The paper is about the importance of organized&nbsp;rural Electrification, cause otherwise it will be done illegal. Behind every customer are 1,3 illegal connected consumers.
 
  
 +
The paper is about the importance of organized [[Rural Electrification|rural Electrification]], cause otherwise it will be done illegal. Behind every customer are 1,3 illegal connected consumers.
  
 +
<br/>
  
 
<u>There are 2 Options to run the grid:</u>
 
<u>There are 2 Options to run the grid:</u>
 
 
#SBEE runs the grid and arranges all 10 steps to connect customers to the grid
 
#SBEE runs the grid and arranges all 10 steps to connect customers to the grid
#A independent grid operator runs the Grid and deals with the customers, the independent grid operator&nbsp;gets the energy for his grid from SBEE and also arranges all 10 steps to connect the customers to the grid
+
#A independent grid operator runs the Grid and deals with the customers, the independent grid operator gets the energy for his grid from SBEE and also arranges all 10 steps to connect the customers to the grid
  
 +
<br/>
  
 +
<br/>
  
== Further Information<br/> ==
+
= Further Information<br/> =
  
*[[Rural_electrification_in_Benin_*French_new*#Annexe.C2.A0-_Fiche_de_sp.C3.A9cifications_type.C2.A0|Annex: List of needed materials for connecting to the grid]]
+
*Annex: List of needed materials for connecting to the grid
 +
*[[File:1 - outil de traitement réseau secondaire.xls|180px|Exceltool to calculate the equipment cost for the distribution network|alt=Exceltool to calculate the equipment cost for the distribution network]]
 +
*[[File:Guide de l animteur dgis.doc|180px|Manual for the DGIS advisor in Benin|alt=Manual for the DGIS advisor in Benin]]
 +
*[[File:Approche planif ied.ppt|180px|Approach of the rural electrification in Benin|alt=Approach of the rural electrification in Benin]]
 +
*[[File:Plan de communication final kassa.doc|180px|How to communicate the benefits of electricty|alt=How to communicate the benefits of electricty]]
 +
*[[:File:STRATEGIE_DE_DISTRIBUTION_DES_CARTES_PREPAYEES.pdf| Distribution of prepaid electricity cards]]
  
*[[File:1 - outil de traitement réseau secondaire.xls|Exceltool to calculate the equipment cost for the distribution network]]
+
<br/>
*[[File:Guide de l animteur dgis.doc|Manual for the DGIS advisor in Benin]]
 
*[[File:Approche planif ied.ppt|Approach of the rural electrification in Benin]]
 
*[[File:Plan de communication final kassa.doc|How to communicate the benefits of electricty]]
 
*[http://energypedia.info/index.php/File:STRATEGIE_DE_DISTRIBUTION_DES_CARTES_PREPAYEES.pdf Distribution of prepaid electricity cards]
 
  
 +
<br/>
  
= Méthode de traitement de demande de branchements secondaires =
+
= Méthode de traitement de demande de branchements secondaires<br/> =
 
</div>
 
</div>
<font size="2">L’objectif de la méthode décrite ci-dessous est de permettre aux populations rurales de se raccorder à un coût soutenable, c'est-à-dire en rapport avec leurs moyens, tout en évitant l’anarchie et l’insécurité propres aux «&nbsp;toiles d’araignée&nbsp;». Ce phénomène ne peut en effet plus être ignoré. Une enquête effectuée dans le village de Copargo (Atacora) a montré que derrière chaque abonné recensé, se cache 1,3 abonné non déclaré. Tandis qu’à Perma (Atacora), il a été relevé une longueur moyenne des lignes «&nbsp;sauvages&nbsp;» de 200 mètres, celles-ci pouvant atteindre 500 mètres.</font>
+
<font size="2">L’objectif de la méthode décrite ci-dessous est de permettre aux populations rurales de se raccorder à un coût soutenable, c'est-à-dire en rapport avec leurs moyens, tout en évitant l’anarchie et l’insécurité propres aux « toiles d’araignée ». Ce phénomène ne peut en effet plus être ignoré. Une enquête effectuée dans le village de Copargo (Atacora) a montré que derrière chaque abonné recensé, se cache 1,3 abonné non déclaré. Tandis qu’à Perma (Atacora), il a été relevé une longueur moyenne des lignes « sauvages » de 200 mètres, celles-ci pouvant atteindre 500 mètres.</font>
  
 +
<br/>
  
 +
<u><font size="2">La méthode proposée laisse les décideurs de la SBEE ou les acteurs régionaux choisir entre 2 options :</font></u>
 +
#<font size="2">Un « Réseau Secondaire Allégé » opéré par la SBEE. Ce réseau secondaire qui répond à un certain nombre de normes techniques, fera donc partie du patrimoine de la SBEE. Il pourra ultérieurement, en fonction des besoins, être renforcé ou bien étendu.</font>
 +
#<font size="2">Un « Réseau Secondaire en Régie », toléré par la SBEE et opéré par un autre opérateur que la SBEE : entreprise privé, commune, association, coopérative, etc. Pour être connecté au réseau primaire par la SBEE, ce réseau doit satisfaire à un certain nombre de normes techniques.</font>
  
<u><font size="2">La méthode proposée laisse les décideurs de la SBEE ou les acteurs régionaux choisir entre 2 options&nbsp;:</font></u>
+
<font size="2">Dans les 2 cas, on ne parle plus de « toile d’araignée » mais de réseau secondaire puisque celui-ci est construit selon des exigences techniques acceptables aussi bien pour les populations que pour la SBEE : la qualité de tension et la solidité des lignes sont assurées.</font>
 
 
#<font size="2">Un «&nbsp;Réseau Secondaire Allégé&nbsp;» opéré par la SBEE. Ce réseau secondaire qui répond à un certain nombre de normes techniques, fera donc partie du patrimoine de la SBEE. Il pourra ultérieurement, en fonction des besoins, être renforcé ou bien étendu.</font>
 
#<font size="2">Un «&nbsp;Réseau Secondaire en Régie&nbsp;», toléré par la SBEE et opéré par un autre opérateur que la SBEE&nbsp;: entreprise privé, commune, association, coopérative, etc. Pour être connecté au réseau primaire par la SBEE, ce réseau doit satisfaire à un certain nombre de normes techniques.</font>
 
 
 
<font size="2">Dans les 2 cas, on ne parle plus de «&nbsp;toile d’araignée&nbsp;» mais de réseau secondaire puisque celui-ci est construit selon des exigences techniques acceptables aussi bien pour les populations que pour la SBEE&nbsp;: la qualité de tension et la solidité des lignes sont assurées.</font>
 
  
 
<font size="2">En même temps, il ne faut pas perdre de vue la logique de performance sociale et financière du réseau par l’optimisation de son taux de couverture, donc en encourageant le raccordement à moindre coût de nouveaux abonnés.</font>
 
<font size="2">En même temps, il ne faut pas perdre de vue la logique de performance sociale et financière du réseau par l’optimisation de son taux de couverture, donc en encourageant le raccordement à moindre coût de nouveaux abonnés.</font>
  
 +
<br/>
  
 
+
== Procédure pour l’option 1 : « Réseau Secondaire Allégé » ==
== Procédure pour l’option 1&nbsp;: «&nbsp;Réseau Secondaire Allégé&nbsp;» ==
 
  
 
<font size="2">Dans ce cas, le réseau secondaire nouvellement construit appartient à la SBEE qui en assure l’entretien. La SBEE peut décider ultérieurement des extensions ou des renforcements. La responsabilité de la SBEE s’arrête au compteur de l’abonné, comme dans une configuration classique.</font>
 
<font size="2">Dans ce cas, le réseau secondaire nouvellement construit appartient à la SBEE qui en assure l’entretien. La SBEE peut décider ultérieurement des extensions ou des renforcements. La responsabilité de la SBEE s’arrête au compteur de l’abonné, comme dans une configuration classique.</font>
  
 +
<br/>
  
 +
<u><font size="2">La procédure proposée comporte 10 étapes :</font></u>
  
<u><font size="2">La procédure proposée comporte 10 étapes&nbsp;:</font></u>
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;1</font>
+
<font size="2">1</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Organisation de la population et contact d’un agent SBEE</font>
 
<font size="2">Organisation de la population et contact d’un agent SBEE</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;2</font>
+
<font size="2">2</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Plan de masse</font>
 
<font size="2">Plan de masse</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;3</font>
+
<font size="2">3</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Rendez-vous avec l’agent SBEE pour étude</font>
 
<font size="2">Rendez-vous avec l’agent SBEE pour étude</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;4</font>
+
<font size="2">4</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Etude de la faisabilité technico-économique de la ligne secondaire</font>
 
<font size="2">Etude de la faisabilité technico-économique de la ligne secondaire</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;5</font>
+
<font size="2">5</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
<font size="2">Etablissement d’un devis</font>
+
<font size="2">Etablissement d’un devis</font><br/>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;6</font>
+
<font size="2">6</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Collecte de fonds</font>
 
<font size="2">Collecte de fonds</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;7</font>
+
<font size="2">7</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Travaux</font>
 
<font size="2">Travaux</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;8</font>
+
<font size="2">8</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Conformité</font>
 
<font size="2">Conformité</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;9</font>
+
<font size="2">9</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Raccordement du réseau secondaire au réseau primaire</font>
 
<font size="2">Raccordement du réseau secondaire au réseau primaire</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
<font size="2">10</font>
 
<font size="2">10</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite</font>
 
<font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite</font>
  
 
|}
 
|}
  
 
+
<br/>
  
 
<u>Description:</u>
 
<u>Description:</u>
  
{| cellpadding="0" cellspacing="0" border="1"
+
{| cellspacing="0" cellpadding="0" border="1"
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">1</font>'''
 
'''<font size="2">1</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Organisation de la population et contact d’un agent SBEE&nbsp;:</font></u>'''
+
'''<u><font size="2">Organisation de la population et contact d’un agent SBEE :</font></u>'''
  
 
<font size="2">La population qui souhaite se raccorder, s’organise afin '''de contacter un agent de la SBEE '''au niveau de la direction régionale ou d’une agence SBEE locale.</font>
 
<font size="2">La population qui souhaite se raccorder, s’organise afin '''de contacter un agent de la SBEE '''au niveau de la direction régionale ou d’une agence SBEE locale.</font>
Line 138: Line 140:
 
<font size="2">Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place un comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées '''en considérant les''' '''possibilités de regroupement sur une même ligne à construire'''.</font>
 
<font size="2">Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place un comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées '''en considérant les''' '''possibilités de regroupement sur une même ligne à construire'''.</font>
  
<font size="2">En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut détacher un de ses agents pour accompagner, informer et former les populations concernées ou ses représentants. Ce travail est justifié par l’intérêt de la SBEE à augmenter le taux de raccordement. Il pourrait être financé sur&nbsp;:</font>
+
<font size="2">En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut détacher un de ses agents pour accompagner, informer et former les populations concernées ou ses représentants. Ce travail est justifié par l’intérêt de la SBEE à augmenter le taux de raccordement. Il pourrait être financé sur :</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">une partie des coûts de branchement,</font>
+
<span><font size="2">-</font><span></span></span><font size="2">une partie des coûts de branchement,</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">une partie de l’énergie vendue, intégrée par exemple dans le prix de la carte à prépaiement ,</font>
+
<span><font size="2">-</font><span></span></span><font size="2">une partie de l’énergie vendue, intégrée par exemple dans le prix de la carte à prépaiement ,</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">ses fonds propres.</font>
+
<span><font size="2">-</font><span></span></span><font size="2">ses fonds propres.</font>
  
 
<font size="2">La SBEE a également la possibilité de déléguer ce travail d’animation auprès des services techniques des communes en les ayant préalablement formés.</font>
 
<font size="2">La SBEE a également la possibilité de déléguer ce travail d’animation auprès des services techniques des communes en les ayant préalablement formés.</font>
Line 150: Line 152:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">2</font>'''
 
'''<font size="2">2</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Plan de masse&nbsp;:</font></u>'''
+
'''<u><font size="2">Plan de masse :</font></u>'''
  
<font size="2">L’agent SBEE ou un représentant de la population réalise un '''schéma sommaire''' sur lequel il reporte&nbsp;:</font>
+
<font size="2">L’agent SBEE ou un représentant de la population réalise un '''schéma sommaire''' sur lequel il reporte :</font>
  
<span><font size="2">1.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,</font>
+
<span><font size="2">1.</font><span></span></span><font size="2">le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,</font>
  
<span><font size="2">2.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.</font>
+
<span><font size="2">2.</font><span></span></span><font size="2">les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.</font>
  
<font size="2">Pour chaque regroupement à desservir à partir d’une ligne secondaire&nbsp;:</font>
+
<font size="2">Pour chaque regroupement à desservir à partir d’une ligne secondaire :</font>
  
<span><font size="2">3.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">le nombre de ménages,</font>
+
<span><font size="2">3.</font><span></span></span><font size="2">le nombre de ménages,</font>
  
<span><font size="2">4.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,</font>
+
<span><font size="2">4.</font><span></span></span><font size="2">La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,</font>
  
<span><font size="2">5.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">la longueur de réseau nécessaire à construire,</font>
+
<span><font size="2">5.</font><span></span></span><font size="2">la longueur de réseau nécessaire à construire,</font>
  
<span><font size="2">6.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">la puissance d’équipement électrique que chaque ménage compte installer.</font>
+
<span><font size="2">6.</font><span></span></span><font size="2">la puissance d’équipement électrique que chaque ménage compte installer.</font>
  
<span><font size="2">7.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">La volonté et capacité des ménages à payer pour leur raccordement,</font>
+
<span><font size="2">7.</font><span></span></span><font size="2">La volonté et capacité des ménages à payer pour leur raccordement,</font>
  
<span><font size="2">8.</font><span>&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">Les potentiels d’éventuels futurs raccordements&nbsp;: potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.</font>
+
<span><font size="2">8.</font><span></span></span><font size="2">Les potentiels d’éventuels futurs raccordements : potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.</font>
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">3</font>'''
 
'''<font size="2">3</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Rendez-vous avec l’agent SBEE pour étude&nbsp;:</font></u>'''
+
'''<u><font size="2">Rendez-vous avec l’agent SBEE pour étude :</font></u>'''
  
 
<font size="2">Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent SBEE et si possible un agent communal '''conviennent d’un rendez-vous.'''</font>
 
<font size="2">Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent SBEE et si possible un agent communal '''conviennent d’un rendez-vous.'''</font>
Line 200: Line 202:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">4</font>'''
 
'''<font size="2">4</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Etude de la faisabilité technico-économique&nbsp;:</font></u>'''
+
'''<u><font size="2">Etude de la faisabilité technico-économique :</font></u>'''
  
 
<font size="2">A l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ, '''l’agent SBEE évalue la faisabilité technique et économique des raccordements'''. Ce dernier remet une fiche pré-imprimée de spécifications techniques qui seront à respecter par l’électricien (local ou SBEE) en charge des travaux.</font>
 
<font size="2">A l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ, '''l’agent SBEE évalue la faisabilité technique et économique des raccordements'''. Ce dernier remet une fiche pré-imprimée de spécifications techniques qui seront à respecter par l’électricien (local ou SBEE) en charge des travaux.</font>
  
<font size="2">Dans le cadre de programmes spécifiques d’accompagnement, type «&nbsp;projet DGIS&nbsp;», ou «&nbsp;programme ''<span>Facilité Energie&nbsp;»</span>'', les électriciens locaux pourraient bénéficier de formations sur le respect des spécifications techniques.</font>
+
<font size="2">Dans le cadre de programmes spécifiques d’accompagnement, type « projet DGIS », ou « programme ''<span>Facilité Energie »</span>'', les électriciens locaux pourraient bénéficier de formations sur le respect des spécifications techniques.</font>
 
 
<font size="2">Cette fiche présentée en annexe, récapitule&nbsp;:</font>
 
  
 +
<font size="2">Cette fiche présentée en annexe, récapitule :</font>
 
#<font size="2">Le point de raccordement sur le réseau primaire,</font>
 
#<font size="2">Le point de raccordement sur le réseau primaire,</font>
 
#<font size="2">Le nombre de ménages à raccorder,</font>
 
#<font size="2">Le nombre de ménages à raccorder,</font>
Line 224: Line 225:
 
#<font size="2">Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)</font>
 
#<font size="2">Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)</font>
 
#<font size="2">Le coût estimatif de la ligne</font>
 
#<font size="2">Le coût estimatif de la ligne</font>
#<font size="2">Le type de poteaux&nbsp;: poteau bois + poteau béton d’effort</font>
+
#<font size="2">Le type de poteaux : poteau bois + poteau béton d’effort</font>
 
#<font size="2">Le matériel annexe (encrage, suspension, etc.).</font>
 
#<font size="2">Le matériel annexe (encrage, suspension, etc.).</font>
  
Line 231: Line 232:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">5</font>'''
 
'''<font size="2">5</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Etablissement d’un devis&nbsp;:</font></u>'''
+
'''<u><font size="2">Etablissement d’un devis :</font></u>'''
  
<font size="2">L’électricien local et/ou l’agent SBEE '''propose''' '''un devis''' '''sur la base des spécifications établies sur la fiche&lt;span /&gt;'''</font>. Ainsi, les futurs clients ont le choix du constructeur du réseau secondaire pour bénéficier de tarifs compétitifs. En effet si les tarifs ne sont pas compétitifs, l’usager sera de nouveau tenté par les «&nbsp;toiles d’araignée&nbsp;». Dans tous les cas, la SBEE devra in fine approuver la conformité du réseau secondaire avant de l’intégrer dans son patrimoine.
+
<font size="2">L’électricien local et/ou l’agent SBEE '''propose''' '''un devis''' '''sur la base des spécifications établies sur la fiche&lt;span /&gt;'''</font>. Ainsi, les futurs clients ont le choix du constructeur du réseau secondaire pour bénéficier de tarifs compétitifs. En effet si les tarifs ne sont pas compétitifs, l’usager sera de nouveau tenté par les « toiles d’araignée ». Dans tous les cas, la SBEE devra in fine approuver la conformité du réseau secondaire avant de l’intégrer dans son patrimoine.
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">6</font>'''
 
