equity that refers to equity investments made, typically in less mature companies, for the launch, early development, or expansion of a business. Venture investment is most often found in the application of new technology, new marketing concepts and new products that have yet to be proven.
  
In the project, “'''PSP Hydro'''” 6 Rwandan companies are being awarded a 50% subsidy to build and operate 6 micro-hydro plants and mini-grids supplying rural areas with electricity. So far 5 projects are in process of preparation and implementation. In preparation of the '''PSP Hydro II''', possible future finance instruments and mechanisms have to be identified. Many instruments are already available to project developers and it is recommended to include venture capitalists early in the selection procedure of new project developers.  
+
Venture capital is a very important source of funding for startups that do not have access to capital markets. It typically entails high risk for the investor, but it has the potential for above-average returns<ref name="Definition by Investopedia">Definition by Investopedia </ref>.
  
== Financial institutes and available instruments for micro hydro  ==
+
<br/>
  
The traditional financial sector in Rwanda is composed of:
+
= Venture Capital for Financing Micro-Hydro in Rwanda (GTZ Case Study) =
  
*a national bank (Banque National de Rwanda, BNR),  
+
[[:File:Psp hydro rwanda baseline report - rwi2009.pdf|PSP Hydro”]] 6 Rwandan companies are being awarded a maximum subsidy of 50% of the total project costs to build and operate 6 micro-hydro plants and mini-grids supplying rural areas with electricity. Since the beginning of the second phase of the project in 2009, the construction of 2 hydropower plants has been completed and 3 projects are in the process of preparation and implementation. Previously, in preparation of '''PSP Hydro II''', possible future finance instruments and mechanisms were also identified. Many instruments were already available to project developers and it was recommended to include venture capitalists early in the selection procedure of new project developers.
*a development bank (Banque Rwandaise de Developpement, BRD),  
+
 
*a housing bank (Rwanda Housing Bank, RHB) and  
+
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]<br/>
 +
 
 +
<br/>
 +
 
 +
== Financial Institutes and Available Instruments for Micro Hydro ==
 +
 
 +
The traditional financial sector in Rwanda is composed of:
 +
 
 +
*a national bank (Banque National de Rwanda, BNR),
 +
*a development bank (Banque Rwandaise de Developpement, BRD),
 +
*a housing bank (Rwanda Housing Bank, RHB) and
 
*six commercial banks (BCR, BCDI, BANCOR, FINA BANK, COGEBANQUE, BK).
 
*six commercial banks (BCR, BCDI, BANCOR, FINA BANK, COGEBANQUE, BK).
  
Two years ago three parties started within the banking sector to offer leasing products (BRD, BRC and BK) and they formed the leasing association of Rwanda. Also guarantee mechanisms are in place: the African Solidarity Fund (ASF) operates from Niger and the African Guarantee Fund and Economic Cooperation (FAGACE) operates from Benin.  
+
Two years ago three parties started within the banking sector to offer leasing products (BRD, BRC and BK) and they formed the leasing association of Rwanda. Also guarantee mechanisms are in place: the African Solidarity Fund (ASF) operates from Niger and the African Guarantee Fund and Economic Cooperation (FAGACE) operates from Benin.
 +
 
 +
Further, two venture capital funds to support the private sector have been recently opened their doors: Rwanda Enterprise Investment Company (REIC) and GROFIN. They both had contacts with project developers.
 +
 
 +
It can be summarized that the PSP Hydro project contributed making micro hydro an interesting possibility to finance for the majority of financial institutions. So far, several disbursements have been made and commercial banks continue to be involved in the financing of new projects. At this stage, conditions offered to project developers in micro hydro are in line with long term finance conditions in other segments of the economy.
 +
 
 +
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
 +
 
 +
== Perspectives on Finance and Bottlenecks in Micro Hydro ==
 +
 
 +
The bottlenecks are presented from different perspectives: banks, venture capitalists, developers, ministry and donors. It is interesting to note that these bottlenecks differ with the perspectives of those parties. A classical example is the difference between bankers and venture capitalists.
 +
 
