(Created page with "{{HPDB |HPDBCountry=Ethiopia |HPDBCity/Town=Oromiya |HPDBCoordinates=Latitude= 8.4684, Longitude= 39.1588 |HPDBDate of Commission=1960 |HPDBStream Name=Awash River |HPDBOperator=...")
 
***** (***** | *****)
m
 
Line 2: Line 2:
 
|HPDBCountry=Ethiopia
 
|HPDBCountry=Ethiopia
 
|HPDBCity/Town=Oromiya
 
|HPDBCity/Town=Oromiya
|HPDBCoordinates=Latitude= 8.4684, Longitude= 39.1588
+
|HPDBCoordinates=8.4684, 39.1588
 
|HPDBDate of Commission=1960
 
|HPDBDate of Commission=1960
 
|HPDBStream Name=Awash River
 
|HPDBStream Name=Awash River

Latest revision as of 08:08, 3 September 2012


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: Oromiya
Coordinates (Powerhouse): 8° 28' 6.24" N, 39° 9' 31.68" E
Year of Commission: 1960
Basin Name:
Stream Name: Awash River
Developer:
Operator: Ethiopian Electric and Power Company
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 43
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material:
Dam Height [m]: 47
Length of Dam [m]: 458
Storage Volume of Reservoir (m³): 1,900,000,000
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: