= Overview<br/> =
 
  
{| style="float: right" width="400" border="1" cellpadding="0" cellspacing="0"
+
{{CES Country
|-
+
|CES Country Name=Uganda
| colspan="4" align="center" | &nbsp; '''Republic of Uganda'''
+
|CES Country Capital=Kampala
|-
+
|CES Country Region Africa = Sub-Saharan Africa
| &nbsp; [[File:800px-Flag of Uganda.svg.png|border|center|150x100px|Flag of Algeria.png]]<br/>
+
|CES Country Coordinates=1.0667° N, 31.8833° E
| &nbsp; [[File:800px-LocationUganda.svg.png|center|196x98px|Location Algeria.png]]<br/>
+
}}
|-
 
|
 
Capital
 
 
 
|
 
<br/>Kampala ([http://toolserver.org/%7Egeohack/geohack.php?pagename=Kampala&params=00_18_49_N_32_34_52_E_type:city%281420200%29_region:UG 0° 18′ 49″ N, 32° 34′ 52″ E])
 
 
 
|-
 
|
 
Official language(s)
 
  
|
+
= Energy situation =
English
 
  
|-
+
Uganda has a total primary energy consumption of 0.0593 quadrillion Btu which equals 14.94 Mio. tons of oil equivalent (2012).<ref>U.S. Energy Information Admistration - http://www.eia.gov/countries/country-data.cfm?fips=UG#tpefckLR</ref> Biomass is still the most important source of energy for the majority of the Ugandan population. About 90% of the total primary energy consumption is generated through biomass, which can be separated in firewood (78.6%), charcoal (5.6%) and crop residues (4.7%). Electricity is contributing only 1.4% to the national energy balance while oil products, which are mainly used for vehicles and thermal power plants, account for the remaining 9.7%.<ref>Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19</ref> Concerning electricity generation, Uganda has an installed capacity of 822 MW, mostly consisting of hydropower (692 MW; 84%). Access to electricity in 2013 at national level in Uganda is very low with 15% (1991: 5.6%; 2006: 9%; 2010: 10%) but only 7% in rural areas. <ref>KfW</ref> Uganda currently has one of the lowest per capita electricity consumption in the world with 215 kWh per capita per year (Sub-Saharan Africa’s average: 552 kWh per capita, World average: 2,975 per capita).<ref>PWC - http://www.pwc.com/en_UG/ug/assets/pdf/uganda-budget-2013.pdf</ref> Uganda politically and economically reformed its energy sector including a new legal and regulatory framework based on which the previously vertically integrated monopoly, Uganda Electricity Board, was unbundled leading to public private partnerships. The Government provides an enabling environment for private sector investments in generation and distribution of electricity while transmission above 33kV remains a public function through the [http://www.uetcl.com/ Uganda Electricity Transmission Company Ltd (UETCL)]. The [http://www.era.or.ug/ Electricity Regulatory Authority (ERA)] was established to license and regulate operations of all electricity operators, and the [http://www.rea.or.ug/ Rural Electrification Agency (REA)] was put in place to ensure that rural electrification, which in most cases is not commercially viable, is accelerated to achieve set targets.<ref>SE4ALL</ref> The energy sector is one of the key sectors of the Ugandan economy. The sector provides a major contribution to the treasury resources from fuel taxes, VAT on electricity, levy on transmission bulk purchases of electricity, license fees and royalties and foreign exchange earnings from power exports. Significant public investment has injected into the sector, particularly in the area of electricity supply. Following liberalisation, the power sub-sector is now attracting the largest private sector investments in the country. The sector is not only a vital input into other sectors, but also major source of employment.
|
 
Government
 
  
|
+
== Energy demand ==
Democratic Republic
 
  
|-
+
Mainly resulting from a prominent GDP growth of around 6% during the past two decades (2010: 6.2%; 2011: 5.0%; 2012: 4.7%; 2013:6.5%)<ref>World Bank - http://data.worldbank.org/country/uganda</ref>, electricity demand has been growing at an average of 10% per annum.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 106</ref> In the past years this lead to occasional load shedding since the supply did not increase proportionally.<br/>The following table shows the energy and electricity demand of the main consuming sectors according to Uganda Energy Balance 2012 of the [http://www.energyandminerals.go.ug/ Ministry of Energy & Mineral Development (MEMD)].<ref>Ministry of Energy and Mineral Development, Energy Balance of Uganda 2012</ref><br/>
|
 
President
 
 
 
|
 
Yoweri Museveni
 
  
 +
{| style="width: 311px;  width: 683px" cellspacing="0" cellpadding="0" border="1" align="center"
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(204, 204, 204)" | <p style="text-align: center">'''Sector'''</p>
Prime Minister
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(204, 204, 204)" | <p style="text-align: center">'''Energy Demand'''</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(204, 204, 204)" | <p style="text-align: center">'''Electricity Demand'''</p>
| Amama Mbabazi<br/>
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">Residential</p>
Total area
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">67.09%</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">24.24%</p>
|  
 
236,040 km<sup>2</sup>
 
 
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">Commercial</p>
Population
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">13.35%</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">11.16%</p>
|  
 
32,369,558 (2009 estimate)
 
 
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">Industrial</p>
GDP (nominal)
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">11.86%</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">64.60%</p>
|  
 
$17.703 billion (2010 estimate)
 
 
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">Transport</p>
GDP Per capita
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">7.25%</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">0.00%</p>
|  
 
$514
 
 
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">Agriculture</p>
Currency
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">0,45%</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">0.00%</p>
|  
 
Ugandan shilling (UGX)
 
 
 
 
|-
 
|-
|  
+
| style="white-space: nowrap;  width: 252px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">'''Total'''</p>
Time zone
+
| style="white-space: nowrap;  width: 202px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">'''100%'''</p>
 
+
| style="white-space: nowrap;  width: 221px;  height: 10px;  background-color: rgb(255, 255, 255)" | <p style="text-align: center">'''100%'''</p>
|  
 
EAT (UTC+3)
 
 
 
|-
 
|  
 
Calling code
 
 
 
|  
 
+256
 
 
 
 
|}
 
|}
  
{| class="FCK__ShowTableBorders" width="350" align="left" border="0" cellpadding="1" cellspacing="1"
+
== Energy supply ==
|-
 
| __TOC__
 
  
|}
+
In 2012, Uganda had to import energy in the amount of 1,187,672 TOE (different petroleum products) while the amount of exports (only electricity) amounted to 8,514 TOE.<ref>Ministry of Energy and Mineral Development, Energy Balance of Uganda 2012</ref> Uganda’s main source of energy is biomass. Regarding electrical power generation, hydropower accounts for about 84% of the total installed capacity of 822 MW. The actual total electricity capacity is 550 MW and the country’s peak demand is about 489 MW. According to the NDP the peak power demand is rising about 22.7% per annum.<ref>Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19, page 84</ref> The following table shows Uganda‘s most important power stations.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19</ref>
<div style="clear: both"></div>
 
  
 
+
{| style="width: 604px" cellspacing="0" cellpadding="0" border="1" align="center"
= Energy Situation<br/> =
 
 
 
'''Overview'''
 
 
 
The energy sector is one of the key sectors in Uganda’s economy. The country has a total energy consumption of approximately 11 million TOE (tonnes of oil equivalent) (2010). This consumption is partially met by a number of energy resources including solar power, biomass and fossil fuels. Biomass is the most important source of energy for 97% of the population, providing for 90% of the total primary energy consumption, in form of firewood, charcoal or crop residues. This dependence on biomass is one of Africa’s highest. Electricity contributes only 1.1% to the national energy balance (121,000 TOE), while oil products (mainly used for vehicles and thermal power plants) account for the remaining 8.9%.
 
 
 
<br/>Concerning electricity generation, Uganda has an installed capacity of 595 MW, mostly consisting of hydropower. The electrification rate in Uganda is very low with 12% at national level (1991: 5.6%; 2006: 9%; 2010: 10%) but only 5% - 6% in rural areas. Uganda currently has one of the lowest per capita electricity consumption (70 kWh/year) in the world (Africa’s average: 578 kWh per capita, World average: 2,572 kWh per capita, Germany: 7,111 kWh per capita). About 72% of total electricity supplied by the main grid is consumed by 12% of the domestic population concentrated in the Kampala metropolitan area and nearby towns of Entebbe and Jinja [1]. Approximately 1% of rural households use off-grid electrification technologies (usually diesel generators or solar photovoltaic systems).
 
 
 
<br/>In 2004 Uganda reformed its energy sector both politically and economically to include a new legal and regulatory framework based on which the then vertically integrated monopoly, Uganda Electricity Board, was dismantled, making way for public -private partnerships. Since then, the government has provided an enabling environment for private sector investments in generation and distribution of electricity while transmission above 33kV remains a public function through the Uganda Electricity Transmission Company Ltd (UETCL). An Electricity Regulatory Authority (ERA) was established to license and regulate operations of all electricity operators, and a Rural Electrification Agency (REA) was put in place to ensure that rural electrification, which in most cases is not commercially viable, was accelerated to achieve set targets. (Source: SE4ALL)
 
 
 
<br/>The energy sector provides a major contribution to the treasury resources from fuel taxes, VAT on electricity, levy on transmission bulk purchases of electricity, license fees and royalties, as well as foreign exchange earnings from power exports.<br/>As a result, significant public investment has been injected into the sector, particularly in the area of electricity supply. Following liberalisation, the power sub-sector now attracts the largest private sector investments in the country. The sector is not only a vital input into other sectors, but also a major source of employment for Ugandans. As of 2007, total financial resources required to implement strategic interventions were about US$ 1.84 billion. It is estimated that 68% of these resources will come from direct private investment while 32% will be obtained from the public sector either through Government resources or from development partners. For the same period, the expected sector revenue is approximately US$ 2.3 billion.[3]
 
 
 
&nbsp;
 
 
 
'''Energy demand'''
 
 
 
Electricity demand has grown at an average of 10% per annum. This has mainly resulted from a significant GDP growth of over 6% during the past two decades. This increased demand for electricity has in the past years led to heavy load shedding since the supply hasn’t increased proportionally. The following table shows the energy and electricity demand of the main consuming sectors.
 