 +
A banker’s main focus is risk mitigation whereas a venture capitalist main focus is to build on an opportunity. A venture capitalist (VC) will focus on the management and its capability to generate future cash flows. When a bank focuses on risk mitigation the contribution of the sponsor is important, therefore the debt/equity ratio. It is all about the ability of the sponsor to bring in cash or collateral if the project goes wrong. Of course a good banker will also evaluate the management and the project but if sufficient subsidy is involved the debt/equity ratio will provide sufficient comfort. Therefore the subsidy is perceived by the bankers as an instrument to fulfill the equity requirement of the project developer. For the project developer the subsidy is an instrument to get access to a loan. It will add to the project’s equity and therefore reduces the debt equity ratio. However the venture capitalist will perceive this subsidy as a possible weakness: it might reduce the commitment of the sponsors, it might transfer ownership from the sponsors to the donor. The sponsors might get a free ride and in case of problems ask the donor to solve it. However the donor will most likely build on its own regulations to limit support to a certain maximum contribution. The donor can offer financial and technical support without too much risk.
 +
 
 +
The Table below presents the above perspectives and also how the parties have put instruments in place to overcome the challenges or mitigate the risks involved (this is written under the heading Actual Instruments). A potential alternative instrument is presented in the last column in line with a future possibly more market oriented approach to help to overcome the bottleneck.
 +
 
 +
[[File:Bottlenecks related to finance.jpg|thumb|center|300px|Perspectives on bottlenecks related to finance]]
 +
 
 +
It seems that venture capital can contribute to solve problems for many parties. From the perspective of the banks it is real equity and gives direct comfort (lower gearing). Therefore the requirement for loans might be lower. The venture capitalist will make sure that the developers will put in sufficient money themselves. Moreover their VC contribution and the PSP Hydro II contribution will generate extra capital. The developers will have business development support for financial planning on board from the venture capitalist. This is preferable compared to an external advisor. The ministry and donors can leverage their money each investment cycle. The subsidy can be used more efficiently and more often.
 +
 
 +
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
 +
 
 +
== Bottlenecks Related to Project Developers Capacity and Skills ==
 +
 
 +
Different bottlenecks on the implementation capacity and the skills of the project developers were identified by a selection of interviewed stakeholders. These bottlenecks are presented in the next table.
 +
 
 +
[[File:Bottlenecks related to project developers capacity and skills.jpg|thumb|center|300px|Perspectives on bottlenecks related to project developers capacity and skills]]
 +
 
 +
From different perspectives it is mentioned that the early involvement of venture capitalist will contribute to strengthen the management of projects and will also help to build local capacity within these venture capital firms to guide future investors and financiers. As soon as the two venture capital funds have done a few investments, this expertise will sustain within these organizations. Moreover it will be easy for the VCs to communicate with the banking sector on their specific requirements and concerns.
  
Further, two venture capital funds to support the private sector have been recently opened their doors: Rwanda Enterprise Investment Company ([[REIC|REIC]]) and [[GROFIN|GROFIN]]. They both had contacts with project developers.
+
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
  
It can be summarized that the PSP Hydro contributed to the situation that micro hydro is now considered by the majority of the financial institutions as a finance possibility. All agreements to the project developers are still at an early stage, some disbursements have been made, and therefore it is too early to indicate whether in future it will be considered a good finance opportunity. At this stage, conditions offered to project developers in micro hydro are in line with long term finance conditions in other segments of the economy.
+
<br/>
  
== Perspectives on finance and bottlenecks in micro hydro  ==
+
== General Conclusions from the Case Study ==
  
The bottlenecks are presented from different perspectives: banks, venture capitalists, developers, ministry and donors. It is interesting to note that these bottlenecks differ with the perspectives of those parties. A classical example is the difference between bankers and venture capitalists.  
+
*Besides the subsidy, venture capital, loans and guarantee instruments are available to micro hydro project developers in Rwanda.
 +
*An early involvement of venture capitalists can help to select business oriented entrepreneurs and sound business plans.
 +
*The mission visited two venture capital funds. GROFIN has a track record in Africa, works with reputable investors and good management. GROFIN has experience with the pro’s and con’s of matching its own finance with finance form local banks. The management of GROFIN has been contacted and expressed an interest to further explore co-investments in micro hydro. The second venture capital fund visited was REIC. It has also reputable, mainly local investors. Project portfolio is young. Senior project staff, but not yet national management, has expressed an interest to explore future cooperation with PSP Hydro II. Their appetite and competence needs to be explored further.
  