'''<font size="2">6</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Collecte de fonds&nbsp;:</font></u>'''
+
'''<u><font size="2">Collecte de fonds :</font></u>'''
  
 
<font size="2">'''La population s’organise pour collecter les fonds '''nécessaires aux travaux. Comme suggéré en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité '''forme''' les futurs usagers à l’utilisation rationnelle de l’énergie.</font>
 
<font size="2">'''La population s’organise pour collecter les fonds '''nécessaires aux travaux. Comme suggéré en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité '''forme''' les futurs usagers à l’utilisation rationnelle de l’énergie.</font>
Line 263: Line 264:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">7</font>'''
 
'''<font size="2">7</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Travaux&nbsp;:</font></u>'''
+
'''<u><font size="2">Travaux :</font></u>'''
  
 
<font size="2">Après accord avec l’électricien en charge des travaux (local ou SBEE) et versement des frais de raccordement par les bénéficiaires, l’électricien '''effectue les''' '''travaux de ligne secondaire''' en respectant les spécifications techniques.</font>
 
<font size="2">Après accord avec l’électricien en charge des travaux (local ou SBEE) et versement des frais de raccordement par les bénéficiaires, l’électricien '''effectue les''' '''travaux de ligne secondaire''' en respectant les spécifications techniques.</font>
Line 279: Line 280:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">8</font>'''
 
'''<font size="2">8</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Conformité&nbsp;:</font></u>'''
+
'''<u><font size="2">Conformité :</font></u>'''
  
 
<font size="2">Une fois les travaux réalisés, l’électricien contacte l’agent SBEE pour '''vérification de la conformité technique des installations''', ceci dans le cas où les travaux n’ont pas été réalisés par la SBEE.</font>
 
<font size="2">Une fois les travaux réalisés, l’électricien contacte l’agent SBEE pour '''vérification de la conformité technique des installations''', ceci dans le cas où les travaux n’ont pas été réalisés par la SBEE.</font>
Line 297: Line 298:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">9</font>'''
 
'''<font size="2">9</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Raccordement du réseau secondaire au réseau primaire&nbsp;:</font></u>'''
+
'''<u><font size="2">Raccordement du réseau secondaire au réseau primaire :</font></u>'''
  
 
<font size="2">'''Une fois l’installation''' '''conforme, la SBEE effectue le raccordement''' '''effectif du réseau secondaire au réseau primaire BT.'''</font>
 
<font size="2">'''Une fois l’installation''' '''conforme, la SBEE effectue le raccordement''' '''effectif du réseau secondaire au réseau primaire BT.'''</font>
Line 317: Line 318:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">10</font>'''
 
'''<font size="2">10</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite&nbsp;:</font></u>'''
+
'''<u><font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite :</font></u>'''
  
 
<font size="2">Un agent SBEE avec l’appui des représentants des clients (par exemple, le comité d’électrification) a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.</font>
 
<font size="2">Un agent SBEE avec l’appui des représentants des clients (par exemple, le comité d’électrification) a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.</font>
Line 333: Line 334:
 
<font size="2">Toute nouvelle demande de branchement même sur un réseau secondaire existant devra faire l’objet d’un bilan technique sommaire de la ligne électrique en utilisant l’outil d’aide à la décision ci-joint. '''Ce sera notamment l’occasion de vérifier que les spécifications initialement remises sont toujours respectées''', et plus particulièrement que des branchements non autorisés n’aient pas eu lieu entre-temps.</font>
 
<font size="2">Toute nouvelle demande de branchement même sur un réseau secondaire existant devra faire l’objet d’un bilan technique sommaire de la ligne électrique en utilisant l’outil d’aide à la décision ci-joint. '''Ce sera notamment l’occasion de vérifier que les spécifications initialement remises sont toujours respectées''', et plus particulièrement que des branchements non autorisés n’aient pas eu lieu entre-temps.</font>
  
&nbsp;
+
<br/>
  
 
<font size="2">Avant branchement, les nouveaux ménages à raccorder remboursent aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût total de la ligne secondaire. De cette façon, les initiateurs de la ligne ont intérêt à ce que les nouveaux abonnés se branchent selon la procédure normalisée pour bénéficier du remboursement de la quote-part des travaux.</font>
 
<font size="2">Avant branchement, les nouveaux ménages à raccorder remboursent aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût total de la ligne secondaire. De cette façon, les initiateurs de la ligne ont intérêt à ce que les nouveaux abonnés se branchent selon la procédure normalisée pour bénéficier du remboursement de la quote-part des travaux.</font>
  
<font size="2">De plus, la SBEE peut décider de mesures dissuasives de branchement illicites. Ainsi, en cas de branchement additionnel non autorisé sur un client existant, la SBEE peut déconnecter l’abonné fautif en proposant un coût forfaitaire de la reconnexion&nbsp;: par exemple, 10&nbsp;000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.</font>
+
<font size="2">De plus, la SBEE peut décider de mesures dissuasives de branchement illicites. Ainsi, en cas de branchement additionnel non autorisé sur un client existant, la SBEE peut déconnecter l’abonné fautif en proposant un coût forfaitaire de la reconnexion : par exemple, 10 000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.</font>
  
 
|}
 
|}
  
 +
<br/>
  
 +
== Procédure pour l’option 2 : « Réseau Secondaire en Régie » ==
  
== Procédure pour l’option 2&nbsp;: «&nbsp;Réseau Secondaire en Régie&nbsp;» ==
+
<font size="2">Dans ce cas, le réseau secondaire nouvellement construit appartient à un autre opérateur que la SBEE : entreprise privé, commune, association, coopérative, etc. Cet opérateur assure la maintenance du réseau depuis le compteur de livraison de l’énergie par la SBEE jusqu’à ses abonnés locaux. La limite de responsabilité entre le réseau SBEE et le réseau « en Régie » est donc matérialisé par le compteur SBEE dédié à l’opérateur privé ou régie. Du point de vue de la SBEE, il n’y a qu’un seul client.</font>
 
 
<font size="2">Dans ce cas, le réseau secondaire nouvellement construit appartient à un autre opérateur que la SBEE&nbsp;: entreprise privé, commune, association, coopérative, etc. Cet opérateur assure la maintenance du réseau depuis le compteur de livraison de l’énergie par la SBEE jusqu’à ses abonnés locaux. La limite de responsabilité entre le réseau SBEE et le réseau «&nbsp;en Régie&nbsp;» est donc matérialisé par le compteur SBEE dédié à l’opérateur privé ou régie. Du point de vue de la SBEE, il n’y a qu’un seul client.</font>
 
  
 
<font size="2">En aval de ce compteur, l’opérateur gère aussi bien les aspects techniques que commerciaux. Il peut par exemple équiper chacun de ses usagers de sous-compteurs ou bien décider de tarifs forfaitaires en fonction de la puissance installée individuellement. Enfin, il peut décider ultérieurement des extensions ou des renforcements de cette ligne ou mini-réseau à condition de soumettre à la SBEE tout projet de modification du réseau secondaire.</font>
 
<font size="2">En aval de ce compteur, l’opérateur gère aussi bien les aspects techniques que commerciaux. Il peut par exemple équiper chacun de ses usagers de sous-compteurs ou bien décider de tarifs forfaitaires en fonction de la puissance installée individuellement. Enfin, il peut décider ultérieurement des extensions ou des renforcements de cette ligne ou mini-réseau à condition de soumettre à la SBEE tout projet de modification du réseau secondaire.</font>
Line 351: Line 352:
 
<font size="2">Cette approche pourrait s’inscrire dans la politique globale de décentralisation déjà initiée par l’état béninois avec l’assistance technique de la GTZ. La SBEE pourrait apporter son assistance technique aux communes qui joueraient le rôle d’opérateur électrique. La gestion des abonnés réalisée au niveau communale permettrait alors d’accélérer les procédures de branchement.</font>
 
<font size="2">Cette approche pourrait s’inscrire dans la politique globale de décentralisation déjà initiée par l’état béninois avec l’assistance technique de la GTZ. La SBEE pourrait apporter son assistance technique aux communes qui joueraient le rôle d’opérateur électrique. La gestion des abonnés réalisée au niveau communale permettrait alors d’accélérer les procédures de branchement.</font>
  
 +
<br/>
  
 +
<u><font size="2">La procédure proposée comporte 10 étapes :</font></u>
  
<u><font size="2">La procédure proposée comporte 10 étapes&nbsp;:</font></u>
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;1</font>
+
<font size="2">1</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Organisation de la population et contact d’un agent technique qualifié</font>
 
<font size="2">Organisation de la population et contact d’un agent technique qualifié</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;2</font>
+
<font size="2">2</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Plan de masse</font>
 
<font size="2">Plan de masse</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;3</font>
+
<font size="2">3</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Rendez-vous avec un agent SBEE pour étude ou validation</font>
 
<font size="2">Rendez-vous avec un agent SBEE pour étude ou validation</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;4</font>
+
<font size="2">4</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
<font size="2">Etude et validation de la faisabilité technico-économique&nbsp;</font>
+
<font size="2">Etude et validation de la faisabilité technico-économique</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;5</font>
+
<font size="2">5</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Etablissement d’un devis</font>
 
<font size="2">Etablissement d’un devis</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;6</font>
+
<font size="2">6</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Collecte de fonds</font>
 
<font size="2">Collecte de fonds</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;7</font>
+
<font size="2">7</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Travaux</font>
 
<font size="2">Travaux</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;8</font>
+
<font size="2">8</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Conformité</font>
 
<font size="2">Conformité</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
<font size="2">&nbsp;9</font>
+
<font size="2">9</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Raccordement du réseau secondaire au réseau primaire</font>
 
<font size="2">Raccordement du réseau secondaire au réseau primaire</font>
  
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
<font size="2">10</font>
 
<font size="2">10</font>
  
| valign="top" width="524" |  
+
| style="vertical-align: top; width: 524px" |  
 
<font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite</font>
 
<font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite</font>
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>'''Etapes'''<span></span>'''Description'''
  
<br/>'''&nbsp;&nbsp;&nbsp;&nbsp;Etapes'''<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; &nbsp; </span>'''Description'''
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">1</font>'''
 
'''<font size="2">1</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
 
'''<u><font size="2">Organisation de la population et contact d’un agent technique qualifié</font></u>'''
 
'''<u><font size="2">Organisation de la population et contact d’un agent technique qualifié</font></u>'''
  
 +
<br/>
  
 +
<span><font size="2">-</font><span></span></span><font size="2">de mettre en place un comité d’électrification.</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">de mettre en place un comité d’électrification.</font>
+
<span><font size="2">-</font><span></span></span><font size="2">de contacter un ''agent technique qualifié'' (par exemple, un électricien local), ou si possible, un opérateur électrique existant ou potentiel : entreprise, commune, etc.</font>
 
 
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">de contacter un ''agent technique qualifié'' (par exemple, un électricien local), ou si possible, un opérateur électrique existant ou potentiel&nbsp;: entreprise, commune, etc.</font>
 
  
 
<font size="2">Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place ce comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées '''en considérant les''' '''possibilités de regroupement sur une même ligne à construire'''.</font>
 
<font size="2">Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place ce comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées '''en considérant les''' '''possibilités de regroupement sur une même ligne à construire'''.</font>
  
'''&nbsp;'''
+
<br/>
  
<font size="2">En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut appuyer ce mouvement en détachant un de ses agents pour accompagner, informer et former les populations concernées, ses représentants ou un opérateur local. Ce travail est justifié par l’intérêt de la SBEE à voir augmenté le taux de raccordement. Il pourrait être financé sur&nbsp;:</font>
+
<font size="2">En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut appuyer ce mouvement en détachant un de ses agents pour accompagner, informer et former les populations concernées, ses représentants ou un opérateur local. Ce travail est justifié par l’intérêt de la SBEE à voir augmenté le taux de raccordement. Il pourrait être financé sur :</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">une partie du coût de branchement du réseau secondaire sur le réseau SBEE,</font>
+
<span><font size="2">-</font><span></span></span><font size="2">une partie du coût de branchement du réseau secondaire sur le réseau SBEE,</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">une partie de l’énergie vendue,</font>
+
<span><font size="2">-</font><span></span></span><font size="2">une partie de l’énergie vendue,</font>
  
<span><font size="2">-</font><span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</span></span><font size="2">ses fonds propres.</font>
+
<span><font size="2">-</font><span></span></span><font size="2">ses fonds propres.</font>
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">2</font>'''
 
'''<font size="2">2</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Plan de masse&nbsp;:</font></u>'''
+
'''<u><font size="2">Plan de masse :</font></u>'''
 
 
<font size="2">Avec les représentants de la population, l’agent technique ou l’opérateur électrique local (s’il existe) réalise un '''schéma sommaire''' sur lequel il reporte&nbsp;:</font>
 
  
 +
<font size="2">Avec les représentants de la population, l’agent technique ou l’opérateur électrique local (s’il existe) réalise un '''schéma sommaire''' sur lequel il reporte :</font>
 
#<font size="2">le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,</font>
 
#<font size="2">le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,</font>
 
#<font size="2">les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.</font>
 
#<font size="2">les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.</font>
  
<font size="2">Pour chaque regroupement à desservir à partir d’une ligne secondaire&nbsp;:</font>
+
<font size="2">Pour chaque regroupement à desservir à partir d’une ligne secondaire :</font>
 
 
 
#<font size="2">le nombre de ménages,</font>
 
#<font size="2">le nombre de ménages,</font>
 
#<font size="2">La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,</font>
 
#<font size="2">La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,</font>
Line 486: Line 485:
 
#<font size="2">la puissance d’équipement électrique que chaque ménage compte installer.</font>
 
#<font size="2">la puissance d’équipement électrique que chaque ménage compte installer.</font>
 
#<font size="2">La volonté et capacité des ménages à payer pour leur raccordement,</font>
 
#<font size="2">La volonté et capacité des ménages à payer pour leur raccordement,</font>
#<font size="2">Les potentiels d’éventuels futurs raccordements&nbsp;: potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.</font>
+
#<font size="2">Les potentiels d’éventuels futurs raccordements : potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.</font>
  
 
<font size="2">Si l’agent technique ou l’opérateur électrique possède les outils suffisants de calculs de réseau, celui-ci peut déjà réaliser l’étude de faisabilité technico-économique du réseau secondaire. Dans le cas contraire (le plus souvent), cette étude sommaire sera effectuée par un agent local de la SBEE à l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ.</font>
 
<font size="2">Si l’agent technique ou l’opérateur électrique possède les outils suffisants de calculs de réseau, celui-ci peut déjà réaliser l’étude de faisabilité technico-économique du réseau secondaire. Dans le cas contraire (le plus souvent), cette étude sommaire sera effectuée par un agent local de la SBEE à l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ.</font>
Line 492: Line 491:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">3</font>'''
 
'''<font size="2">3</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Rendez-vous avec un agent SBEE pour étude ou validation&nbsp;:</font></u>'''
+
'''<u><font size="2">Rendez-vous avec un agent SBEE pour étude ou validation :</font></u>'''
  
 
<font size="2">Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent technique ou l’opérateur et si possible un agent communal '''prennent rendez-vous avec un agent SBEE '''dans le but d’effectuer l’étude sommaire de faisabilité technico-économique et de valider la fiabilité de la future ligne secondaire.</font>
 
<font size="2">Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent technique ou l’opérateur et si possible un agent communal '''prennent rendez-vous avec un agent SBEE '''dans le but d’effectuer l’étude sommaire de faisabilité technico-économique et de valider la fiabilité de la future ligne secondaire.</font>
Line 510: Line 509:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">4</font>'''
 
'''<font size="2">4</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Etude et validation de la faisabilité technico-économique&nbsp;:</font></u>'''
+
'''<u><font size="2">Etude et validation de la faisabilité technico-économique :</font></u>'''
  
 
<font size="2">A l’aide de l’outil d’aide à la décision ci-joint, '''l’agent SBEE évalue la faisabilité technique et économique des raccordements'''. L’agent SBEE remet une fiche pré-imprimée de spécifications techniques à l’agent technique qualifié ou à l’opérateur en charge des travaux.</font>
 
<font size="2">A l’aide de l’outil d’aide à la décision ci-joint, '''l’agent SBEE évalue la faisabilité technique et économique des raccordements'''. L’agent SBEE remet une fiche pré-imprimée de spécifications techniques à l’agent technique qualifié ou à l’opérateur en charge des travaux.</font>
  
<font size="2">Dans le cadre de programmes spécifiques d’accompagnement, type «&nbsp;projet DGIS&nbsp;», ou «&nbsp;programme ''<span>Facilité Energie&nbsp;»</span>'', l’électricien ou l’opérateur local pourraient bénéficier de formations sur le respect des spécifications techniques.</font>
+
<font size="2">Dans le cadre de programmes spécifiques d’accompagnement, type « projet DGIS », ou « programme ''<span>Facilité Energie »</span>'', l’électricien ou l’opérateur local pourraient bénéficier de formations sur le respect des spécifications techniques.</font>
 
 
<font size="2">Cette fiche pré-imprimée présentée en annexe, récapitule&nbsp;:</font>
 
  
 +
<font size="2">Cette fiche pré-imprimée présentée en annexe, récapitule :</font>
 
#<font size="2">Le point de raccordement sur le réseau primaire,</font>
 
#<font size="2">Le point de raccordement sur le réseau primaire,</font>
 
#<font size="2">Le nombre de ménages à raccorder,</font>
 
#<font size="2">Le nombre de ménages à raccorder,</font>
Line 536: Line 534:
 
#<font size="2">Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)</font>
 
#<font size="2">Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)</font>
 
#<font size="2">Le coût estimatif de la ligne</font>
 
#<font size="2">Le coût estimatif de la ligne</font>
#<font size="2">Le type de poteaux&nbsp;: poteau bois + poteau béton d’effort</font>
+
#<font size="2">Le type de poteaux : poteau bois + poteau béton d’effort</font>
 