 
 
{| cellpadding="1" cellspacing="1" border="1" style="width: 500px;"
 
 
|-
 
|-
|  
+
| style="width: 381px;  background-color: rgb(204, 204, 204)" | <p style="text-align: center">'''Plant/Source'''</p>
'''Sector'''
+
| style="width: 217px;  background-color: rgb(204, 204, 204)" | <p style="text-align: center">'''Capacity (MW)'''</p>
 
 
|  
 
'''Energy demand (%)'''
 
 
 
|  
 
'''Electricity demand (%)'''
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Kiira (Large Hydro Power Station)</p>
Residential
+
| style="width: 217px" | <p style="text-align: center">200</p>
 
 
| <p style="text-align: center;">66.20</p>
 
| <p style="text-align: center;">25.70</p>
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Nalubaale (Large Hydro Power Station)</p>
Commercial
+
| style="width: 217px" | <p style="text-align: center">180</p>
 
 
| <p style="text-align: center;">14.30</p>
 
| <p style="text-align: center;">14.90</p>
 
|-
 
|
 
Industrial
 
 
 
| <p style="text-align: center;">12.80</p>
 
| <p style="text-align: center;">59.40</p>
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Bujagali (Large Hydro Power Station)</p>
Transport
+
| style="width: 217px" | <p style="text-align: center">250</p>
 
 
| <p style="text-align: center;">6.20</p>
 
| <p style="text-align: center;">0.00</p>
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Jacobsen Namanve (Thermal Power Plant)</p>
'''Total'''
+
| style="width: 217px" | <p style="text-align: center">50</p>
 
 
| <p style="text-align: center;">100</p>
 
| <p style="text-align: center;">100</p>
 
|}
 
 
 
(Source: Ministry of Energy and Minerals Development, Annual report 2010)
 
 
 
&nbsp;
 
 
 
'''&nbsp;Energy supply'''
 
 
 
Uganda imports energy to the tune of 1,075,356 TOE and exports up to 6,589 TOE. (Source: Ministry of Energy and Minerals Development, Energy Balance of Uganda 2010)
 
 
 
<br/>As mentioned above, Uganda’s main source of energy is biomass (woody and non-woody). Regarding electrical power generation, hydropower accounts for about 80% of the installed capacity of 595 MW. It should be noted that actual capacity available is less by about 100 MW due to the sinking water level in Lake Victoria. There used to be daily electricity shortages of up to 130-190 MW but these have recently decreased as a result of the commissioning of the Bujagali power station. By the time of full commissioning, scheduled for August 2012, it is hoped that the problem of electricity shortage will have been solved for at least two years.<br/>Other sources are thermal power plants and cogeneration which are mainly accountable for the increase of total grid electricity energy supply from 1,609 GWh in 2006 to 2,456 GWh in 2010. The following table shows Uganda‘s most important power stations.
 
 
 
{| cellpadding="1" cellspacing="1" border="1" style="width: 500px;"
 
|-
 
|
 
'''Plant/Source'''
 
 
 
|
 
'''Capacity (MW)'''
 
 
 
|-
 
|
 
Kiira hydro power station
 
 
 
|
 
200
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Electro-Maxx-Tororo (Thermal Power Plant)</p>
Nalubaale hydro power station
+
| style="width: 217px" | <p style="text-align: center">50</p>
 
 
|  
 
180
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Kakira Sugar Works Ltd (Cogeneration)</p>
Bujagali hydro power station
+
| style="width: 217px" | <p style="text-align: center">22</p>
 
 
|  
 
250 (planned)
 
 
 
100 (current)
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Kinyara sugar Works (Cogeneration)</p>
Jacobsen Namanve thermal power plant
+
| style="width: 217px" | <p style="text-align: center">7.5</p>
 
 
|  
 
50
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Kilembe Mines Ltd (Small Hydro)</p>
Electro max thermal power plant
+
| style="width: 217px" | <p style="text-align: center">5</p>
 
 
|  
 
20
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Tronder Power Bugoye (Small Hydro)</p>
Kakira Sugar Works Ltd. cogeneration
+
| style="width: 217px" | <p style="text-align: center">13</p>
 
 
|  
 
20
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Eco Power Ishasha (Small Hydro)</p>
Kinyara sugar works Ltd. cogeneration
+
| style="width: 217px" | <p style="text-align: center">6.5</p>
 
 
|
 
7
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Africa EMS Mpanga (Small Hydro)</p>
Kilembe Mines Ltd. small hydro power plant
+
| style="width: 217px" | <p style="text-align: center">18</p>
 
 
|  
 
5
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Hydromax Buseruka</p>
Bugoye small hydro power plant
+
| style="width: 217px" | <p style="text-align: center">9</p>
 
 
|  
 
13
 
 
 
 
|-
 
|-
|  
+
| style="width: 381px" | <p style="text-align: center">Kasese Cobalt Company Ltd</p>
Ishasha small hydro power plant
+
| style="width: 217px" | <p style="text-align: center">10.5</p>
 
 
|
 
6.5
 
 
 
|-
 
|  
 
Mpanga small hydro power plant
 
 
 
|  
 
18
 
 
 
 
|}
 
|}
  
&nbsp;(Source: Ministry of Energy and Minerals Development, Annual Report 2012)
+
[[Uganda Energy Situation#toc|►Go To Top]]
 
 
  
 
= Problem Situation<br/> =
 
= Problem Situation<br/> =
  
Wood fuels are largely used for cooking in rural areas while charcoal provides for the cooking needs of the urban population. Due to this heavy dependence on biomass, 30% of the rural areas register a rapid depletion and overuse of forests, leading to a severe lack of biomass for daily cooking needs.
+
Wood fuels are largely used for cooking in rural areas while charcoal mostly provides for the cooking needs of the urban population. High demand for wood fuels used inefficiently results in overuse and depletion of forests.. In 2012, 14.1% of Uganda’s land area was covered with forest.<ref>World Bank - http://data.worldbank.org/indicator/AG.LND.FRST.ZS </ref> The land available is becoming scarce and households prefer to use the land for food crops rather than planting trees. Since 1990 the forested area decreased from 49,240 km² down to 29,880 km². This means that from 1990 until 2010 more than 19,360 km², equaling 39&nbsp;% of the existing forest disappeared. Currently about 90,000 hectares (equals 900 km²) of forest cover are lost annually, which leads to fuel wood scarcity in rural areas and increasing price levels of charcoal and fuel wood. Between 2005 and 2008 the charcoal price rose at an enormous nominal rate of 14% per year.<ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 38 </ref> In addition, illegal cutting of trees increases. The production of charcoal is carried out under primitive conditions with an extremely low efficiency at 10 to 12% on weight-out to weigh-in basis and an efficiency rate on calorific value basis at 22%.<ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 68</ref> At the same time, households use biomass in a very inefficient way as the three-stone fire is still widely spread. Urban and rural households are facing increasing energy costs or spend more time collecting firewood. Furthermore, the traditional use of firewood is responsible for high indoor air pollution levels, thus causing respiratory diseases that affect women and children in particular. Moreover, the latter spend many hours and travel long distances to collect fuel wood. This deprives women of valuable time to engage in income generating activities and children to go to school and study. A total of 93% of rural households without access to electricity are currently using traditional lighting technologies such as candles or kerosene lamps that give poor quality lighting, emit noxious fumes and present hazards in terms of fires or burns (in particular for small children). Furthermore, the majority of social institutions (e.g. schools and health centres) in rural areas do not have access to electricity, which leads to inferior health and education services in comparison to electrified institutions. Lack of access to electricity also severely constrains the economic development of rural areas of Uganda, preventing the establishment of businesses that require electric power or forcing companies to buy diesel or petrol generators that are costly to operate and negatively impact the environment. Furthermore, job creation is being seriously constrained by the lack of adequate investment in the provision of rural infrastructure services, of which electricity is a key component. Lack of electricity also prevents access to information and communication technologies (e.g. mobile phones, computers, internet). This contributes to further isolation of rural areas from the rest of the country. Further, the quality of rural life is hampered by lack of electricity, particularly as rural public institutions such as health, educational and water facilities would be able to provide better services if they had access to electricity.<br/>[[Uganda Energy Situation#toc|►Go To Top]]
  
<br/>It is alarming to note that today, only 7% of Uganda’s land area is covered with forest. Most severely affected is the tropical high forest which has been reduced from about 19% to a mere 3%. Firewood scarcity is a grave constraint in Western Uganda, as well as in the rest of rural Uganda. Deforestation continues at a rate of 2.2% per year, leading to fuel wood scarcity in rural areas and an increase in price levels of charcoal and fuel wood in urban areas (about 6% per year).
+
= Energy resources =
  
<br/>Illegal cutting of trees continues to increase. About 15-20% of felled trees are used to produce charcoal, which is on demand in urban areas. Unfortunately, charcoal production is carried out under primitive conditions with an extremely low efficiency (between 8 to 12% of the original energy). At the same time, households use biomass inefficiently as the three-stone fire is still widely used for cooking. Urban and rural households are facing increasing energy costs and a lot of time is spent collecting firewood. Furthermore, the traditional use of firewood is responsible for high indoor air pollution levels, thus causing respiratory diseases that affect women and children in particular. Moreover, the two groups spend a lot of time, travelling long distances to collect fuel wood. This deprives women of valuable time to engage in income generating activities. Children also end up with no time to go to school and study [1].<br/>95% of rural households have no access to electricity and use traditional lighting technologies. These include candles or kerosene lamps that give poor quality lighting, emit noxious fumes and present a hazard in terms of fires or burns (regarding small children especially). Furthermore, majority of social institutions (e.g. schools and health centres) in rural areas do not have access to electricity which leads to inferior health and education services in comparison to electrified institutions.
+
Uganda is richly endowed with abundant energy resources, which are fairly distributed throughout the country. These include hydropower, biomass, solar, geothermal, peat and fossil fuels. The energy resource potential of the country includes an estimated 2,000 MW of hydro power, 450 MW of geothermal, 1,650 MW of biomass cogeneration, 460 million tons of biomass standing stock with a sustainable annual yield of 50 million tons, an average of 5.1 kWh/m<sup>2</sup> of solar energy, and about 250 Mtoe of peat (800 MW). In addition, petroleum in an estimated amount of 6.5 billion barrels, of which 1.4 billion barrels are recoverable, has been discovered in the western part of the country. The overall renewable energy power generation potential is estimated to be 5,300 MW.<ref>SE4ALL</ref>
  
<br/>Lack of access to electricity severely constrains the economic development of rural areas of Uganda, preventing establishment of certain businesses that require electricity and forcing companies to buy diesel or petrol generators that are costly to operate and have negative environmental impacts. Furthermore, job creation is seriously constrained by lack of adequate investment for provision of rural infrastructure services, of which electricity is a key component. In addition, lack of electricity limits access to information and communication technologies (e.g. mobile phones, computers, Internet). This contributes to continued isolation of rural areas.<br/>Household connections almost doubled to about 450,000 in 2011 (in comparison to 2005). Ironically, a substantial segment of rural businesses and households which are not connected to the main grid are willing and able to pay significant sums for electricity. Some of these have even resorted to self-provision of electricity, at a unit cost higher than it would prevail in an organized, commercial delivery system.[1]
+
== Biomass ==
  
<br/>In 2006, Uganda experienced an unprecedented electricity deficit of about 105 MW, due to prolonged drought, inadequate investment in low cost generation capacity and a relatively high load growth. This resulted in massive electricity rationing and forced the country to resort to expensive thermal generation. The government has since put in place a comprehensive plan to address energy deficits and meet the populations’ long term energy needs [2].
+
Biomass is the predominant type of energy used in Uganda, accounting for 94% of the total energy consumption in the country.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 101</ref> Charcoal is mainly used in the urban areas while firewood, agro-residues and wood wastes are widely used in the rural areas. Firewood is used mainly on three-stone fires in rural households and in food preparation by commercial vendors in urban areas. Only about 10% of all households use efficient stoves.<ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 16</ref> The same applies to the burning of farm residues. Firewood in some institutions like schools and hospitals is however used on improved stoves. Charcoal is mainly used on a metallic stove traditionally known as a ‘sigiri’ though the use of the clay sigiri is picking up. For the conversion of firewood into charcoal, earth mounds and pits are used as charcoal kilns. These have a wood conversion efficiency of 10 to 12% on weight-out to weight-in basis. This implies that about 9 kg of wood are needed to produce 1 kg of charcoal, which translates into 22% efficiency on an energy output to energy input basis. Introducing improved technologies may increase efficiency to achieve 3 to 4 kg of wood per kg of charcoal, which corresponds to 60% to 50% efficiency respectively on an energy basis.<ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 68</ref> Efforts to train charcoal burners have mainly been unsuccessful as most of them do it on an individual basis. Like in most African countries, research, development and dissemination of efficient and modern biomass technologies are not yet at the desired level.
  
