Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
(3 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
+ | |||
{{Revision|Überarbeitungshinweis: Überführen in Übersichtstabelle im zukünftigen Finance-Portal.}} | {{Revision|Überarbeitungshinweis: Überführen in Übersichtstabelle im zukünftigen Finance-Portal.}} | ||
− | = Results | + | = Overview<ref name="Results of the discussions during Mata 2009 (GIZ)">Results of the discussions during Mata 2009 (GIZ)</ref> = |
− | + | *Which tariffs and billing systems have been successful? | |
− | |||
− | *Which tariffs and billing systems have been successful? | ||
*Which challenges have been identified? | *Which challenges have been identified? | ||
+ | <br/> | ||
− | + | {| cellspacing="1" cellpadding="7" border="1" style="width: 100%" | |
− | {| | ||
|- | |- | ||
− | | | + | | style="width: 30%; background-color: rgb(204, 204, 204)" | '''Country / Project / System''' |
− | | | + | | style="width: 30%; background-color: rgb(204, 204, 204)" | '''System applied successful''' |
− | | '''Challenges''' | + | | style="width: 30%; background-color: rgb(204, 204, 204)" | '''Challenges''' |
|- | |- | ||
| <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u> | | <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u> | ||
| | | | ||
*'''Communal-set tariffs''' | *'''Communal-set tariffs''' | ||
− | |||
#'''Flat rate''' (households) | #'''Flat rate''' (households) | ||
#'''Item based''' (eg # of bulbs) | #'''Item based''' (eg # of bulbs) | ||
Line 41: | Line 39: | ||
| | | | ||
*Expected challenges: | *Expected challenges: | ||
− | |||
#billing - recovery rate too low | #billing - recovery rate too low | ||
#monitoring of applied devices | #monitoring of applied devices | ||
#Static system | #Static system | ||
− | |||
*risk: pilot --> not cost covering | *risk: pilot --> not cost covering | ||
Line 57: | Line 53: | ||
| | | | ||
*'''Fee for service with pre-paid metering''' | *'''Fee for service with pre-paid metering''' | ||
− | |||
#complete financial failure | #complete financial failure | ||
#conceptual design resulted in no ownership and caused vandalism, theft,... | #conceptual design resulted in no ownership and caused vandalism, theft,... | ||
Line 75: | Line 70: | ||
| | | | ||
*'''Multi-level tariff''' | *'''Multi-level tariff''' | ||
− | |||
#'''prepaid''' and '''post paid metered''' | #'''prepaid''' and '''post paid metered''' | ||
− | #[[Tariffs# | + | #[[Tariffs#Example_Ghana|lifeline tariff]] |
| | | | ||
Line 93: | Line 87: | ||
| | | | ||
*power production to low for overall demand | *power production to low for overall demand | ||
− | |||
#utility prefers to connect only big consumers | #utility prefers to connect only big consumers | ||
− | |||
*off grid tariff (MHP) lower than grid tariff | *off grid tariff (MHP) lower than grid tariff | ||
− | |||
#not cost covering | #not cost covering | ||
Line 104: | Line 95: | ||
| | | | ||
*recently change from '''flat rate''' to '''prepaid tariff''' | *recently change from '''flat rate''' to '''prepaid tariff''' | ||
− | |||
#resulted in lower electricity consumption | #resulted in lower electricity consumption | ||
Line 117: | Line 107: | ||
| | | | ||
*one tariff nationwide | *one tariff nationwide | ||
− | |||
#not cost covering under all conditions | #not cost covering under all conditions | ||
Line 128: | Line 117: | ||
|} | |} | ||
+ | <br/> | ||
+ | = Further Information<br/> = | ||
− | + | *[[Portal:Financing_and_Funding|Financing and Funding Portal on energypedia]] | |
+ | *[[Tariffs|Tariffs]] | ||
+ | *[[Metering_and_Billing_Systems|Metering and Billing Systems]] | ||
− | |||
+ | = References<br/> = | ||
+ | <references /> | ||
− | + | [[Category:Financing_and_Funding]] | |
− | [[ | + | [[Category:Zambia]] |
− | + | [[Category:South_Africa]] | |
− | [[ | + | [[Category:Senegal]] |
− | + | [[Category:Rwanda]] | |
+ | [[Category:Pakistan]] | ||
+ | [[Category:Morocco]] | ||
+ | [[Category:Indonesia]] | ||
+ | [[Category:Ghana]] | ||
+ | [[Category:Ethiopia]] | ||
+ | [[Category:China]] | ||
[[Category:Burkina_Faso]] | [[Category:Burkina_Faso]] | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 11:39, 6 October 2014
This article needs to be revised. Please rewrite the article according to the specifications below. Only remove this maintenance box after a thorough revision of this article. See the discussion page for more details or start a discussion there. In particular the following aspects and passages have been specified to be in need for a revision: |
Overview[1]
- Which tariffs and billing systems have been successful?
- Which challenges have been identified?
Country / Project / System | System applied successful | Challenges |
Indonesia / MHP /Micro Hydro Schemes |
|
|
Pakistan |
|
|
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|
Republic South Africa / SHS Pakistan / SHS |
| |
Senegal / SHS Burkina Faso / SHS |
|
|
Ghana / grid |
|
|
China / grid - households |
|
|
Rwanda / grid |
|
|
Zambia / grid |
|
|
Senegal / Minigrids |
|
|
Marocco / planned for island grid |
|
Further Information
References
- ↑ Results of the discussions during Mata 2009 (GIZ)