#<font size="2">Le matériel annexe (encrage, suspension, etc.).</font>
 
#<font size="2">Le matériel annexe (encrage, suspension, etc.).</font>
  
<font size="2">L’agent SBEE avertit que si le réseau secondaire n’est pas conforme, celui-ci pourra être déconnecté du réseau SBEE. Il propose en même temps un montant forfaitaire de reconnexion&nbsp;: par exemple, 10&nbsp;000 FCFA. Cet avertissement figure également sur la fiche pré-imprimée.</font>
+
<font size="2">L’agent SBEE avertit que si le réseau secondaire n’est pas conforme, celui-ci pourra être déconnecté du réseau SBEE. Il propose en même temps un montant forfaitaire de reconnexion : par exemple, 10 000 FCFA. Cet avertissement figure également sur la fiche pré-imprimée.</font>
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">5</font>'''
 
'''<font size="2">5</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Etablissement d’un devis&nbsp;:</font></u>'''
+
'''<u><font size="2">Etablissement d’un devis :</font></u>'''
  
 
<font size="2">L’agent technique ou l’opérateur local '''proposent''' '''un devis en conformité avec les spécifications établies sur la fiche'''.</font>
 
<font size="2">L’agent technique ou l’opérateur local '''proposent''' '''un devis en conformité avec les spécifications établies sur la fiche'''.</font>
Line 561: Line 559:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">6</font>'''
 
'''<font size="2">6</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Collecte de fonds&nbsp;:</font></u>'''
+
'''<u><font size="2">Collecte de fonds :</font></u>'''
  
 
<font size="2">'''La population s’organise pour collecter les fonds '''nécessaires aux travaux. Comme proposé en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité '''forme''' les futurs usagers à l’utilisation rationnelle de l’énergie.</font>
 
<font size="2">'''La population s’organise pour collecter les fonds '''nécessaires aux travaux. Comme proposé en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité '''forme''' les futurs usagers à l’utilisation rationnelle de l’énergie.</font>
Line 579: Line 577:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">7</font>'''
 
'''<font size="2">7</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Travaux&nbsp;:</font></u>'''
+
'''<u><font size="2">Travaux :</font></u>'''
  
 
<font size="2">Après accord avec l’agent technique en charge des travaux (électricien ou opérateur) et versement des frais de raccordement par les bénéficiaires, l’agent technique '''effectue les''' '''travaux de ligne secondaire''' en conformité avec les spécifications techniques.</font>
 
<font size="2">Après accord avec l’agent technique en charge des travaux (électricien ou opérateur) et versement des frais de raccordement par les bénéficiaires, l’agent technique '''effectue les''' '''travaux de ligne secondaire''' en conformité avec les spécifications techniques.</font>
Line 597: Line 595:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">8</font>'''
 
'''<font size="2">8</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Conformité&nbsp;:</font></u>'''
+
'''<u><font size="2">Conformité :</font></u>'''
  
 
<font size="2">Une fois les travaux réalisés, l’agent technique (électricien ou opérateur) contacte l’agent SBEE pour '''vérification de la conformité technique des installations'''.</font>
 
<font size="2">Une fois les travaux réalisés, l’agent technique (électricien ou opérateur) contacte l’agent SBEE pour '''vérification de la conformité technique des installations'''.</font>
Line 617: Line 615:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">9</font>'''
 
'''<font size="2">9</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Raccordement du réseau secondaire au réseau primaire&nbsp;:</font></u>'''
+
'''<u><font size="2">Raccordement du réseau secondaire au réseau primaire :</font></u>'''
  
 
<font size="2">Une fois l’installation conforme, la SBEE pose le compteur unique (et si besoin, un poste MT/BT) correspondant à la nouvelle ligne secondaire. Puis elle effectue le '''raccordement effectif du réseau secondaire au réseau primaire''' '''SBEE''' BT ou MT.</font>
 
<font size="2">Une fois l’installation conforme, la SBEE pose le compteur unique (et si besoin, un poste MT/BT) correspondant à la nouvelle ligne secondaire. Puis elle effectue le '''raccordement effectif du réseau secondaire au réseau primaire''' '''SBEE''' BT ou MT.</font>
  
'''&nbsp;'''
+
<br/>
  
 
<font size="2">Avant d’être raccordés, tout futur abonné concerné par cette ligne secondaire devra rembourser aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût de construction de la ligne.</font>
 
<font size="2">Avant d’être raccordés, tout futur abonné concerné par cette ligne secondaire devra rembourser aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût de construction de la ligne.</font>
Line 641: Line 639:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
<br/>
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
 
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="36" |  
+
| style="vertical-align: top; width: 36px" |  
 
'''<font size="2">10</font>'''
 
'''<font size="2">10</font>'''
  
| valign="top" width="584" |  
+
| style="vertical-align: top; width: 584px" |  
'''<u><font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite&nbsp;:</font></u>'''
+
'''<u><font size="2">Contrôles réguliers et gestion des futurs raccordements sur la ligne construite :</font></u>'''
  
 
<font size="2">Un agent SBEE a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.</font>
 
<font size="2">Un agent SBEE a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.</font>
Line 659: Line 657:
 
<font size="2">En tant que gestionnaire de la ligne secondaire, l’opérateur local peut décider ultérieurement des extensions ou des renforcements de cette ligne ou de son mini-réseau. Dans ce cas, il devra soumettre à la SBEE tout projet de modification du réseau secondaire. A l’aide de l’outil de calcul ci-joint, l’agent SBEE pourra vérifier la conformité des projets de modificationn particulièrement dans le cas de modifications importantes. '''Ce sera notamment l’occasion pour la SBEE de vérifier l’état des réseaux gérés en régie.'''</font>
 
<font size="2">En tant que gestionnaire de la ligne secondaire, l’opérateur local peut décider ultérieurement des extensions ou des renforcements de cette ligne ou de son mini-réseau. Dans ce cas, il devra soumettre à la SBEE tout projet de modification du réseau secondaire. A l’aide de l’outil de calcul ci-joint, l’agent SBEE pourra vérifier la conformité des projets de modificationn particulièrement dans le cas de modifications importantes. '''Ce sera notamment l’occasion pour la SBEE de vérifier l’état des réseaux gérés en régie.'''</font>
  
<font size="2">La SBEE pourra décider de mesures dissuasives&nbsp;: un réseau non conforme pourra être déconnecté du réseau SBEE, avec un coût forfaitaire de reconnexion&nbsp;: par exemple, 10&nbsp;000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.</font>
+
<font size="2">La SBEE pourra décider de mesures dissuasives : un réseau non conforme pourra être déconnecté du réseau SBEE, avec un coût forfaitaire de reconnexion : par exemple, 10 000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.</font>
  
 
<font size="2">Ainsi, l’opérateur local sera incité à considérer préalablement la faisabilité technique des nouvelles demandes de branchement. Il pourra lutter également contre les branchements illicites sur son mini-réseau. En cas de branchement additionnel non autorisé sur un de ses clients existants, l’opérateur pourra déconnecter l’abonné fautif en proposant un coût forfaitaire de reconnexion.</font>
 
<font size="2">Ainsi, l’opérateur local sera incité à considérer préalablement la faisabilité technique des nouvelles demandes de branchement. Il pourra lutter également contre les branchements illicites sur son mini-réseau. En cas de branchement additionnel non autorisé sur un de ses clients existants, l’opérateur pourra déconnecter l’abonné fautif en proposant un coût forfaitaire de reconnexion.</font>
Line 667: Line 665:
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>
  
 +
== Annexe - Fiche de spécifications type<br/> ==
  
 
+
{| cellspacing="0" cellpadding="0" border="1"
== Annexe&nbsp;- Fiche de spécifications type&nbsp;<br/> ==
 
 
 
{| cellpadding="0" cellspacing="0" border="1"
 
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
1
 
1
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Point de raccordement sur le réseau primaire
 
Point de raccordement sur le réseau primaire
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
Faire un schéma. Reporter les références du poteau où s’effectuera le raccordement.
 