 +
=== Biomass potential and distribution ===
  
= Energy Resources<br/> =
+
Various sources supply biomass, among them the different vegetation and land use types. The major sources are hardwood plantations, which consist of eucalyptus (50%), pine trees (33%) and cypresses (17%).<ref>FAO (2010) – Planted forests Uganda; http://www.fao.org/forestry/country/18316/en/uga/ </ref> The total standing biomass stock is stated with 284.1 million tons <ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 62</ref> with a potential sustainable biomass supply of 45 million tons. However, accessible sustainable wood biomass supply stands at 26 million tons.<ref>Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 11</ref> This amount meets 59% of the total demand of 44 million tons per year. The theoretical potential production of agriculture residues is between 1,186,000 and 1,203,000 tons annually.<ref>Ministry of Energy and Mineral Development, Uganda Renewable Energy Policy 2007 </ref> The only business that utilizes biomass residues for electricity production is the sugar industry in a cogeneration process. A small amount of coffee and rice husks is also utilized for heat production in cement and tiles manufacturing. Another small amount is used for the production of carbonized and non-carbonized briquettes. Most of the biomass is used for cooking while a small share is either used as a fertilizer and/or animal fodder. The wood biomass demand and supply scenario projects that in the next ten years, the country will move from a surplus to a deficit and later to an acute deficit. By year 2011, the deficit is estimated to be 10.7 million tons.
  
Uganda is richly endowed with abundant energy resources which are fairly distributed throughout the country. These include hydro, biomass, solar, geothermal, peat and fossil fuels. The energy resource potential of the country includes an estimated 2000 MW of hydro power, 450 MW of geothermal, 460 million tonnes of biomass standing stock with a sustainable annual yield of 50 million tons, an average of 5.1 kWh/m2 per day of solar energy, and about 250 million TOE of peat. In addition, an unspecified amount of petroleum has been discovered in the western part of the country. [2] The overall renewable energy power generation potential is estimated to be 5,300 MW. (Source: SE4ALL)
+
=== Biomass stoves: Best practice case study ===
  
== Biomass<ref name="Energy Resource">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.</ref><br/> ==
+
Against the background of high deforestation rates and firewood scarcity in Uganda, the Ministry of Energy and Mineral Development, with the support of the German Agency for International Cooperation (GIZ) through the Energy Advisory Project (EAP), partnered with NGOs and the private sector to promote the improved Rocket Lorena Stoves for households and institutions. The rocket stoves for households have been modified to fit the socio-economic setting of the poor by using locally available materials that can be obtained cheaply or at no cost. More information on the strategy, which has been successfully used to disseminate over 175,000 Rocket Lorena stoves in Bushenyi and Rakai districts in Uganda since 2005.
  
Biomass is the predominant energy type used in Uganda. It accounts for 90% of the total energy consumption in the country and grew by approximately 3.6% between 1995 and 2000. Key forms used are firewood, charcoal, and shrubs. Grass, farm residues and wood wastes are used in regions facing significant wood scarcity. Charcoal is mainly used in urban areas while firewood, agro-residues and wood wastes are widely used in rural areas. Whereas these resources are widely used for energy generation, most of the traditional biomass energy technologies which include wood and charcoal stoves, ovens and kilns used in Uganda are inefficient.
+
== Hydropower ==
  
<br/>Firewood is used mainly with three-stone stoves in rural households for cooking and for food preparation by commercial vendors in urban areas. Less than 9% of all households use efficient wood stoves. Although some institutions like schools and hospitals still use firewood, their stoves are most often more advanced. Charcoal is mainly used in a metallic stove traditionally known as a ‘sigiri’. Use of improved charcoal stoves with a ceramic insulation lining is increasing. The conversion of firewood to charcoal uses mainly earth mounds and pits, which give an average conversion efficiency of about 10% - 15%. Efforts to train charcoal makers in efficient ways to make charcoal have had a limited impact and most of them still make it on an individual and traditional basis. Like most African countries, research, development and dissemination of efficient and modern biomass technologies are inadequate.
+
The electricity supply system in Uganda was developed during the 1950s and 1960s with the construction of the [http://en.wikipedia.org/wiki/Nalubaale_Hydroelectric_Power_Station Owen Falls Hydropower Station] (later renamed Nalubale Power Station) with 10 generators with a total installed capacity of 150 MW. Later the power station was refurbished and upgraded to 180 MW and a new power station, Kiira, was constructed with a capacity of 200 MW. With the liberalization of the economy and the unbundling of the electricity utility, both Nalubale and Kiira hydro power stations were leased to [http://www.eskom.co.ug/ Eskom (U) Ltd] under a 20-year concession agreement. The two hydropower stations form the back bone of the electricity supply network in the country. The private companies Kilembe Mines Ltd, [http://www.tronderpower.com/ Tronder Power] and [http://www.kccl.co.ug/ Kasese Cobalt Co. Ltd] have their own smaller hydropower plants Mubuku I with 5.4 MW, Mobuku II with 14 MW and Mobuku III with 10.5 MW. The stations were initially built to supply their own industrial activity, but due to the interruption in the copper and cobalt production activities, the companies entered into a contract with the UETCL in 2003 to sell power to the grid. Other power stations are the [http://en.wikipedia.org/wiki/Kanungu_Power_Station Kanungu Power Station] of Eco Power with 6.4 MW, and [http://en.wikipedia.org/wiki/Mpanga_Power_Station Mpanga Power Station] of Africa Energy Management Systems with 18 MW. Three other small hydro power stations Kuluva (120 kW), Kagando (60 kW) and Kisiizi<br/>(300 kW) supply electricity to isolated hospital grids. The [http://www.giz.de/de/weltweit/310.html German Agency for International Cooperation (GIZ)] set up small hydro power plants in Bwindi (64 kW) and Suam (40 kW). The country is facing occasional electricity supply shortages. Uganda’s total installed capacity is 822 MW, generated primarily from Owen Falls Hydropower Station at Jinja in the South-Eastern part of Uganda (see [http://en.wikipedia.org/wiki/List_of_power_stations_in_Uganda Wikipedia "List of power stations in Uganda"]). However, during droughts (like in 2009), only around half of the installed capacity could be used as a result of the low water level of Lake Victoria. Contributing to electricity supply problems is the fact that growth in demand for electricity has not been matched with new generation capacity. To alleviate this problem, the government has procured emergency thermal generators. A new hydro facility has been developed at [http://ww.bujagali-energy.com/ Bujagali], and is operational since February 2012. The installation capacity is 250 MW. Before Bujagali became operational, 150 MW thermal capacities had been added in order to bridge the gap until the beginning of 2012. All big power generation plants belong to the [http://www.uegcl.com/ Ugandan Electricity Generation Company Limited (UEGCL)] but are operated and managed by [http://www.eskom.co.ug ESKOM], Aggreko and other companies. (Two dams in Uganda are equipped with desilting gates and have proper plans for the management of upstream water and land use issues. However, there are no national plans for optimised operation of power plants under variable flow regimes).
  
=== Biomass Potential and Distribution<br/> ===
+
=== Hydro potential and distribution ===
  
Biomass supply comes from various sources, the most prominent of which are hardwood plantations&nbsp; mainly eucalyptus and indigenous species, woodlands which consist of trees of 5m and above, with a canopy cover of over 40%,&nbsp; bush lands&nbsp; of small shrubs occurring in the open&nbsp; and subsistence farmland.
+
A Hydropower Development Master Plan has been developed with support from the [http://www.jica.go.jp/english/ Japan International Cooperation Agency (JICA)]. Uganda has considerable hydro resource potential estimated to be over 2,000 MW. The large-scale hydropower potential is along the White Nile, which originates in Lake Victoria. The flow of the White Nile River is controlled by the Owen Falls Dam. The water is released according to an “agreed curve” which is a relationship of the lake level and the flow representing the natural flow rate at Ripon Falls prior to the construction of the dam. In the long term, three large hydro power stations will be constructed. The [http://en.wikipedia.org/wiki/Isimba_Power_Station Isimba Power Station] with a capacity of 183.2 MW and expected to be operational in 2018. The [http://en.wikipedia.org/wiki/Karuma_Power_Station Karuma Power Station] with 600 MW installed capacity and expected to be operational in 2018. And the [http://en.wikipedia.org/wiki/Ayago_Power_Station Ayago Power Station] with a size of 600 MW and expected expected to be operational in 2023. The small and mini hydro sites are mainly located in the Eastern and the Western parts of the country which are hilly and mountainous. A total of 59 mini hydropower sites with a potential of about 210 MW have been identified through different studies. This gives a fair picture of the small and mini hydro potential in the country. Some of the sites can be developed for isolated grids and others as energy supply to the grid.
  
<br/>The total standing biomass stock is approximately 460 million tonnes, with a sustainable biomass supply of 50.8 million tonnes. However, accessible sustainable wood biomass supply stands at 27.7 million tonnes. When crop residues are included, whose theoretical potential in Uganda is about 4.4 million tonnes, there is a national net surplus. The total amount of agricultural residue left after harvesting or processing of crops amounts to almost 11 million tonnes per year. Unfortunately, the only businesses that utilize these residues for energy production are sugar factories which use the sugarcane residue for cogeneration that is limited for own use and in some cases feeding into the national grid. A small amount of coffee and rice husks is also utilized in heat production, in cement and tiles manufacturing. Otherwise all residues are either used as a fertilizer and/or animal fodder.
+
== Solar energy ==
  
<br/>In terms of overall wood biomass at national level, there is deficit of 85,000 tonnes, which can be covered by crop residues. At regional level, there is a deficit of about 3 million tonnes in both the Central and Eastern Regions, and a surplus of about 4 million tonnes in the Northern Region and of about 2 million in the Western Region.
+
The level of solar energy utilization in Uganda is still very low. The use of solar PV began in the early 1980s mainly driven by donor-funded programmes for lighting and vaccine refrigeration in health centers. Later the Uganda Railways Cooperation, a government parastatal, installed 35kW at 29 locations for communications and signaling. The Uganda Post and Telecommunications Cooperation also installed 30kW at 35 remote telecommunication sites through out the country. Some of the earlier initiatives included:
  
<br/>Looking at districts, Kampala has the biggest deficit, of over 2.5 million tonnes. Other major towns like Mbarara and Mbale also have significant deficits of 400,000 and 600,000 tonnes respectively. 26 districts have a surplus in biomass, while 30 lack sufficient amounts. The wood biomass demand and supply scenario predicts that in the next ten years, the country will move from a surplus to a deficit and later, to an acute deficit. For information on challenges and issues affecting the exploitation of biomass in Uganda, click here.
+
*PV systems installed by Uganda Rural Development and Training in Kagadi through a credit scheme supported by a Dutch organization Humanist Institute for Development Cooperation (HIVOS).
 +
*Habitat for Humanity and Solar Electric Light Fund funded by the US Department of Energy installed 125 solar home systems for low-income families in Kasese.
 +
*Solar Energy Uganda Ltd in partnership with Solar Light Churches for Africa installed a number of PV systems. However, the efforts were uncoordinated and lacked after-sales support.
  