A banker’s main focus is risk mitigation whereas a venture capitalist main focus is to build on an opportunity. A venture capitalist (VC) will focus on the management and its capability to generate future cash flows. When a bank focuses on risk mitigation the contribution of the sponsor is important, therefore the debt/equity ratio. It is all about the ability of the sponsor to bring in cash or collateral if the project goes wrong. Of course a good banker will also evaluate the management and the project but if sufficient subsidy is involved the debt/equity ratio will give too much comfort. Therefore the subsidy is perceived by the bankers as an instrument to fulfill the equity requirement of the project developer. For the project developer the subsidy is an instrument to get access to a loan. It will add to the project’s equity and therefore reduces the debt equity ratio. However the venture capitalist will perceive this subsidy as a possible weakness: it might reduce the commitment of the sponsors, it might transfer ownership from the sponsors to the donor. The sponsors might get a free ride and in case of problems ask the donor to solve it. However the donor will most likely build on its own regulations to limit itself to a certain maximum contribution. The donor can offer financial and technical support without too much risk.
+
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
  
The Table below presents the above perspectives and also how the parties have put instruments in place to overcome the challenges or mitigate the risks involved (this is written under the heading Actual Instruments). A potential alternative instrument is presented in the last column in line with a future possibly more market oriented approach to help to overcome the bottleneck.
+
== Recommendations on Finance for Next Steps of PSP Hydro ==
  
[[Image:Bottlenecks related to finance.jpg|thumb|center|200px|Perspectives on bottlenecks related to finance]]
+
Based on the above described experiences and conclusions, a mix of available market instruments for the next phase of PSP II can be presented. These instruments (venture capital, loans and guarantee instruments) are suitable to support a more autonomous development of the sector.
  
It seems that venture capital can contribute to solve problems for many parties. From the perspective of the banks it is real equity and gives direct comfort (lower gearing). Therefore the requirement for loans might be lower. The venture capitalist will make sure that the developers will put in sufficient money themselves. Moreover their VC contribution and the PSP Hydro II contribution will generate extra capital. The developers will have business development support for financial planning on board from the venture capitalist. This is better compared to an external advisor. The ministry and donors can leverage their money each investment cycle. The subsidy can be used more efficiently and more often.
+
[[File:Mix of financial instruments.jpg|thumb|center|300px|Mix of financial instruments]]
  
== Bottlenecks related to project developers capacity and skills  ==
+
The participation of the venture capitalist has a potential positive effect on the leverage of the subsidy later on in the process (+), assuming that the VC will stay in, they will also bring money to the table. VC involvement can also have a positive effect (+) on screening the developers for their business credentials and trustworthiness. This is VC core business and therefore a realistic expectation. The VC involvement in the selection procedure has a positive effect on market distortion (it does not distort the market). Project developers are driven by their plans and intentions and not by the subsidy.
  
Different bottlenecks on the implementation capacity and the skills of the project developers were identified by a selection of interviewed stakeholders. These bottlenecks are presented in the next table.  
+
Ownership and management are two criteria where the PSP Hydro project is expected to receive assistance from the venture capitalist and therefore marked very positive (++). The financial and technical scrutinizing of the business plan will be done in more detail at the second phase. The PSP Hydro II project can offer a small grant to the winners of step 1 (e.g. € 5000). The successful project developers can use that money to buy in technical expertise. This will contribute to technical capacity of the project developers and most like contributes to the market capacity in these services as well. This is marked as positive (+) in the table.
  
[[Image:Bottlenecks related to project developers capacity and skills.jpg|thumb|center|Perspectives on bottlenecks related to project developers capacity and skills]]
+
It is unclear yet how much the connection costs per household will be affected. One could argue that less subsidy makes the total costs (for an investor) higher. However the costs related to borrowed money might induce a more efficient use of funds and end up in lower total investment costs per project. Therefore the score is presented as neutral (+/-).
  
From different perspectives it is mentioned that the early involvement of venture capitalist will contribute to strengthen the management of projects and will also help to build local capacity within these venture capital firms to guide future investors and financiers. As soon as the two venture capital funds have done a few investments, this expertise will sustain within these organizations. Moreover it will be easy for the VCs to communicate with the banking sector on their specific requirements and concerns.  
+
In the table the use of venture capital is expected to have similar positive contribution over the investing period as compared to the selection stage. The difference is that venture capital itself is expected to generate a higher leverage of the subsidy. If the project developer and the venture capitalist and the PSP Hydro project would bring in equal amounts of money, the leverage of the PSP Hydro II component would be at least two times. Moreover the money is also leveraged with debt and finally, the money is repaid and ready to be used again<ref name="Review of micro hydro financing instruments in Rwanda. Support mission to the GTZ PSP hydro project, by René Magermans">Review of micro hydro financing instruments in Rwanda. Support mission to the GTZ PSP hydro project, by René Magermans</ref>.
  
== General conclusions from the case study  ==
+
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
  
*Next to subsidy, venture capital, loans and guarantee instruments are available to micro hydro project developers in Rwanda.
+
== Status in PSP Hydro Rwanda in 2012 ==
*An early venture capitalist approach can help to select business oriented entrepreneurs and sound business plans.
 
*The mission visited two venture capital funds. GROFIN has a track record in Africa, works with reputable investors and good management. GROFIN has experience with the pro’s and con’s of matching its own finance with finance form local banks. Management of the GROFIN has been contacted and expressed an interest to further explore co-investments in micro hydro. The second venture capital fund visited was REIC. It has also reputable, mainly local investors. Project portfolio is young. Senior project staff, but not yet national management, has expressed an interest to explore future cooperation with PSP Hydro II. Their appetite and competence needs to be explored further.
 
  
== Recommendations on finance for next steps '''PSP Hydro'''  ==
+
Due to the limited capacity of the project developers regarding the preparation of business plans during the early stages of the project, no MHP developer has finalized a contract with a venture capital provider in Rwanda so far. One company is still in the process of negotiating the modalities for investment.
  
Based on the above described experiences and conclusions, a mix of available market instruments for the next phase of PSP II can be presented. These instruments (venture capital, loans and guarantee instruments) are suitable to support a more autonomous development of the sector.
+
[[Venture Capital for Financing Hydropower#toc|►Go to Top]]
  
[[Image:Mix of financial instruments.jpg|thumb|center|Mix of financial instruments]]
+
= Further Information =
  
The participation of the venture capitalist has a potential positive effect on the leverage of the subsidy later on in the process (+), assuming that the VC will stay in, they will also bring money to the table. It will also have a positive effect (+) on selecting good guys from bad guys at the beginning. This is VC core business and therefore a realistic expectation. The VC involvement in the selection procedure has a positive effect on market distortion (it does not distort the market). Project developers are driven by their plans and intentions and not by the subsidy.
+
*[[Portal:Financing and Funding|Financing and Funding portal on energypedia]]
  
Ownership and Management are two criteria were the PSP Hydro project is expected to receive assistance from the venture capitalist and therefore marked very positive (++). The financial and technical scrutinizing of the business plan will be done in more detail at the second phase. The PSP Hydro II project can offer a small grant to the winners of step 1 (e.g. € 5000). The successful project developers can use that money to buy in technical expertise. This will contribute to technical capacity of the project developers and most like contributes to the market capacity in these services as well. This is marked as positive (+) in the table.
+
= References =
  
It is unclear yet how much the connection costs per household will be effected. One could argue that less subsidy makes the total costs (for an investor) higher. However the costs related to borrowed money might induce a more efficient use of funds and end up in lower total investment costs per project. Therefore the score is presented as neutral (+/-).
+
<references /><br/>
  
In the table the use of venture capital is expected to have similar positive contribution over the investing period as compared to the selection stage. The difference is that venture capital itself is expected to generate a higher leverage of the subsidy. If the project developer and the venture capitalist and the PSP Hydro project would bring in equal amounts of money, the leverage of the PSP Hydro II component would be at least two times. Moreover the money is also leveraged with debt and finally, the money is repaid and ready to be used again.
+
[[Category:Financing_and_Funding]]
 +
[[Category:Micro_Hydro]]
 +
[[Category:Financing_Hydropower]]
 +
[[Category:Hydro]]
 +
[[Category:Rwanda]]

Latest revision as of 11:42, 11 June 2015

►Back to Hydro Portal

Overview

Definition

Venture capital is a type of private equity that refers to equity investments made, typically in less mature companies, for the launch, early development, or expansion of a business. Venture investment is most often found in the application of new technology, new marketing concepts and new products that have yet to be proven.