Faire un schéma. Reporter les références du poteau où s’effectuera le raccordement.
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
2
 
2
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
nombre de ménages à raccorder
 
nombre de ménages à raccorder
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
………………..…. ménages
 
………………..…. ménages
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
3
 
3
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
puissance maximale à installer par ménage
 
puissance maximale à installer par ménage
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………..…….. Watts
 
……………..…….. Watts
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
4
 
4
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
longueur du réseau secondaire correspondant
 
longueur du réseau secondaire correspondant
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………..…….. mètres
 
……………..…….. mètres
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
5
 
5
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
type de réseau
 
type de réseau
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
Cocher la case&nbsp;:
+
Cocher la case :
  
2x16 mm² Alu<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>□
+
2x16 mm² Alu<span></span>□
  
4x16 mm² Alu <span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>□
+
4x16 mm² Alu <span></span>□
  
[3x35+2x16+1x54,6] mm² Alu<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span>□
+
[3x35+2x16+1x54,6] mm² Alu<span></span>□
  
 
Avec gaine d’isolation en PR (Polyéthylène réticulé)
 
Avec gaine d’isolation en PR (Polyéthylène réticulé)
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
6
 
6
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
coût estimatif de la ligne
 
coût estimatif de la ligne
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………………..….. FCFA
 
……………………..….. FCFA
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
7
 
7
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
type de poteaux&nbsp;
+
type de poteaux
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
Portée maximale&nbsp;: …..45…. mètres
+
Portée maximale : …..45…. mètres
  
Poteaux bois&nbsp;:
+
Poteaux bois :
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Nombre&nbsp;: ……………………..
+
<span>·<span></span></span>Nombre : ……………………..
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Type de bois&nbsp;: …………………………
+
<span>·<span></span></span>Type de bois : …………………………
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Traitement du bois&nbsp;: ………………………..
+
<span>·<span></span></span>Traitement du bois : ………………………..
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Diamètre minimal à 1,8 m de la base&nbsp;:
+
<span>·<span></span></span>Diamètre minimal à 1,8 m de la base :
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 170 mm</span>
+
□<span>170 mm</span>
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Diamètre au sommet&nbsp;: 115 mm ou autre&nbsp;: …..…mm
+
<span>·<span></span></span>Diamètre au sommet : 115 mm ou autre : …..…mm
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 115 mm</span>
+
□<span>115 mm</span>
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Hauteur&nbsp;:
+
<span>·<span></span></span>Hauteur :
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 9 m</span>
+
□<span>9 m</span>
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
Poteaux d’arrêt en béton armé&nbsp;:
+
Poteaux d’arrêt en béton armé :
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Nombre&nbsp;: ………………..
+
<span>·<span></span></span>Nombre : ………………..
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Classe A ou C&nbsp;? …………………………
+
<span>·<span></span></span>Classe A ou C ? …………………………
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Type (ex&nbsp;: 9-650)&nbsp;: ……………………
+
<span>·<span></span></span>Type (ex : 9-650) : ……………………
  
Poteaux d’angle&nbsp;:
+
Poteaux d’angle :
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Nombre&nbsp;: ………………..
+
<span>·<span></span></span>Nombre : ………………..
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Classe A ou C&nbsp;? …………………………
+
<span>·<span></span></span>Classe A ou C ? …………………………
  
<span>·<span>&nbsp;&nbsp;&nbsp;</span></span>Type&nbsp;: ……………………
+
<span>·<span></span></span>Type : ……………………
  
&nbsp;
+
<br/>
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
8
 
8
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Suspensions câble au poteau
 
Suspensions câble au poteau
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
Type&nbsp;:
+
Type :
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ES 54-14 </span>(normalement pour câble 3x35 mm²)
+
□<span>ES 54-14 </span>(normalement pour câble 3x35 mm²)
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ………………………………………………….</span>
+
<span>………………………………………………….</span>
  
Nombre&nbsp;: …………………………………….
+
Nombre : …………………………………….
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
9
 
9
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Pinces d’ancrage bout de ligne
 
Pinces d’ancrage bout de ligne
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
Type&nbsp;:
+
Type :
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; PA 25 </span>(pour câble 2x16 mm² ou 4x16 mm²)
+
□<span>PA 25 </span>(pour câble 2x16 mm² ou 4x16 mm²)
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; PA 1500 </span>(pour câble 3x35 mm²)
+
□<span>PA 1500 </span>(pour câble 3x35 mm²)
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ………………………………………………….</span>
+
<span>………………………………………………….</span>
  
Nombre&nbsp;: …………………………………….
+
Nombre : …………………………………….
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
10
 
10
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Pinces d’ancrage angles
 
Pinces d’ancrage angles
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
Type&nbsp;:
+
Type :
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; EAS 54-10 </span>(normalement pour câble 3x35 mm²)
+
□<span>EAS 54-10 </span>(normalement pour câble 3x35 mm²)
  
□<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; autre </span><font size="2">(à décrire)&nbsp;: ……………………………..</font>
+
□<span>autre </span><font size="2">(à décrire) : ……………………………..</font>
  
<span>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; ………………………………………………….</span>
+
<span>………………………………………………….</span>
  
Nombre&nbsp;: …………………………………….
+
Nombre : …………………………………….
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
11
 
11
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Autre matériel
 
Autre matériel
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………………………………………………
 
……………………………………………………
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
12
 
12
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Autre matériel
 
Autre matériel
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………………………………………………
 
……………………………………………………
  
 
|-
 
|-
| valign="top" width="31" |  
+
| style="vertical-align: top; width: 31px" |  
 
13
 
13
  
| valign="top" width="208" |  
+
| style="vertical-align: top; width: 208px" |  
 
Autre matériel
 
Autre matériel
  
| valign="top" width="380" |  
+
| style="vertical-align: top; width: 380px" |  
 
……………………………………………………
 
……………………………………………………
  
 
|}
 
|}
  
 +
<br/>
  
 +
<br/>''Avertissement dans le cas de l’option 1 : Réseau Secondaire Allégé SBEE''
  
<br/>''Avertissement dans le cas de l’option 1&nbsp;: Réseau Secondaire Allégé SBEE''
+
'''''<font size="2">Tout branchement additionnel devra être soumis à autorisation de la SBEE afin de vérifier préalablement la capacité du réseau. Attention ! En cas de branchements additionnels sans autorisation et validation de la SBEE, la SBEE déconnectera l’abonné fautif. Coût de la reconnexion :</font>'''''<b>''10 000 <font size="2">FCFA</font>''</b>
  
'''''<font size="2">Tout branchement additionnel devra être soumis à autorisation de la SBEE afin de vérifier préalablement la capacité du réseau. Attention&nbsp;! En cas de branchements additionnels sans autorisation et validation de la SBEE, la SBEE déconnectera l’abonné fautif. Coût de la reconnexion&nbsp;:</font>'''''<b>''10&nbsp;000 <font size="2">FCFA</font>''</b>
+
<br/>
  
&nbsp;
+
----
  
----
+
''Avertissement dans le cas de l’option 2 : Réseau Secondaire en Régie''
  
''Avertissement dans le cas de l’option 2&nbsp;: Réseau Secondaire en Régie''
+
'''''<font size="2">Attention ! Si le réseau secondaire n’est pas conforme aux spécifications techniques remises par l’agent SBEE, celui-ci pourra être déconnecté du réseau SBEE. Coût de la reconnexion : 10 000 FCFA</font>'''''
  
'''''<font size="2">Attention&nbsp;! Si le réseau secondaire n’est pas conforme aux spécifications techniques remises par l’agent SBEE, celui-ci pourra être déconnecté du réseau SBEE. Coût de la reconnexion&nbsp;: 10&nbsp;000 FCFA</font>'''''
+
<br/>
  
 +
= Further Information =
  
 +
*[[Benin Energy Situation|Benin Energy Situation]]<br/>
 +
*[[Rural Electrification|Rural Electrification]]<br/>
  
 
= References<br/> =
 
= References<br/> =
  
<references />
+
<references /><br/>
  
 
[[Category:Grid]]
 
[[Category:Grid]]
 +
[[Category:Benin]]
 +
[[Category:Rural_Electrification]]
 
[[Category:French]]
 
[[Category:French]]

Latest revision as of 14:03, 9 September 2016

Overview

The paper is about the importance of organized rural Electrification, cause otherwise it will be done illegal. Behind every customer are 1,3 illegal connected consumers.


There are 2 Options to run the grid:

  1. SBEE runs the grid and arranges all 10 steps to connect customers to the grid
  2. A independent grid operator runs the Grid and deals with the customers, the independent grid operator gets the energy for his grid from SBEE and also arranges all 10 steps to connect the customers to the grid



Further Information



Méthode de traitement de demande de branchements secondaires

L’objectif de la méthode décrite ci-dessous est de permettre aux populations rurales de se raccorder à un coût soutenable, c'est-à-dire en rapport avec leurs moyens, tout en évitant l’anarchie et l’insécurité propres aux « toiles d’araignée ». Ce phénomène ne peut en effet plus être ignoré. Une enquête effectuée dans le village de Copargo (Atacora) a montré que derrière chaque abonné recensé, se cache 1,3 abonné non déclaré. Tandis qu’à Perma (Atacora), il a été relevé une longueur moyenne des lignes « sauvages » de 200 mètres, celles-ci pouvant atteindre 500 mètres.


La méthode proposée laisse les décideurs de la SBEE ou les acteurs régionaux choisir entre 2 options :

  1. Un « Réseau Secondaire Allégé » opéré par la SBEE. Ce réseau secondaire qui répond à un certain nombre de normes techniques, fera donc partie du patrimoine de la SBEE. Il pourra ultérieurement, en fonction des besoins, être renforcé ou bien étendu.
  2. Un « Réseau Secondaire en Régie », toléré par la SBEE et opéré par un autre opérateur que la SBEE : entreprise privé, commune, association, coopérative, etc. Pour être connecté au réseau primaire par la SBEE, ce réseau doit satisfaire à un certain nombre de normes techniques.

Dans les 2 cas, on ne parle plus de « toile d’araignée » mais de réseau secondaire puisque celui-ci est construit selon des exigences techniques acceptables aussi bien pour les populations que pour la SBEE : la qualité de tension et la solidité des lignes sont assurées.

En même temps, il ne faut pas perdre de vue la logique de performance sociale et financière du réseau par l’optimisation de son taux de couverture, donc en encourageant le raccordement à moindre coût de nouveaux abonnés.