=== Biomass Stoves: Best Practice Case Study<ref name="Best practice">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: VII - Best Practice Case Studies.</ref><br/> ===
+
In 2001, the Government launched the Rural Electrification Strategy and Plan (RESP) for the years of 2001 to 2010. It expired in 2012 due to delayed implementation. Among other, the RESP was supposed to increase the use of solar PV in rural areas. Unfortunately the RESP for 2001-2010 did not meet expectations. The plan anticipated rural electricity access to grow from the then-estimated 1% percent in rural population access to 10%. However the actual result was an increase of rural access by less than 5% percent. Also the RESP had a target of 80,000 PV systems by 2012 but in the end only 7,000 systems were installed.<ref>REA - Rural electrification strategy and plan 2013-2022 </ref> Following this, the [http://rea.or.ug/phocadownload/rural electrification strategy and plan 2013-2022.pdf Rural Electrification Strategy and Plan 2013 – 2022] was published. As part of the rural electrification program, Energy for Rural Transformation (ERT I), supported by the World Bank, is implementing PVTMA, a sales-based performance subsidy scheme that also provides business development support to private PV dealers, which is expected to increase PV sales. Under the same programme, the Ministries of Health, Education, and Water and the Uganda Communication Commission have procured PV systems to meet their sectors' electricity needs. The Ministry of Health planned for 568 PV systems for health centers under ERT Phase I. Finally 79 Solar DC vaccine fridges were supplied to Health Centers (HC); 261 staff houses received stand alone solar PV energy packages for lighting and operation of radio and TV/VCR; and 220 medical buildings received 17 stand alone solar PV energy packages. The Ministry of Education planned for 458 solar systems for 129 post-primary institutions in 10 districts. By the end of the ERT I, 94 of the 129 institutions had been electrified. After ERT I, the second [http://www.worldbank.org/projects/P112334/uganda-energy-rural-transformation-apl-2?lang=en Energy for Rural Transformation (ERT II)] project was initiated. Its focus is to increase access to energy and Information and Communication Technology (ICTs) in rural Uganda. There are three components to the project, which are: rural energy infrastructure, the ICT and energy development in terms of cross sectoral links and impact monitoring. The project is running from 6th of April 2009 until 30th June 2016 and will cost about 105 million USD.<ref>Worldbank - http://www.worldbank.org/projects/P112334/uganda-energy-rural-transformation-apl-2?lang=en </ref> One part of the ERT II was the supply, installation, commissioning and maintenance of PV packages for 310 primary education institutions.<ref>https://www.devex.com/projects/tenders/energy-for-rural-transformation-ert-ii-project-in-uganda-supply-installation-commissioning-and-maintenance-of-solar-photovoltaic-energy-packages-for-310-post-primary-education-institutions-in-uganda/74846 </ref>
  
Against a background of high deforestation rates and firewood scarcity in Uganda, the Ministry of Energy and Mineral Development (MEMD), with the support of the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH, through the Energy Advisory Project (EAP) and its successor PREEEP, has partnered with NGOs and the private sector to promote improved stoves. These include the Rocket Lorena Stove, shielded fire rocket stoves for households. They also promote institutional rockets stoves and baking ovens for social institutions and SMEs. Rocket stoves for households have been modified to fit the socio-economic setting of the rural poor by using locally available materials that can be obtained cheaply.&nbsp;
+
=== Solar potential and distribution ===
  
== Hydropower<ref name="Energy Resource">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.</ref><br/> ==
+
The average solar radiation is 5.1 kWh/m<sup>2</sup>/day. Existing solar data clearly indicate that the solar energy resource in Uganda is high throughout the year. The data indicate a yearly variation (max month / min month) of only about maximum 20% (from 4.5 to 5.5 W/m<sup>2</sup>), which is due to the location near the equator. The insolation is highest in the dryer area in the north-east and very low in the mountains in the east and south-west.
  
The electricity supply system in Uganda was developed during the 1950s and 1960s with the construction of the [http://en.wikipedia.org/wiki/Nalubaale_Hydroelectric_Power_Station Owen Falls Hydropower Station] (later renamed Nalubale Power Station) with 10 generators with a total installed capacity of 150 MW. Later the power station was refurbished and upgraded to 180 MW and a new one; Kiira with a capacity of 200 MW constructed. With the liberalization of the economy and the unbundling of the electricity utility, both Nalubale and Kiira hydro power stations were leased to Eskom (U) Ltd under a 20 year concession agreement. The two hydropower stations form the back bone of the electricity supply network in the country.<br/>Two private companies, Kilembe Mines Ltd and Kasese Cobalt Co. Ltd, have their own smaller hydropower plants Mubuku I 5.4 MW and Mobuku III 10.5 MW. The stations were initially built to supply their own industrial activity, but due to the interruption in the copper and cobalt production activities, the companies entered into a contract with the Uganda Electricity Transmission Company in 2003 to sell power to the grid. Three other small hydro power stations Kuluva (120 kW) Kangando (60 kW) and Kisiizi (60 kW) supply electricity to isolated hospital grids. Kisiizi is being upgraded to 300 kW under the Energy for Rural Transformation Programme.<br/>The country is faced with acute electricity supply shortage. Uganda’s total installed capacity is 630 MW, generated primarily from [http://en.wikipedia.org/wiki/Nalubaale_Hydroelectric_Power_Station Owen Falls Dam] at Jinja in the South Eastern Uganda (see [http://en.wikipedia.org/wiki/List_of_power_stations_in_Uganda Wikipedia "List of power stations in Uganda"]). &nbsp;However, in 2009 only 140 MW (380 installed that time) could be used as a result of the low levels of Lake Victoria. The other cause of the electricity supply problems is that growth in demand for electricity has<span style="font-family: monospace;"></span>not been matched with new generation capacity. To alleviate this problem, the government has procured emergency thermal generators resulting in increase electricity tariff.
+
=== Photovoltaik: Best practice case study ===
  
A new hydro facility has been developed at [http://ww.bujagali-energy.com/ Bujagali], and is operational since February 2012. This installation will generate approximately 250 MW. Before Bujagali became operations 150 MW thermal capacities had been added in order to bridge the gap until strat of 2012. All big power generation plants belong to the [http://www.uegcl.com/ Ugandan Electricity Generation Company Limited (UEGCL)] but are operated and managed by ESKOM, Aggreko and other companies.(Two dams in Uganda are equipped with desilting gates and have proper plans for the management of upstream water and land use issues. However, there are no national plans for optimised operation of power plants under variable flow regimes). In the long term, four large hydro power stations will be constructed at Ayago North (300MW), Ayago South (200MW) and Kalagala (450MW) in 2012 – 2020 and Murchison falls (Uhuru – 300MW).
+
Against the background of low electrification rates, particulalry in rural areas, the Uganda Ministry of Energy and Mineral Development with financial support from [http://www.ug.undp.org/ UNDP] and [http://www.thegef.org/gef/ GEF] implemented the [http://www.energia.org/fileadmin/files/media/EN112001_sengendo.pdf Uganda Photovoltaic Pilot Project for Rural Electrification (1998-2003)]. The main objective of the project was to provide basic electrical services through solar PV to rural areas unlikely to have access to grid-based electricity in the foreseeable future.
  
 +
=== Solar power in refugee camps ===
  
 +
Uganda hosts one of the largest refugee settlement camps (Bidi Bidi) in the world. So, the 2018 Smart Communities Coalition Off-Grid Energy Challenge invited businesses to submit their proposal for providing clean off-grid energy in these refugee camps. Four Ugandan companies, namely Solar Today, Power Trust Uganda Limited, Aga Great Work Limited, and Raising Gabdho Foundation, each won a grant worth USD 100,000. Solar today will provide remote-controlled solar systems for business in Rwamwanja refugee camps. They will offer a 10% discount to these businesses and do not require an upfront cost. Power Trust Uganda Limited will set up stand-alone business hubs in Kiryandongo refugee camps. Aga Great Work Limited will set up a solar-powered mini-grid in Bidi Bidi refugee camps to provide electricity and promote productive end use activities in the settlement camps as well as the host communities. Raising Gabdho Foundation will provide clean cooking solutions in Bidi Bidi refugee camps. <ref>https://uganda7.com/info/four-ugandan-companies-win-grants-to-power-refugee-camps/</ref>
  
=== Hydro Potential and Distribution<br/> ===
+
=== Self-consumption solar plant at a dairy farm in Uganda - case study ===
 +
This case study portrays the [[Solar_Energy_Plant_for_Self-Consumption_in_Uganda|first self-consumption solar plant at a dairy farm in Uganda]], which is a new and innovative solar energy concept in the country, implemented by [https://equatorsolargroup.com/ Equator Solar]. As a result, many manufacturers and industries can now produce their own inexpensive energy with captive power plants.
  
Uganda has considerable hydro resource potential estimated to be over 2000 MW. The large-scale hydropower potential is along the White Nile which originates from Lake Victoria. The flow of the White Nile River is controlled by the Owen Falls Dam which was constructed in 1954. The water is released according to an “agreed curve” which is a relationship of the lake level and the flow representing the natural flow rate at Ripon Falls prior to the construction of the dam.<br/>There are six potential hydropower sites along the White Nile. These are: Bujagali 250 MW, Kalagala 450 MW, Karuma (Kamdini) 150 MW, Ayago North 300 MW, Ayago South 250 MW and Murchison Falls 600 MW. Bujagali and Karuma sites have been significantly studied and the sites are being developed through on a Public Private Partnership (PPP) basis to generate electricity in the medium term (2007-2012).<br/>The small and mini hydro sites are mainly located in the east and the western parts of the country which are hilly and mountainous. A total of 59 mini hydropower sites with a potential of about 210 MW have been identified through different studies. The level of studies is uneven with some sites having been studied to feasibility stage. Nevertheless, this gives a fair picture of the small and mini hydro potential in the country. Some of the sites can be developed for isolated grids and others as energy supply to the grid.
+
The advantages of this concept can be outlined as follows:
 +
*'''Increasingly Popular''': Captive power plants are becoming increasingly popular among industrial complexes who require constant energy to power their operations. Captive power plants can be in schools, hotels, offices & industrial companies.
 +
*'''Produce and Consume Your Own Energy''': Energy production and consumption occur together at the source. Hundred percent of the power generated is utilised by the owner/producer of the plant.
 +
*'''Grid connected''': Although the location where a captive power plant is deployed may be grid-connected, the electricity generated is not sent to the national grid.
 +
*'''Save Money''': An own energy plant will always be cheaper than a grid energy supplier.
 +
*'''Finance Schemes Available''': A captive plant can be fully financed by the user of the electricity, the developers of the project or a third party financier.
  
For information on challenges and issues affecting the exploitation of hydropower in Uganda, click [[Challenges and issues affecting the exploitation of renewable energies in Uganda#Hydropower|here]].
+
Read more [[Solar Energy Plant for Self-Consumption in Uganda|here.]]
  
 +
=== Solar Power for Saving Lives in Uganda - case study ===
  
 +
The St. Francis Naggalama Hospital in Naggalama, Uganda acquired a solar back-up system from [https://equatorsolargroup.com/ Equator Solar] in order to ensure power supply during power outages and [[Solar Power for Saving Lives in Uganda|save lives]]. The installations of a 22 kWp solar PV system initiated on 24th September, 2021. This is the second solar PV system installed at the Hospital by Equator Solar following the initial 12 kWp solar system that was commissioned in 2019.
  
== Solar Energy<ref name="Energy Resource">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.</ref><br/> ==
+
The new system is integrated with 21 kWh supercapacitor-based batteries that are to act as an emergency power back-up in case of any power outages at the hospital.
  
