Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"
From energypedia
***** (***** | *****) m |
***** (***** | *****) |
(No difference)
|
Revision as of 12:49, 30 August 2012
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there. In particular the following aspects and passages have been specified to be in need for a revision: |
Results - Mata 2009
Results of the discussions during Mata 2009 about:
- Which tariffs and billing systems have been successful?
- Which challenges have been identified?
Country/Project/System | System applied successful | Challenges |
Indonesia / MHP /Micro Hydro Schemes |
|
|
Pakistan |
|
|
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|
Republic South Africa / SHS Pakistan / SHS |
| |
Senegal / SHS Burkina Faso / SHS |
|
|
Ghana / grid |
|
|
China / grid - households |
|
|
Rwanda / grid |
|
|
Zambia / grid |
|
|
Senegal / Minigrids |
|
|
Marocco / planned for island grid |
|
References