Venture capital is a very important source of funding for startups that do not have access to capital markets. It typically entails high risk for the investor, but it has the potential for above-average returns[1].


Venture Capital for Financing Micro-Hydro in Rwanda (GTZ Case Study)

PSP Hydro” 6 Rwandan companies are being awarded a maximum subsidy of 50% of the total project costs to build and operate 6 micro-hydro plants and mini-grids supplying rural areas with electricity. Since the beginning of the second phase of the project in 2009, the construction of 2 hydropower plants has been completed and 3 projects are in the process of preparation and implementation. Previously, in preparation of PSP Hydro II, possible future finance instruments and mechanisms were also identified. Many instruments were already available to project developers and it was recommended to include venture capitalists early in the selection procedure of new project developers.

►Go to Top


Financial Institutes and Available Instruments for Micro Hydro

The traditional financial sector in Rwanda is composed of:

  • a national bank (Banque National de Rwanda, BNR),
  • a development bank (Banque Rwandaise de Developpement, BRD),
  • a housing bank (Rwanda Housing Bank, RHB) and
  • six commercial banks (BCR, BCDI, BANCOR, FINA BANK, COGEBANQUE, BK).

Two years ago three parties started within the banking sector to offer leasing products (BRD, BRC and BK) and they formed the leasing association of Rwanda. Also guarantee mechanisms are in place: the African Solidarity Fund (ASF) operates from Niger and the African Guarantee Fund and Economic Cooperation (FAGACE) operates from Benin.

Further, two venture capital funds to support the private sector have been recently opened their doors: Rwanda Enterprise Investment Company (REIC) and GROFIN. They both had contacts with project developers.

It can be summarized that the PSP Hydro project contributed making micro hydro an interesting possibility to finance for the majority of financial institutions. So far, several disbursements have been made and commercial banks continue to be involved in the financing of new projects. At this stage, conditions offered to project developers in micro hydro are in line with long term finance conditions in other segments of the economy.

►Go to Top

Perspectives on Finance and Bottlenecks in Micro Hydro

The bottlenecks are presented from different perspectives: banks, venture capitalists, developers, ministry and donors. It is interesting to note that these bottlenecks differ with the perspectives of those parties. A classical example is the difference between bankers and venture capitalists.

A banker’s main focus is risk mitigation whereas a venture capitalist main focus is to build on an opportunity. A venture capitalist (VC) will focus on the management and its capability to generate future cash flows. When a bank focuses on risk mitigation the contribution of the sponsor is important, therefore the debt/equity ratio. It is all about the ability of the sponsor to bring in cash or collateral if the project goes wrong. Of course a good banker will also evaluate the management and the project but if sufficient subsidy is involved the debt/equity ratio will provide sufficient comfort. Therefore the subsidy is perceived by the bankers as an instrument to fulfill the equity requirement of the project developer. For the project developer the subsidy is an instrument to get access to a loan. It will add to the project’s equity and therefore reduces the debt equity ratio. However the venture capitalist will perceive this subsidy as a possible weakness: it might reduce the commitment of the sponsors, it might transfer ownership from the sponsors to the donor. The sponsors might get a free ride and in case of problems ask the donor to solve it. However the donor will most likely build on its own regulations to limit support to a certain maximum contribution. The donor can offer financial and technical support without too much risk.

The Table below presents the above perspectives and also how the parties have put instruments in place to overcome the challenges or mitigate the risks involved (this is written under the heading Actual Instruments). A potential alternative instrument is presented in the last column in line with a future possibly more market oriented approach to help to overcome the bottleneck.