The level of solar energy utilization in Uganda is still very low. The use of solar [[Photovoltaic (PV)|photovoltaic (PV)]] began in the early 1980s mainly driven by donor funded programmes for lighting and vaccine refrigeration in health centers. Later the Uganda Railways Cooperation, a government parastatal, installed 35kW at 29 locations for communications and signaling. The Uganda Post and Telecommunications Cooperation also installed 30kW at 35 remote telecommunication sites through out the country.
+
The back-up system, is significant towards ensuring an uninterrupted power supply for the hospital especially in scenarios where a stable electricity supply is required, that is; during operations and powering of life saving devices.
  
<u>Some of the earlier initiatives included:</u>
+
Read more [[Solar Power for Saving Lives in Uganda|here.]]
  
*PV systems installed by Uganda Rural Development and Training in Kagadi through a credit scheme supported by a Dutch organization Humanist Institute for Development Cooperation (HIVOS).
+
=== 28 kWp Solar PV Solution for Hotel in Uganda - case study ===
*Habitat for Humanity and Solar Electric Light Fund funded by the US Department of Energy installed 125 solar home systems to low income families in Kasese.
 
*Solar Energy Uganda Ltd in partnership with Solar Light Churches for Africa installed a number of PV systems. However, the efforts were uncoordinated and lacked after sales support.
 
  
 +
A hotel in Uganda acquired a [[28 kWp Solar PV Solution for Hotel in Uganda|28 kWp solar system]] from [https://equatorsolargroup.com/ Equator Solar], which is in captive power configuration with zero feed-in implementation. The objective of the solar solution is to reduce grid electricity costs. The grid parallel design without batteries is for direct consumption of produced solar electricity without temporary storage. Zero feed-in implementation ensures that no electricity is fed back to the grid in the event of potential surplus production which is a regulatory requirement.
  
 +
The flexible and scalable design basis provides the opportunity to extend the system in future. This can be the installation of more solar panels for increased generation capacity as well as the installation of a battery storage solution for the storage of solar electricity for night-time use and to provide a power back-up.
  
In 1998-2003, the Government with funding from UNDP and GEF implemented the Uganda Photovoltaic Pilot Project for Rural Electrification which was aimed at removing barriers to the wide spread use of solar PV. The project created awareness, built the capacity of the private and arranged financing for vendors and end-users among other things. As a result, the solar PV industry has become vibrant. Although no comprehensive study has been under taken, it is estimated that over 20,000 systems are installed in the country.<br/>In 2001, the Government put in place a Rural Electrification Strategy and Plan (RESP) which will among other things increase the use of solar PV in rural areas. The RESP has a target of 80,000 PV systems by 2012. As part of the rural electrification program, Energy for Rural Transformation (ERT), supported by the World Bank, the Private Sector Foundation is implementing sales based performance subsidy scheme and providing business development support to private PV dealers which is expected to increase PV sales. Under the same programme, the Ministries of Health, Education, and Water and the Uganda Communication Commission have procured PV systems to meet their sectors' electricity needs. The Ministry of Health procured 568 PV systems for health centers under ERT phase 1 and the Ministry of Education 458 solar systems for 129 post-primary institutions in 10 districts.<br/>The number of solar thermal systems installed for hot water is very low, estimated to be less than 500 countrywide. There has been no major Government initiative for promoting solar water heaters in the country although in 2007, the government planned a pilot project with support from REEEP expected to install 45,000 solar water heaters by 2012.<br/>According to the Alternative Resources Assessment and Utilisation Study, the total potential for solar water heaters is estimated at 161,000 m2 of collector. A substantial growth in the economy may lead to a much higher demand than assumed if only 10% of urban households demand hot water.
+
Read more [[28 kWp Solar PV Solution for Hotel in Uganda|here.]]
  
 +
== Wind energy ==
  
 +
All wind measurements, which have been carried out so far are for meteorological record purposes (general weather data). The standard height for the location of measuring equipment is two meters above the ground and the sensors are often placed close to obstacles. The wind data collection from the national meteorological stations was never done with the intention of monitoring wind speeds for energy utilization. Based on wind data collected at 11 sites in three years (1989-1992) by the Department of Meteorology, Ministry of Water, Lands and Environment, the wind speeds in most areas of Uganda are moderate with average speed not exceeding 3 m/s. In some areas with complex terrain, the wind may speed up due to slopes of hills, escarpments and tunneling effects. In the mountain areas in the south-western part towards the border with Rwanda (Kabale, Kisoro, Ntungamo) and in the area around Mt. Elgon the average wind speed goes up to about 4 m/s. Measurement carried out under the Alternative Energy Resource Assessment and Utilisation Study at two sites for five months (June-Sept 2003) indicated that the average wind speed at Kabale and Mukono at 20m was 3.7m/s. This study concluded that the wind energy resource in Uganda is insufficient for large-scale electricity generation. However, the wind resource may be suitable for special applications, such as water pumping in remote areas and for small-scale electricity generation in mountainous areas. It is possible that some sites could have enough wind speeds to generate substantial amount of electricity. Preliminary investigations in the Karamoja region (North-Eastern Uganda) and along the shores of lake Victoria have shown that there could be potential for production of electricity on a medium scale.
  
=== Solar Potential and Distribution<br/> ===
+
== Geothermal energy ==
  
The average solar insolation is 5.1kWh/m2/day. Existing solar data clearly indicates that the solar energy resource in Uganda is high throughout the year. The data indicate a yearly variation (max month / min month) of only about maximum 20% (from 4.5 to 5.5W/m2), which is due to the location near the equator. The insolation is highest in the dryer area in the north-east and very low in the mountaineous areas in the east and south-west.
+
The exploration for geothermal resources in Uganda is still at the reconnaissance and exploration stage. Reconnaissance surveys on Ugandan hot springs started in 1921 by the geological survey of Uganda and the first results were published by Wayland (1935). In 1973, as a result of the oil crisis, an attempt was made to initiate a geothermal project with United Nations support, but this did not materialise due to the political turmoil in the country. Geothermal energy resources in Uganda are estimated at 450 MW. Exploration for geothermal energy has been in progress since 1993. So far, three potential areas all situated in western Uganda, in the western branch of the East African Rift Valley have been identified for detailed exploration. The three potential areas are Katwe-Kikorongo, Buranga and Kibiro. Based on recent assessments, they have all been ranked as potential targets for geothermal development. The current study results indicate that the temperature level varies between 150 C° and 200 C° which is sufficient for electricity generation and for direct use in industry and agriculture. The rest of the geothermal areas of Uganda are at a preliminary level of investigation and results will soon be available as basis for their prioritisation for detailed surface exploration.
  
For information on challenges and issues affecting the exploitation of solar energy in Uganda, click [[Challenges and issues affecting the exploitation of renewable energies in Uganda#Solar_energy|here]].
+
== Cogeneration ==
  
 +
Currently there is a capacity of 29.7 MW in two cogeneration plants installed, which both run with bagasse as fuel.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 27</ref>Further there is a considerable potential of cogeneration in the sugar processing industry as well as textile manufactures, beer industry, cement industries and foods and beverages industry. The potential in the sugar industry alone is currently estimated to be over 100 MW while for other industries it could be over 50 MW. Cogeneration contributes to power generation as well as to the goal of energy efficiency.<ref>SE4ALL</ref>
  
 +
== Fossil fuels ==
  
=== Photovoltaic (PV): Best Practice Case Study<ref name="Best practice">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: VII - Best Practice Case Studies.</ref><br/> ===
+
The annual consumption of petroleum products was 1.4 billion litres in 2012, which is an increase of 13.9&nbsp;% compared to 2011. The average annual growth of petroleum consumption is about 7%.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 72</ref> In 2012, the import bill for petroleum and petroleum products was the highest, totaling 1.3 billion US$ and accounting for 22.2&nbsp;% of expenditure on formal imports. The total amount of petroleum products imported in 2012 stood at 1.227 billion litres. The composition is as follows: Petrol (41.1%), Kerosene (6.1%), and diesel products (52.8%). Uganda imports all its petroleum products from overseas since there is no local production yet. About 95% of Uganda’s petroleum imports are routed through Kenya and only 5% come through Tanzania.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 71</ref> Oil has been detected in six sedimentary basins in Uganda, the most prospective being the Albertine Graben covering 23,000 km<sup>2</sup> in the Western Rift Valley along Uganda’s Border with the Democratic Republic of Congo. Two other basins, Hoima basin and Lake Kyoga basins are still under investigation. Currently the amount of oil discovered is about 6.5 billion barrels of which 1.4 billion barrels are recoverable. But it has to be noted that the numbers change every now and then, suiting to the political situation or new research projects. It is important to note that only around 40% of the Albertine rift basin has been evaluated. This discovery is placing Uganda among the foremost African oil producers. So far over 1 billion US$ has been invested in seismic and drilling of wells since 1998. By international standards the cost of finding a barrel of oil has been very low in Uganda. Bigger investments are required to develop the discovered oil and gas fields. A refinery with an input capacity of 60,000 barrels per day will be build in a modular manner, starting with a capacity of 30,000 barrels per day by the end of 2016 which will be increased to 60,000 barrels per day before 2020.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 162</ref> A production sharing agreement between the Government and the consortium Tullow Oil (Ire-UK), Total (F) and CNOOC (China) was concluded in February 2012. The consortium will in the near future detail its planning for the construction of the oil fields. Norway is the lead development partner in the petroleum sector, with a three-year, US$15 million programme, which began in June 2009. The IMF is providing support on petroleum revenue management; the AfDB is providing support on infrastructure; Ireland is considering ways in which it can support civil society in Uganda to work in the sector; DFID is already funding some groups and is exploring other ways to support civil society; and the World Bank is helping with environmental regulations and discussing a possible Petroleum Sector Support Project with the government. The EU delegation is active in all pertinent donor forums in which oil is becoming an increasingly important issue. The EU is actively seeking a better coordination and consolidation of current donor activity.<ref>SE4ALL</ref>
  
Against the background of <span class="mw-redirect">low electrification rates</span>, particularly in rural areas, the Uganda Ministry of Energy and Mineral Development with financial support from UNDP and GEF implemented the Uganda Photovoltaic Pilot Project for Rural Electrification (1998-2003). The main objective of the project was to provide basic electrical services through solar PV to rural areas unlikely to have access to grid-based electricity in the foreseeable future. More information on the project can be found [https://energypedia.info/index.php/Uganda:_Best_Practice_Case_Studies here].
+
*For more information on the fossil fuels resources in Uganda, click [[Petroleum Resources in Uganda|here]].<br/>
  
 +
[[Uganda Energy Situation#toc|►Go To Top]]
  
 +
= Electricity transmission and distribution<br/> =
  
== Wind Energy<ref name="Energy Resource">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource.</ref><br/> ==
+
The Ugandan grid is split up into transmission (> 30 kV) and distribution (<= 30 kV). The transmission system losses are approximately less than 4&nbsp;% and the distribution system losses were 38% in 2005, 26.1% in 2012 and 24,9% in June 2013.<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 33</ref>
 +
<div>
 +
== Transmission<br/> ==
  
Due to its geographical location, Uganda does not seem to benefit from good wind resources with most areas having wind speeds less than 3.0 m/s. The wind data collection from the national meteorological stations was never done with the intention of monitoring wind speeds for energy utilization. It was primarily for weather forecast and aviation. The standard height for the location of measuring equipment is two metres above the ground and the sensors are often placed close to obstacles. No substantive investigation in the area of wind energy has been carried out in Uganda to characterize the wind distribution. It is possible that some sites could have enough wind speeds to generate substantial amount of electricity.
+
The Uganda Electricity Transmission Company Ltd. (UETCL) is the bulk supplier and single buyer of power for the national grid in Uganda. It purchases all independently generated power in the country and it also imports electricity from neighboring countries. UETCL is also responsible for publishing standardized tariffs for renewable energy generation of up to 20 MW capacity based on the avoided cost principle. The length of domestic transmission and distribution lines is 14,312 km.<br/>
  