Procédure pour l’option 1 : « Réseau Secondaire Allégé »

Dans ce cas, le réseau secondaire nouvellement construit appartient à la SBEE qui en assure l’entretien. La SBEE peut décider ultérieurement des extensions ou des renforcements. La responsabilité de la SBEE s’arrête au compteur de l’abonné, comme dans une configuration classique.


La procédure proposée comporte 10 étapes :

1

Organisation de la population et contact d’un agent SBEE

2

Plan de masse

3

Rendez-vous avec l’agent SBEE pour étude

4

Etude de la faisabilité technico-économique de la ligne secondaire

5

Etablissement d’un devis

6

Collecte de fonds

7

Travaux

8

Conformité

9

Raccordement du réseau secondaire au réseau primaire

10

Contrôles réguliers et gestion des futurs raccordements sur la ligne construite


Description:

1

Organisation de la population et contact d’un agent SBEE :

La population qui souhaite se raccorder, s’organise afin de contacter un agent de la SBEE au niveau de la direction régionale ou d’une agence SBEE locale.

Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place un comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées en considérant les possibilités de regroupement sur une même ligne à construire.

En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut détacher un de ses agents pour accompagner, informer et former les populations concernées ou ses représentants. Ce travail est justifié par l’intérêt de la SBEE à augmenter le taux de raccordement. Il pourrait être financé sur :

-une partie des coûts de branchement,

-une partie de l’énergie vendue, intégrée par exemple dans le prix de la carte à prépaiement ,

-ses fonds propres.

La SBEE a également la possibilité de déléguer ce travail d’animation auprès des services techniques des communes en les ayant préalablement formés.



2

Plan de masse :

L’agent SBEE ou un représentant de la population réalise un schéma sommaire sur lequel il reporte :

1.le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,

2.les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.

Pour chaque regroupement à desservir à partir d’une ligne secondaire :

3.le nombre de ménages,

4.La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,

5.la longueur de réseau nécessaire à construire,

6.la puissance d’équipement électrique que chaque ménage compte installer.

7.La volonté et capacité des ménages à payer pour leur raccordement,

8.Les potentiels d’éventuels futurs raccordements : potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.



3

Rendez-vous avec l’agent SBEE pour étude :

Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent SBEE et si possible un agent communal conviennent d’un rendez-vous.



4

Etude de la faisabilité technico-économique :

A l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ, l’agent SBEE évalue la faisabilité technique et économique des raccordements. Ce dernier remet une fiche pré-imprimée de spécifications techniques qui seront à respecter par l’électricien (local ou SBEE) en charge des travaux.

Dans le cadre de programmes spécifiques d’accompagnement, type « projet DGIS », ou « programme Facilité Energie », les électriciens locaux pourraient bénéficier de formations sur le respect des spécifications techniques.

Cette fiche présentée en annexe, récapitule :

  1. Le point de raccordement sur le réseau primaire,
  2. Le nombre de ménages à raccorder,
  3. La puissance maximale à installer par ménage.
  4. La longueur du réseau secondaire correspondant
  5. Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)
  6. Le coût estimatif de la ligne
  7. Le type de poteaux : poteau bois + poteau béton d’effort
  8. Le matériel annexe (encrage, suspension, etc.).

Dans le but de maintenir dans le temps la qualité de la ligne, cette fiche comprend un avertissement en cas de raccordements additionnels de ménages.



5

Etablissement d’un devis :

L’électricien local et/ou l’agent SBEE propose un devis sur la base des spécifications établies sur la fiche<span />. Ainsi, les futurs clients ont le choix du constructeur du réseau secondaire pour bénéficier de tarifs compétitifs. En effet si les tarifs ne sont pas compétitifs, l’usager sera de nouveau tenté par les « toiles d’araignée ». Dans tous les cas, la SBEE devra in fine approuver la conformité du réseau secondaire avant de l’intégrer dans son patrimoine.



6

Collecte de fonds :

La population s’organise pour collecter les fonds nécessaires aux travaux. Comme suggéré en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité forme les futurs usagers à l’utilisation rationnelle de l’énergie.



7

Travaux :

Après accord avec l’électricien en charge des travaux (local ou SBEE) et versement des frais de raccordement par les bénéficiaires, l’électricien effectue les travaux de ligne secondaire en respectant les spécifications techniques.



8

Conformité :

Une fois les travaux réalisés, l’électricien contacte l’agent SBEE pour vérification de la conformité technique des installations, ceci dans le cas où les travaux n’ont pas été réalisés par la SBEE.

En cas de non-conformité, l’agent SBEE dresse une liste de mesures correctives.



9

Raccordement du réseau secondaire au réseau primaire :

Une fois l’installation conforme, la SBEE effectue le raccordement effectif du réseau secondaire au réseau primaire BT.

Avant d’être raccordés, tout futur abonné concerné par cette ligne secondaire devra rembourser aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût de construction de la ligne.

Puis, la SBEE pose les compteurs pour lesquels elle a perçu les frais de branchement.



10

Contrôles réguliers et gestion des futurs raccordements sur la ligne construite :

Un agent SBEE avec l’appui des représentants des clients (par exemple, le comité d’électrification) a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.

Toute nouvelle demande de branchement même sur un réseau secondaire existant devra faire l’objet d’un bilan technique sommaire de la ligne électrique en utilisant l’outil d’aide à la décision ci-joint. Ce sera notamment l’occasion de vérifier que les spécifications initialement remises sont toujours respectées, et plus particulièrement que des branchements non autorisés n’aient pas eu lieu entre-temps.


Avant branchement, les nouveaux ménages à raccorder remboursent aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût total de la ligne secondaire. De cette façon, les initiateurs de la ligne ont intérêt à ce que les nouveaux abonnés se branchent selon la procédure normalisée pour bénéficier du remboursement de la quote-part des travaux.

De plus, la SBEE peut décider de mesures dissuasives de branchement illicites. Ainsi, en cas de branchement additionnel non autorisé sur un client existant, la SBEE peut déconnecter l’abonné fautif en proposant un coût forfaitaire de la reconnexion : par exemple, 10 000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.


Procédure pour l’option 2 : « Réseau Secondaire en Régie »

Dans ce cas, le réseau secondaire nouvellement construit appartient à un autre opérateur que la SBEE : entreprise privé, commune, association, coopérative, etc. Cet opérateur assure la maintenance du réseau depuis le compteur de livraison de l’énergie par la SBEE jusqu’à ses abonnés locaux. La limite de responsabilité entre le réseau SBEE et le réseau « en Régie » est donc matérialisé par le compteur SBEE dédié à l’opérateur privé ou régie. Du point de vue de la SBEE, il n’y a qu’un seul client.

En aval de ce compteur, l’opérateur gère aussi bien les aspects techniques que commerciaux. Il peut par exemple équiper chacun de ses usagers de sous-compteurs ou bien décider de tarifs forfaitaires en fonction de la puissance installée individuellement. Enfin, il peut décider ultérieurement des extensions ou des renforcements de cette ligne ou mini-réseau à condition de soumettre à la SBEE tout projet de modification du réseau secondaire.

Cette approche pourrait s’inscrire dans la politique globale de décentralisation déjà initiée par l’état béninois avec l’assistance technique de la GTZ. La SBEE pourrait apporter son assistance technique aux communes qui joueraient le rôle d’opérateur électrique. La gestion des abonnés réalisée au niveau communale permettrait alors d’accélérer les procédures de branchement.


La procédure proposée comporte 10 étapes :

1

Organisation de la population et contact d’un agent technique qualifié

2

Plan de masse

3

Rendez-vous avec un agent SBEE pour étude ou validation

4

Etude et validation de la faisabilité technico-économique

5

Etablissement d’un devis

6

Collecte de fonds

7

Travaux

8

Conformité

9

Raccordement du réseau secondaire au réseau primaire

10

Contrôles réguliers et gestion des futurs raccordements sur la ligne construite



EtapesDescription

1

Organisation de la population et contact d’un agent technique qualifié


-de mettre en place un comité d’électrification.

-de contacter un agent technique qualifié (par exemple, un électricien local), ou si possible, un opérateur électrique existant ou potentiel : entreprise, commune, etc.

Cette population peut éventuellement s’appuyer sur un agent communautaire, un électricien local, un employé communal, une ONG ou autre pour mettre en place ce comité d’électrification et former ses membres sur les modalités de raccordement et d’organisation interne. En effet, les demandes de raccordement peuvent être organisées en considérant les possibilités de regroupement sur une même ligne à construire.


En fonction de ses moyens et de sa politique au niveau régional, la SBEE peut appuyer ce mouvement en détachant un de ses agents pour accompagner, informer et former les populations concernées, ses représentants ou un opérateur local. Ce travail est justifié par l’intérêt de la SBEE à voir augmenté le taux de raccordement. Il pourrait être financé sur :

-une partie du coût de branchement du réseau secondaire sur le réseau SBEE,

-une partie de l’énergie vendue,

-ses fonds propres.




2

Plan de masse :

Avec les représentants de la population, l’agent technique ou l’opérateur électrique local (s’il existe) réalise un schéma sommaire sur lequel il reporte :

  1. le positionnement géographique des ménages qui souhaitent se raccorder par rapport à la ligne SBEE primaire,
  2. les regroupements possibles de ménages autour d’une ou plusieurs futures lignes secondaires à construire.

Pour chaque regroupement à desservir à partir d’une ligne secondaire :

  1. le nombre de ménages,
  2. La distance entre le poste de transfo MT/BT et le point de raccordement sur le réseau primaire BT,
  3. la longueur de réseau nécessaire à construire,
  4. la puissance d’équipement électrique que chaque ménage compte installer.
  5. La volonté et capacité des ménages à payer pour leur raccordement,
  6. Les potentiels d’éventuels futurs raccordements : potentiels techniques mais aussi motivation de la population environnante au groupe initial, nombre de ménages environnants.

Si l’agent technique ou l’opérateur électrique possède les outils suffisants de calculs de réseau, celui-ci peut déjà réaliser l’étude de faisabilité technico-économique du réseau secondaire. Dans le cas contraire (le plus souvent), cette étude sommaire sera effectuée par un agent local de la SBEE à l’aide de l’outil d’aide à la décision ci-joint conçu par la GTZ.




3

Rendez-vous avec un agent SBEE pour étude ou validation :

Les représentants des futurs bénéficiaires (par exemple, le comité d’électrification), l’agent technique ou l’opérateur et si possible un agent communal prennent rendez-vous avec un agent SBEE dans le but d’effectuer l’étude sommaire de faisabilité technico-économique et de valider la fiabilité de la future ligne secondaire.




4

Etude et validation de la faisabilité technico-économique :

A l’aide de l’outil d’aide à la décision ci-joint, l’agent SBEE évalue la faisabilité technique et économique des raccordements. L’agent SBEE remet une fiche pré-imprimée de spécifications techniques à l’agent technique qualifié ou à l’opérateur en charge des travaux.

Dans le cadre de programmes spécifiques d’accompagnement, type « projet DGIS », ou « programme Facilité Energie », l’électricien ou l’opérateur local pourraient bénéficier de formations sur le respect des spécifications techniques.

Cette fiche pré-imprimée présentée en annexe, récapitule :

  1. Le point de raccordement sur le réseau primaire,
  2. Le nombre de ménages à raccorder,
  3. La puissance maximale à installer par ménage.
  4. La longueur du réseau secondaire correspondant
  5. Le type de réseau (2x16 mm² Alu, 4x16 mm² Alu ou [3x35+2x16+1x54,6] mm² Alu)
  6. Le coût estimatif de la ligne
  7. Le type de poteaux : poteau bois + poteau béton d’effort
  8. Le matériel annexe (encrage, suspension, etc.).

L’agent SBEE avertit que si le réseau secondaire n’est pas conforme, celui-ci pourra être déconnecté du réseau SBEE. Il propose en même temps un montant forfaitaire de reconnexion : par exemple, 10 000 FCFA. Cet avertissement figure également sur la fiche pré-imprimée.




5

Etablissement d’un devis :

L’agent technique ou l’opérateur local proposent un devis en conformité avec les spécifications établies sur la fiche.




6

Collecte de fonds :

La population s’organise pour collecter les fonds nécessaires aux travaux. Comme proposé en étape 1, la mise en place d’un comité d’électrification avec désignation d’un trésorier peut être pertinent en cas de plusieurs raccordements sur une même ligne. Ce comité forme les futurs usagers à l’utilisation rationnelle de l’énergie.




7

Travaux :

Après accord avec l’agent technique en charge des travaux (électricien ou opérateur) et versement des frais de raccordement par les bénéficiaires, l’agent technique effectue les travaux de ligne secondaire en conformité avec les spécifications techniques.




8

Conformité :

Une fois les travaux réalisés, l’agent technique (électricien ou opérateur) contacte l’agent SBEE pour vérification de la conformité technique des installations.

En cas de non-conformité, l’agent SBEE dresse une liste de mesures correctives.




9

Raccordement du réseau secondaire au réseau primaire :

Une fois l’installation conforme, la SBEE pose le compteur unique (et si besoin, un poste MT/BT) correspondant à la nouvelle ligne secondaire. Puis elle effectue le raccordement effectif du réseau secondaire au réseau primaire SBEE BT ou MT.


Avant d’être raccordés, tout futur abonné concerné par cette ligne secondaire devra rembourser aux usagers déjà raccordés ou au comité d’électrification, la quote-part du coût de construction de la ligne.

L’opérateur local a la possibilité de poser des sous-compteurs (classiques ou à prépaiement) ou bien il peut décider de tarifs forfaitaires en fonction de la puissance installée individuellement.




10

Contrôles réguliers et gestion des futurs raccordements sur la ligne construite :

Un agent SBEE a la possibilité d’effectuer des contrôles réguliers pour vérifier la conformité des installations avec les spécifications techniques établies sur les fiches.

En tant que gestionnaire de la ligne secondaire, l’opérateur local peut décider ultérieurement des extensions ou des renforcements de cette ligne ou de son mini-réseau. Dans ce cas, il devra soumettre à la SBEE tout projet de modification du réseau secondaire. A l’aide de l’outil de calcul ci-joint, l’agent SBEE pourra vérifier la conformité des projets de modificationn particulièrement dans le cas de modifications importantes. Ce sera notamment l’occasion pour la SBEE de vérifier l’état des réseaux gérés en régie.

La SBEE pourra décider de mesures dissuasives : un réseau non conforme pourra être déconnecté du réseau SBEE, avec un coût forfaitaire de reconnexion : par exemple, 10 000 FCFA. Cet avertissement peut être inscrit dans les fiches techniques pré-imprimées.

Ainsi, l’opérateur local sera incité à considérer préalablement la faisabilité technique des nouvelles demandes de branchement. Il pourra lutter également contre les branchements illicites sur son mini-réseau. En cas de branchement additionnel non autorisé sur un de ses clients existants, l’opérateur pourra déconnecter l’abonné fautif en proposant un coût forfaitaire de reconnexion.

Avant branchement, les nouveaux ménages à raccorder remboursent aux usagers déjà raccordés ou à l’opérateur local, la quote-part du coût total de la ligne secondaire. De cette façon, les initiateurs de la ligne ont intérêt à ce que les nouveaux abonnés se branchent selon la procédure normalisée pour bénéficier du remboursement de la quote-part des travaux.



Annexe - Fiche de spécifications type

1

Point de raccordement sur le réseau primaire

Faire un schéma. Reporter les références du poteau où s’effectuera le raccordement.

2

nombre de ménages à raccorder

………………..…. ménages

3

puissance maximale à installer par ménage

……………..…….. Watts

4

longueur du réseau secondaire correspondant

……………..…….. mètres

5

type de réseau

Cocher la case :

2x16 mm² Alu

4x16 mm² Alu

[3x35+2x16+1x54,6] mm² Alu

Avec gaine d’isolation en PR (Polyéthylène réticulé)

6

coût estimatif de la ligne

……………………..….. FCFA

7

type de poteaux

Portée maximale : …..45…. mètres

Poteaux bois :

·Nombre : ……………………..

·Type de bois : …………………………

·Traitement du bois : ………………………..

·Diamètre minimal à 1,8 m de la base :

170 mm

autre (à décrire) : ……………………………..

·Diamètre au sommet : 115 mm ou autre : …..…mm

115 mm

autre (à décrire) : ……………………………..

·Hauteur :

9 m

autre (à décrire) : ……………………………..

Poteaux d’arrêt en béton armé :

·Nombre : ………………..

·Classe A ou C ? …………………………

·Type (ex : 9-650) : ……………………

Poteaux d’angle :

·Nombre : ………………..

·Classe A ou C ? …………………………

·Type : ……………………


8

Suspensions câble au poteau

Type :

ES 54-14 (normalement pour câble 3x35 mm²)

autre (à décrire) : ……………………………..

………………………………………………….

Nombre : …………………………………….

9

Pinces d’ancrage bout de ligne

Type :

PA 25 (pour câble 2x16 mm² ou 4x16 mm²)

PA 1500 (pour câble 3x35 mm²)

autre (à décrire) : ……………………………..

………………………………………………….

Nombre : …………………………………….

10

Pinces d’ancrage angles

Type :

EAS 54-10 (normalement pour câble 3x35 mm²)

autre (à décrire) : ……………………………..

………………………………………………….

Nombre : …………………………………….

11

Autre matériel

……………………………………………………

12

Autre matériel

……………………………………………………

13

Autre matériel

……………………………………………………



Avertissement dans le cas de l’option 1 : Réseau Secondaire Allégé SBEE

Tout branchement additionnel devra être soumis à autorisation de la SBEE afin de vérifier préalablement la capacité du réseau. Attention ! En cas de branchements additionnels sans autorisation et validation de la SBEE, la SBEE déconnectera l’abonné fautif. Coût de la reconnexion :10 000 FCFA



Avertissement dans le cas de l’option 2 : Réseau Secondaire en Régie

Attention ! Si le réseau secondaire n’est pas conforme aux spécifications techniques remises par l’agent SBEE, celui-ci pourra être déconnecté du réseau SBEE. Coût de la reconnexion : 10 000 FCFA