Perspectives on bottlenecks related to finance

It seems that venture capital can contribute to solve problems for many parties. From the perspective of the banks it is real equity and gives direct comfort (lower gearing). Therefore the requirement for loans might be lower. The venture capitalist will make sure that the developers will put in sufficient money themselves. Moreover their VC contribution and the PSP Hydro II contribution will generate extra capital. The developers will have business development support for financial planning on board from the venture capitalist. This is preferable compared to an external advisor. The ministry and donors can leverage their money each investment cycle. The subsidy can be used more efficiently and more often.

►Go to Top

Bottlenecks Related to Project Developers Capacity and Skills

Different bottlenecks on the implementation capacity and the skills of the project developers were identified by a selection of interviewed stakeholders. These bottlenecks are presented in the next table.

Perspectives on bottlenecks related to project developers capacity and skills

From different perspectives it is mentioned that the early involvement of venture capitalist will contribute to strengthen the management of projects and will also help to build local capacity within these venture capital firms to guide future investors and financiers. As soon as the two venture capital funds have done a few investments, this expertise will sustain within these organizations. Moreover it will be easy for the VCs to communicate with the banking sector on their specific requirements and concerns.

►Go to Top


General Conclusions from the Case Study

  • Besides the subsidy, venture capital, loans and guarantee instruments are available to micro hydro project developers in Rwanda.
  • An early involvement of venture capitalists can help to select business oriented entrepreneurs and sound business plans.
  • The mission visited two venture capital funds. GROFIN has a track record in Africa, works with reputable investors and good management. GROFIN has experience with the pro’s and con’s of matching its own finance with finance form local banks. The management of GROFIN has been contacted and expressed an interest to further explore co-investments in micro hydro. The second venture capital fund visited was REIC. It has also reputable, mainly local investors. Project portfolio is young. Senior project staff, but not yet national management, has expressed an interest to explore future cooperation with PSP Hydro II. Their appetite and competence needs to be explored further.

►Go to Top

Recommendations on Finance for Next Steps of PSP Hydro

Based on the above described experiences and conclusions, a mix of available market instruments for the next phase of PSP II can be presented. These instruments (venture capital, loans and guarantee instruments) are suitable to support a more autonomous development of the sector.

Mix of financial instruments

The participation of the venture capitalist has a potential positive effect on the leverage of the subsidy later on in the process (+), assuming that the VC will stay in, they will also bring money to the table. VC involvement can also have a positive effect (+) on screening the developers for their business credentials and trustworthiness. This is VC core business and therefore a realistic expectation. The VC involvement in the selection procedure has a positive effect on market distortion (it does not distort the market). Project developers are driven by their plans and intentions and not by the subsidy.

Ownership and management are two criteria where the PSP Hydro project is expected to receive assistance from the venture capitalist and therefore marked very positive (++). The financial and technical scrutinizing of the business plan will be done in more detail at the second phase. The PSP Hydro II project can offer a small grant to the winners of step 1 (e.g. € 5000). The successful project developers can use that money to buy in technical expertise. This will contribute to technical capacity of the project developers and most like contributes to the market capacity in these services as well. This is marked as positive (+) in the table.

It is unclear yet how much the connection costs per household will be affected. One could argue that less subsidy makes the total costs (for an investor) higher. However the costs related to borrowed money might induce a more efficient use of funds and end up in lower total investment costs per project. Therefore the score is presented as neutral (+/-).

In the table the use of venture capital is expected to have similar positive contribution over the investing period as compared to the selection stage. The difference is that venture capital itself is expected to generate a higher leverage of the subsidy. If the project developer and the venture capitalist and the PSP Hydro project would bring in equal amounts of money, the leverage of the PSP Hydro II component would be at least two times. Moreover the money is also leveraged with debt and finally, the money is repaid and ready to be used again[2].

►Go to Top

Status in PSP Hydro Rwanda in 2012

Due to the limited capacity of the project developers regarding the preparation of business plans during the early stages of the project, no MHP developer has finalized a contract with a venture capital provider in Rwanda so far. One company is still in the process of negotiating the modalities for investment.

►Go to Top

Further Information

References

  1. Definition by Investopedia
  2. Review of micro hydro financing instruments in Rwanda. Support mission to the GTZ PSP hydro project, by René Magermans