 +
== Distribution<br/> ==
  
 +
The biggest company empowered to trade and supply electricity at 33kV and below is [http://www.umeme.co.ug Umeme Ltd], which leased the assets of the formerly government-owned distribution company (Uganda Electricity Distribution Company Ltd - UEDCL). There are some mini-grid distribution systems and one off-grid generation and distribution company (West Nile Rural Electrification Company Ltd).
 +
</div>
  
=== Wind Potential and Distribution<br/> ===
+
= Energy Tariffs =
  
Based on wind data collected at 11 sites in three years (1989-1992) by the Department of Meteorology, Ministry of Water, Lands and Environment, the wind speeds in most areas of Uganda are moderate with average speed not exceeding 2 m/s.<br/>In some areas with complex terrain, the wind may speed up due to slopes of hills, escarpments and tunneling effects. In the mountain areas in the south-western part towards the border with Rwanda (Kabale, Kisoro, Ntungamo) and in the area around Mt. Elgon the average wind speed goes up to about 4 m/s.<br/>Measurement carried out under the Alternative Energy Resource Assessment and Utilisation Study at two sites for five months (June-Sept 2003) indicated that the average wind speed at Kabale and Mukono at 20m was 3.7m/s.<br/>The study concluded that the wind energy resource in Uganda is insufficient for large scale electricity generation. However, the wind resource may be suitable for special applications, such as water pumping in remote areas and for small scale electricity generation in mountainous areas.
+
=== Energy cost ===
  
For information on challenges and issues affecting the exploitation of wind energy in Uganda, click [[Challenges and issues affecting the exploitation of renewable energies in Uganda#Wind_energy|here]].
+
The end user tariff for domestic consumers is at 520.6 UGX (Umeme - Q4,2014), one of the highest in East Africa. This is due the enormous raise of prices (52%)<ref>Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 33</ref> in 2012 up to nearly cost-covering end-consumer prices. Currently, the end user retail tariff is based on consumer category as illustrated in the following table. However, to cater for the poor, the life line tariff was not increased and remains at UGX.100 per unit up to 15 kWh per month. The following table shows all the Umeme tariffs from Q4,2014.<ref>Umeme - http://www.umeme.co.ug/articles/TariffAdNV.pdf</ref>
 +
{| style="width: 100%" cellspacing="2" border="0"
 +
|-
 +
| style="background-color: rgb(240, 240, 240)" | '''Charge'''
 +
| style="background-color: rgb(240, 240, 240)" | '''Code 10.1 (domestic)'''
 +
| style="background-color: rgb(240, 240, 240)" | '''Code 10.2/3 (commercial)'''
 +
| style="background-color: rgb(240, 240, 240)" | '''Code 20 (medium industrial)'''
 +
| style="background-color: rgb(240, 240, 240)" | '''Code 30 (large industrial)'''
 +
| style="background-color: rgb(240, 240, 240)" | '''Code 50 (street lights)'''
 +
|-
 +
| style="background-color: rgb(219, 229, 241)" | Average
 +
| style="background-color: rgb(219, 229, 241)" | 520.6
 +
| style="background-color: rgb(219, 229, 241)" | 474.4
 +
| style="background-color: rgb(219, 229, 241)" | 458.9
 +
| style="background-color: rgb(219, 229, 241)" | 310.4
 +
| style="background-color: rgb(219, 229, 241)" | 488.8
 +
|-
 +
| style="background-color: rgb(219, 229, 241)" | Peak
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
| style="background-color: rgb(219, 229, 241)" | 569.7
 +
| style="background-color: rgb(219, 229, 241)" | 542.3
 +
| style="background-color: rgb(219, 229, 241)" | 373.7
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
|-
 +
| style="background-color: rgb(219, 229, 241)" | Shoulder
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
| style="background-color: rgb(219, 229, 241)" | 475.0
 +
| style="background-color: rgb(219, 229, 241)" | 452.2
 +
| style="background-color: rgb(219, 229, 241)" | 311.6
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
|-
 +
| style="background-color: rgb(219, 229, 241)" | Off-peak
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
| style="background-color: rgb(219, 229, 241)" | 354.0
 +
| style="background-color: rgb(219, 229, 241)" | 371.0
 +
| style="background-color: rgb(219, 229, 241)" | 232.5
 +
| style="background-color: rgb(219, 229, 241)" | -
 +
|}
  
 +
<br/>
  
 +
=== Feed-in-Tariffs (FiT) ===
  
== Geothermal&nbsp; ==
+
To promote the development and use of renewable energy sources, the Government has developed a feed-in-tariff structure. A Feed-in-Tariff (FIT) is an instrument for promoting private sector generation of electricity from renewable energy sources. Renewable energy in the context of REFIT is defined as electricity, which can be generated from energy resources such as water power, wind power, solar energy, geothermal energy, biogas and landfill gas combustion, and biomass cogeneration. The REFIT applies to small-scale renewable energy systems of prescribed priority technologies, up to a maximium installed project capacity of 20 MW, as defined by the Electricity Act 1999. The Feed-in-Tariff (FiT) for solar power was approved by the ERA board in April 2014 at an amount of US$0.11/kWh.<ref>ERA - http://www.era.or.ug/index.php/2013-10-23-18-03-21/2013-10-23-18-12-48/featured-articles/320-feed-in-tariff-for-grid-connected-solar-pv-electricity </ref> The FiTs are paid by the Uganda Electricity Transmission Limited (UETCL).
  
The exploration for geothermal resources in Uganda is still at the reconnaissance and exploration stage. Reconnaissance surveys on Ugandan hot springs started in 1921 by the geological survey of Uganda and the first results were published by Wayland (1935). In 1973, as a result of the oil crisis, an attempt was made to initiate a geothermal project with United Nations support, but this did not materialise due to the political turmoil in the country.
+
<br/>
  
Geothermal energy resources in Uganda are estimated at 450 MW. Exploration for geothermal energy has been in progress since 1993. So far three potential areas all situated in western Uganda, in the western branch of the East African Rift Valley have been identified for detailed exploration. The three potential areas are Katwe-Kikorongo, Buranga and Kibiro. Based on recent assessments, they have all been ranked as potential targets for geothermal development.&nbsp;The current study results indicate that the temperature level varies between 150 C° and 200 C° which is sufficient for electricity generation and for direct use in industry and agriculture. The rest of the geothermal areas of Uganda are at a preliminary level of investigation and results will soon be available that will be a basis for their prioritisation for detailed surface exploration. Further information on the current status can be found in this publication [http://www.os.is/gogn/unu-gtp-sc/UNU-GTP-SC-10-0904.pdf here].
+
= Key Problems of the Energy Sector =
  
 +
According to Power Africa, these two issues are the biggest to face Uganda's energy sector<ref name="Power Africa. (2018). Uganda Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Uganda_-_November_2018_Country_Fact_Sheet.pdf">Power Africa. (2018). Uganda Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Uganda_-_November_2018_Country_Fact_Sheet.pdf</ref>:
  
 +
*Lack of integrated power sector planning<br/>
 +
*Lack of fully functional financial ecosystem<br/>
  
== Fossil Fuels<ref name="Energy Resource">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: II - Energy Resource. </ref><br/> ==
+
<br/>
 
 
As of 2007, consumption of petroleum in Uganda stands at 800,000 m³ per annum growing at about 6% per annum since 1997. The petroleum import bill stands at US$ 250 million per year. This constitutes about 8% of total national imports and represents slightly above 20% of total export earnings.
 
 
 
Uganda imports all its petroleum products requirements from overseas since there is no local production yet. About 90% of Uganda’s petroleum imports are routed through Kenya with only 10% coming through Tanzania.
 
 
 
For more information on the fossil fuels resources in Uganda, click [[Fossil Fuel Resources in Uganda|here]].
 
 
 
 
 
= Electricity Transmission and Distribution<br/> =
 
 
 
== Transmission ==
 
 
 
<span>The [http://www.uetcl.com Uganda Electricity Transmission Company Ltd. (UETCL)] is the bulk supplier and single buyer of power for the national grid in Uganda. It is the purchaser of all independently generated power in the Country and it also imports electricity from neighbouring countries. UETCL is also responsible for publishing standardized tariffs for renewable energy generation of up to 20 MW capacity based on the avoided cost p</span><span style="">rinciple.The l</span>ength of domestic transmission and distribution lines is14312 km.
 
 
 
 
 
 
 
== Distribution ==
 
 
 
The biggest company empowered to trade and supply electricity at 33kV and below is [http://www.umeme.co.ug Umeme Ltd], leased the assets of the formerly government owned distribution company (Uganda Electricity Distribution Company Ltd). There are some mini-grid distribution systems and one off-grid generation and distribution company (West Nile Rural Electrification Company Ltd).
 
 
 
 
 
  
 
= Policy Framework<br/> =
 
= Policy Framework<br/> =
Line 394: Line 274:
 
== Energy Policy and Poverty Reduction Strategy<br/> ==
 
== Energy Policy and Poverty Reduction Strategy<br/> ==
  
The goal of the policy is to meet the energy needs of the Ugandan population for social and economic development in an environmentally sustainable manner.
+
The Government of Uganda has over the past eight years embarked on a Power sub-Sector Reform Programme, which has resulted in the implementation of significant structural changes within the sector. The Reform Programme was aimed at providing adequate, reliable and least-cost power supply to meet the country’s demand, promoting the efficient operation of the power sector and scaling up rural and peri-urban access to maximize the impact on poverty reduction. Despite the implementation of these reforms, the country continues to experience significant power supply shortages, low rates of access to electricity and high levels of power losses, all negatively impacting the country’s economic growth. The low level of access to modern forms of energy, particularly electricity, has continued to be one of the major infrastructure bottlenecks to socio-economic growth in Uganda.<ref>SE4ALL</ref>
 
+
<div><br/></div>'''<u>The following laws have been passed in order to reform the energy sector:</u>'''<br/>
The energy policy seeks to meet the <u>following broad objectives<ref name="Energy policy">GTZ (2007): Eastern Africa Resource Base: GTZ Online Regional Energy Resource Base: Regional and Country Specific Energy Resource Database: IV - Energy Policy. </ref></u>:
+
=== The Electricity Act, 1999 ===
 
 
 
 
 
 
'''1. To establish the availability, potential and demand of the various energy resources in the country'''
 
 
 
<u>To meet this objective the Government shall:</u>
 
 
 
*Prepare a database on all the available energy resources and energy consumption patterns in order to have a long term perspective of the options for demand/supply matching; and package information on potential projects for investment.
 
*Build the necessary local capacity to acquire the required data and assess and evaluate the resources.
 
 
 
 
 
 
 
'''2. To increase access to modern affordable and reliable energy services as a contribution to poverty eradication'''
 
 
 
<u>&nbsp;To achieve this objective the Government shall:</u>
 
 
 
*Attract private capital and management in the energy sector; promote competition between energy service providers; promote the development of markets in energy technologies and services.
 
 
 
*Put in place a conducive environment to accelerate rural energy supply and access by:
 
<ol style="list-style-type:lower-roman;">
 
<li>Applying subsidies exclusively on capital investment;</li>
 
<li>Applying light-handed regulation to facilitate investment in rural energy projects</li>
 
<li>Having differentiated tariffs for different areas or projects to reflect investment and supply costs;</li>
 
<li>Exploring schemes to assist consumers to purchase appliances, thereby increasing the speed at which the load of new consumers matures; and</li>
 
<li>Formulation of guidelines on organising rural communities to enable them access better provision of energy services</li>
 
</ol>
 
 
 
*Intensify provision of consumer information, education and technical advice in the use and conservation of energy.
 
 
 
*Work with financial institutions to establish sustainable financing mechanisms for energy programmes.
 
 
 
 
 
 
 
'''3. To improve energy governance and administration in order for the energy sector to operate efficiently and play its role in the socio-economic development of the country.'''
 
 
 
<u>To achieve the above objective government shall:</u>
 
 
 
*Clarify the roles and functions of the various institutions involved in the energy sector increasing the role of the private sector and other NGO’s and communities;
 
*Create a transparent legal and regulatory framework for the sector;
 
*build capacity at the national and local levels for better formulation and implementation of energy policies and programmes;
 
*Build the capacity of regulatory agencies to provide even handed and predictable regulation;
 
*Develop incentives to retain local human resource for the energy sector; and
 
*Involve all stakeholders in the formulation of new policies in the energy sector
 
 
 
 
 
 
 
'''4. To stimulate economic development by ensuring that energy plays a central role in the economic development of the country and in the region.'''
 
 
 
<u>To achieve the above objective government will adopt the following strategies:</u>
 
 
 
*Encourage competition within the energy markets to achieve efficiency.
 
*Attract investments in energy services provision by providing appropriate incentives.
 
*Ensure energy supply security and reliability.
 
*Promote energy trade within the region.
 
 
 
 
 
 
 
'''5. To manage energy-related environmental impacts'''
 
 
 
Government will ensure that environmental considerations are given priority by energy suppliers and users to protect the environment and put in place a monitoring mechanism to evaluate compliance with established environmental protection guidelines.
 
 
 
<u>To meet the above objective, Government shall:</u>
 
 
 
*Promote the use of alternative sources of energy and technologies which are environmentally friendly;
 
*Sensitise energy suppliers and users about the environmental issues associated with energy;
 
*Work towards the establishment and acceptance of broad targets for the reduction of energy-related emissions that are harmful to the environment and energy users;
 
*Promote efficient utilisation of energy resources; and strengthen the environment-monitoring unit in the energy sector
 
 
 
 
 
 
 
Energy is an integral part of the Ugandan Government’s '''Poverty Eradication Action Plan (PEAP)''' which includes frequent references to the<span style="font-family: monospace"></span>link between energy and poverty alleviation. The Ugandan Government has set the target of providing 10% of rural population with access to electricity until 2012. This target has been specified in the Rural Electrification Strategy and Plan as well as in the PEAP. It is planned to be achieved by grid extension (including through private sector involvement), mini-grids and stand-alone electrification systems. Furthermore, the government has stated its commitment to increase the use of renewable energy from 4% today to 61% in 2017 as outlined in the Renewable Energy Policy (March 2007).
 
 
 
In April 2010, the Government of Uganda launched the '''National Development Plan (NDP)''', which covers a number of energy issues. One of the objectives of this plan are increased access and consumption of electricity for growth, employment and socio-economic transformation. Limitations of the forestry sector and their impacts on the country's development are elaborated as well as challenges of the power sector. In consequence, the NDP highlights the following strategies to overcome the barriers of the energy sector towards achievement its goals: Increase power generation capacity to reach 780-820 MW, mainly through large and small hydro; increase rural electrification from 6&nbsp;% to 10&nbsp;% by, among others, subsidization of mini-grids; promotion of energy efficiency, reduction of power losses from 40&nbsp;% to 16&nbsp;%; revision of existing policies in the energy sector and promotion of renewable energies, esp. biomass and solar.&nbsp;
 
  
In addition to the technical and financial assistance from Germany Uganda’s energy sector is supported by the World Bank, Norway, ADB and to a lesser extent by Japan, Denmark and the European Community.
+
<u>The salient features of the Act are:</u><br/>a. Liberalizing the electricity industry;<br/>b. Disbanding of the Uganda Electricity Board (UEB) (historically a vertically integrated monopoly) into three entities namely generation, transmission and distribution;<br/>c. Establishment of Electricity Regulatory Authority (ERA) to regulate the sector;<br/>d. Establishment of the Rural Electrification Fund (REF), with the main objective of enhancing rural access to electricity; and<br/>e. Establishment of the Electricity Dispute Tribunal (EDT) that has jurisdiction to hear and determine electricity sector disputes which are referred to it.<br/><br/><br/>
  
The World Bank has provided loans for three major projects in the area of energy supply: the Energy for Rural Transformation (ERT) for USD 84 million (up to 2012); the Uganda Power Sector Development Project for USD 300 million (up to 2011) and the Private Power Generation Project (Bujagali) for USD 115 million (up to 2017). The main objective of the Private Power Generation project is to provide least-cost power generation capacity that will eliminate power shortages at the time of its commissioning. The Power Sector Development Operation Project is to reduce short-term power shortages and financial imbalances, and facilitate orderly longer-term expansion of electricity service. This also comprises a set of investments and policy measures designed to reduce the supply-demand gap until the Bujagali hydropower plant comes into service in 2011 as well as financial support for the Government to absorb a part of the higher oil prices.
+
=== The Energy Policy for Uganda, 2002 ===
  
 +
<u>The main policy goal is “to meet the energy needs of the Ugandan population for social and economic development, in an environmentally sustainable manner”. The broad policy objectives are:</u><br/>a. To establish the availability, potential and demand of the various energy resources in the country.<br/>b. To increase access to modern affordable and reliable energy services as a contribution to poverty eradication.<br/>c. To improve energy governance and administration.<br/>d. To stimulate economic development.<br/>e. To manage energy-related environmental impacts.<br/>f. To increase the role of private sector in the power sector operations and future development.<br/><br/>
  
 +
=== Renewable Energy Policy for Uganda, 2007 ===
  
= Institutional Set Up and Actors in the Energy Sector<br/> =
+
<u>The overall goal of the Renewable Energy Policy (REP) is to increase the use of modern renewable energy.<br/>The key policy objectives include:</u><br/>a. To maintain and improve the responsiveness of the legal and institutional framework to promote renewable energy investments;<br/>b. To establish an appropriate financing and fiscal policy framework for investments in renewable energy technologies;<br/>c. To promote research and development, international cooperation, technology transfer and adoption of standards in renewable energy technologies;<br/>d. To utilize biomass energy efficiently so as to contribute to the management of the resource in a sustainable manner;<br/>e. To promote the sustainable production and utilization of bio-fuels; and<br/>f. To promote the conversion of municipal and industrial waste to energy. Under the power generation programme, REP promotes power generation from mini-hydro power schemes, biomass, cogeneration, wind, solar, geothermal and peat. There are plans to consider nuclear power generation in the power mix in the long term.<br/><br/>
  
== Public Institutions<br/> ==
+
=== The Atomic Energy Act, 2008 ===
  
<u>There are three main governmental institutions dealing with renewable energies for power generation:</u>
+
<u>The Act provides for:</u><br/>a. Regulation of the peaceful applications of ionizing radiation;<br/>b. Establishment the Atomic Energy Council (AEC);<br/>c. Protection and safety of individuals, society and the environment from the dangers resulting from ionizing radiation;<br/>d. Production and use of radiation sources and the management of radioactive waste;<br/>e. A framework for the promotion and development of nuclear energy for use in power generation and other peaceful purposes;<br/>f. Compliance with international safety requirements for the use of ionizing radiation, radiation protection and security of radioactive sources;<br/>g. Repeal of the Atomic Energy Act, Cap. 143; and other related matters.<br/><br/>Energy is also an integral part of the Ugandan Government’s [http://www.unpei.org/sites/default/files/e_library_documents/UG-PEAP2005-2008.pdf Poverty Eradication Action Plan (PEAP)] which includes frequent references to the link between energy and poverty alleviation. The Ugandan Government has set the target of providing 10% of rural population with access to electricity until 2012. This target has been specified in the Rural Electrification Strategy and Plan as well as in the PEAP. It is planned to be achieved by grid extension (including through private sector involvement), mini-grids and stand-alone electrification systems. In April 2010, the Government of Uganda launched the [http://npa.ug/development-plans/ndp-201011-201415/ National Development Plan (NDP)], which covers a number of energy issues. One of the objectives of this plan is increased access and consumption of electricity for growth, employment and socio-economic transformation. Limitations of the forestry sector and their impacts on the country's development are elaborated on as well as challenges of the power sector. In consequence, the NDP highlights the following strategies to overcome the barriers of the energy sector towards achievement its goals: Increase power generation capacity to reach 780-820 MW, mainly through large and small hydro; increase rural electrification from 6% to 10% by, among others, subsidization of mini-grids; promotion of energy efficiency, reduction of power losses from 40% to 16%; revision of existing policies in the energy sector and promotion of renewable energies, esp. biomass and solar. A consultant supported the Ministry to work out '''The Energy Efficiency and Conservation Bill '''to promote efficient utilisation of energy in Uganda. Besides that several awareness raising campaigns are carried out.<br/>[[Uganda Energy Situation#toc|►Go To Top]]
  
*<span><span></span></span>The [http://www.energyandminerals.go.ug/ Ministry of Energy and Mineral Development (MEMD)] is the lead agency in the energy sector. The Ministry is responsible for policy formulation, promotion, coordination, monitoring and evaluation. MEMD is also responsible for initiating legislation in the energy sector. Ugandas National Energy Policy is so far centralized, i.e. there are no energy officers at sub-national/district level. Part of the MEMD is the Energy Department (ED), which is structured according to sectors. ED comprises four divisions “Energy Efficiency”, “Innovative and Renewable Energies”, “Electricity” and “Provision with Oil Products”.
+
=== Power Africa Uganda Electricity Supply Accelerator 2018 ===
*<span><span></span></span>[http://www.rea.or.ug/ Rural Electrification Agency (REA)] functions as the secretariat to the Rural Electrification Board, which realizes MEMD`s rural electrification plans as stipulated in the Indicative Rural Electrification Master Plan. REA&nbsp;controls public funds as for the subsidization of rural electrification projects.
 
*[http://www.era.or.ug/ Electricity Regulatory Authority] (ERA), which was established by the Electricity Act of 1999, is in charge to issue licences for the generation, transmission, distribution or sales of electricity. ERA has also the mandate to establish a tariff structure and investigate tariff charges and approve the rates of charges. A copy of the latest tarriffs can be found [http://www.era.or.ug/Pdf/Approved_Uganda%20REFIT%20Guidelines%20V4%20%282%29.pdf here].
 
  
 +
Power Africa announced the launch of the new Power Africa Uganda Electricity Supply Accelerator in 2018. This Accelerator will facilitate the addition of 1,000 megawatts of generation capacity and 1,000,000 new electricity connections in Uganda by 2020.<ref>https://www.newvision.co.ug/new_vision/news/1470667/us-uk-commit-sh40b-uganda-grid-energy-solutions</ref>
  
 +
= Institutional Set-up and Actors in the Energy Sector =
  
== Projects Implementing NGOs<br/> ==
+
== Public institutions ==
  
Energy is generally a side topic for most Ugandan NGOs. However, there are several NGOs with certain experiences in the field of the introduction of improved stoves.
+
There are three main governmental institutions dealing with renewable energies for power generation:
  
 +
*The [http://www.energyandminerals.go.ug/ Ministry of Energy and Mineral Development (MEMD)] is the lead agency in the energy sector. The Ministry is responsible for policy formulation, promotion, coordination, monitoring and evaluation. MEMD is also responsible for initiating legislation in the energy sector. Uganda’s National Energy Policy is so far centralized, i.e. there are no energy officers at sub-national/district level. Part of the MEMD is the Energy Department (ED), which is structured according to sectors. ED comprises four divisions “Energy Efficiency”, “Innovative and Renewable Energies”, “Electricity” and “Provision with Oil Products”.
 +
*[http://www.rea.or.ug/ Rural Electrification Agency (REA)] functions as the secretariat to the Rural Electrification Board, which realizes MEMD`s rural electrification plans as stipulated in the Indicative Rural Electrification Master Plan. REA controls public funds as for the subsidization of rural electrification projects.
 +
*[http://www.era.or.ug/ Electricity Regulatory Authority (ERA)], which was established by the Electricity Act of 1999, is in charge to issue licences for the generation, transmission, distribution or sales of electricity. ERA has also the mandate to establish a tariff structure and investigate tariff charges and approve the rates of charges.
  
 +
== Development partners ==
  
== Commercial Service Provider<br/> ==
+
Uganda has a large community of international development partners in the energy sector. Better co-ordination and management of international donor support to facilitate improved energy access and better value for money and the reduction of duplication would benefit Uganda significantly. Activities are coordinated through the ''Energy and Mineral Development Partners Group'' (EMDPG) which Germany has the lead in since November 2010. Following institutions and countries are represented in this working group: KfW, GIZ, USAID, DFID, EIB, EU-Commission, France, Ireland, IWF, AdDB, JICA, Norway and World Bank. Furthermore these institutions are supporting the Ugandan energy sector: NORAD, IAEA, USTDA, IDB, UNDP, UNIDO, NDF and SIDA.
  
In the field of photovoltaic systems about 25 providers work in Uganda. The Solar companies in general have difficulties to develop markets in rural areas and focus their interest on urban areas.
+
== Current Projects ==
  
In the field of stoves there are numerous workshops and craftsmen producing stoves especially for the urban market. Part of these workshops and craftsmen were trained by the EnDev-Uganda programme.
+
Energy is generally a side topic for most Ugandan NGOs. However, a lot of projects involve renewable energies as they have a sustainable character and there are several NGOs with certain experiences in the field of the introduction of improved stoves, solar systems and solar lamps.
  
 +
Current projects include:
  
 +
* Captive power plants in the dairy industry: implemented by [https://equatorsolargroup.com/ Equator Solar], supported by the German Energy Agency - [http://www.german-energy-solutions.de/en dena, the German Energy Solutions Initiative], and the dena Renewable Energy Soultions Programme (dena RES Programme).
 +
* Energy efficiency assesments in productive industries, implemented by [https://equatorsolargroup.com/ Equator Solar], in partnership with Renergy Consulting GmbH, supported by Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ)
  
== Non governmental service providers for rural areas in the field of energy<br/> ==
+
== Commercial service provider ==
  
*...
+
By 2010, in the field of photovoltaic systems over 30 providers operated in Uganda. The Solar companies in general have difficulties to develop markets in rural areas and focus their interest on urban areas.<ref>REA - Rural electrification strategy and plan 2013-2022 http://rea.or.ug/phocadownload/rural%20electrification%20strategy%20and%20plan%202013-2022.pdf page 9</ref> In the field of stoves there are numerous artisans and private-business companies producing improved cook stoves especially for the urban market. Some of these artisans and private-business companies were trained and supported by the EnDev-Uganda programme.
  
 +
[[Uganda Energy Situation#toc|►Go To Top]]
  
 +
= Key Problems Hampering Access to Modern Energy Services in Rural Areas =
  
= Key Problems Hampering Access to Modern Energy Services in Rural Areas<br/> =
+
== Obstacles for Grid Based Rural Electrification ==
  
== Obstacles for Grid Based Rural Electrification<br/> ==
+
The Government of Uganda has limited resources for extending the grid to rural areas. At the moment, the Government’s focus is on solving the power supply crisis that is crippling the national economy. Based on an improved power generation it will concentrate its efforts to extend the grid to major urban and peri-urban areas. Tariff rates for customers differ according to the category of client. They reflect the cost of electricity supply to that category. Implementation of this principle eliminates cross-subsidization of any category of customers by other categories. As a result, the tariff for domestic consumers is relatively high with 0,15 €/0,19 USD per kWh (UGX 518.7 – Umeme Q4,2014).<ref>ERA - http://www.era.or.ug/index.php/statistics-tariffs/tariffs/distribution-tariffs/2014-10-14-10-24-55 </ref> This tariff is often higher than the tariff for industrial consumers because domestic consumers who take supply at the low voltage impose higher investment and operational costs on the system than industrial consumers who are supplied at the high voltage or medium voltage. For Umeme ltd. it is generally profitable to extend the grid. However, poor households cannot afford the connection fee and the electricity costs. In addition, collection costs are high in areas with dispersed population and low numbers of clients. Prepaid meters are more and more common in Uganda. By the end of August 2013, Umeme had installed 33,985 prepayment meters.<ref>Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19, page 33</ref> Beside Uneme, private companies invest in minigrids only in exceptional cases. Normally, costs of providing access are too high due to remoteness of the sites, dispersed populations and difficulty of the terrain. Local communities don’t dispose of sufficient proper financial resources to make infrastructure investments in their community.
  
The Government of Uganda has limited resources for extending the grid to rural areas. &nbsp;At the moment, the Government’s focus is on solving the power supply crisis that is crippling the national economy. Based on an improved power generation it will concentrate its efforts to extend the grid to major urban and periurban areas.
+
[[Uganda Energy Situation#toc|►Go To Top]]
  
Tariff rates for customers differ according to the category of client. They reflect the cost of electricity supply to that category. Implementation of this principle eliminates cross-subsidization of any category of customers by other categories. As a result, the tariff for domestic consumers is relatively high with 0,17 € per kWh (426 U. Shs). This tariff is often higher than the tariff for industrial consumers because domestic consumers who take supply at the low voltage impose higher investment and operational costs on the system than industrial consumers who are supplied at the high voltage or medium voltage.
+
== Obstacles for Off Grid Energy Technologies and Services ==
  
For Umeme ltd. it is generally profitable to extend the grid. However, poor households cannot afford the connection fee and the electricity costs. In addition, collection costs are high in areas with dispersed population and low numbers of clients. Prepaid meters are not common in Uganda.
+
There is strong political motivation to improve access to electricity of rural populations, particularly those remote from the grid. However, in the case of SHS both the affordability and the availability were seen as major problems for the dissemination of the solar systems in rural areas. In the case of hydropower, the investment costs are generally not affordable for rural communities and investors. In addition, there is a lack of management skills to operate MHPPs. Generally, the availability of micro-finance schemes for energy technologies in rural areas is limited. If accessible, the costs for such financing are very high (typically at rates as high as 25% per month). Large parts of the country have almost no access to institutional micro-finance services and must rely largely on moneylenders, suppliers, family and friends for short -term seasonal loans. There are no secure liquid savings options available to these households, which would enable them to build assets over time. Existing micro-finance institutions often have a narrow credit product line, limited experience in rural markets and a lack of access to best practice information and technical tools. In addition marketing and maintenance structure for energy technology devices in rural areas are weak. Almost all retailers are established in the big cities with no outlets in rural communities. Thus, clients have to travel to cities to purchase energy devices and for repair orders, which is difficult for most rural families. Establishing rural outlets is not considered to be profitable due to the high costs for transportation and mobilization, the dispersed nature of the populations and the low income and low demand of the local population.<br/>[[Uganda Energy Situation#toc|►Go To Top]]
  
Beside Uneme, private companies invest only in exceptional cases in minigrids. Normally, costs of providing access are too high due to remoteness of the sites, dispersed populations and difficulty of the terrain. Local communities don’t dispose of sufficient proper financial resources to make infrastructure investments in their community.
+
== Impacts of electrification (2011-2019) ==
  
 +
This article presents the results of a six-year monitoring exercise to track impacts of rural electrification in the West Nile sub-region of Uganda. [[Impacts_of_Rural_Electrification_in_Uganda_2011-2019|Impacts of Rural Electrification in Uganda 2011-2019]]
  
 +
= Further Information<br/> =
  
== Obstacles for Off Grid Energy Technologies and Services<br/> ==
+
*Centre for Research in Energy and Energy Conservation, CREEC ([http://creec.or.ug www.creec.or.ug]).
 
+
*Ministry of Energy and Mineral Development 2002, [http://rea.or.ug/index.php/policies-and-legislation?download=41:the-energy-policy-for-uganda The Energy Policy for Uganda]
There is strong political motivation to improve access to electricity of rural populations, particularly those remote from the grid. However, in the case of SHS both the affordability and the availability were seen as major problems for the dissemination of the solar systems in rural areas. In the case of hydropower, the investment costs are generally not affordable for rural communities and investors. In addition, there is a lack of management skills to operate [[How_to_Plan_a_MHPP_in_brief|MHPPs]].
+
*Ministry of Energy and Mineral Development 2012, [http://rea.or.ug/phocadownload/rural electrification strategy and plan 2013-2022.pdf Rural Electrification Strategy and Plan 2013 - 2022]
 
+
*Ministry of Energy and Mineral Development 2007, The Renewable Energy Policy for Uganda
Generally, the availability of micro-finance schemes for energy technologies in rural areas is limited. Large parts of the country have almost no access to institutional micro-finance services and must rely largely on moneylenders, suppliers, family and friends for short term seasonal loans. There are no secure liquid savings options available to these households, which would enable them to build assets over time. Existing micro-finance institutions often have a narrow credit product line, limited experience in rural markets and a lack of access to best practice information and technical tools. In addition marketing and maintenance structure for energy technology devices in rural areas are weak. Almost all retailers are established in the big cities with no outlets in rural communities. Thus, clients have to travel to cities to purchase energy devices and for repair orders, which is difficult for most rural families. Establish rural outlets are considered not to be profitable due to the high costs for transportation and mobilization, the dispersed nature of the populations and the low income and low demand of the local population.
+
*Ministry of Water, Lands and Environment 2013, [http://www.mwe.go.ug/ The National Forest Plan 2011/12 – 2021/22]
 
+
*National Planning Authority 2010, [http://npa.ug/wp-content/themes/npatheme/documents/NDP2.pdf National Development Plan 2010/11 – 2014/15]
 
+
*Kamfor Company Ltd 2006, Report on the Renewable Energy Resource Information Development and Capacity Building Assessment In Uganda, Ministry of Energy and Mineral Development, Kampala, January 2007
 
+
*Kennedy & Donkin Power Limited 1996, The UEB Hydropower Development Master Plan – Part 1, Volume 2 Main Report, Kampala November 1997
= Links to Further Reading<br/> =
+
*Kennedy & Donkin Power Limited 1996, The UEB Hydropower Development Master Plan – part 1, Volume 7, Hydrology and Hydropower Potential of Non-Nile Rivers, July 1996
 
+
*Sweco International 2001, Evaluation of Hydropower Potential Sites in Uganda with Capacity in Range of 0.5 – 50 MW, Kampala, March 2001
*Centre for Research in Energy and Energy Conservation (n.d.). [[:file:Northern Uganda Energy study report 2011-04-05.pdf|Northern Uganda Energy Situation]].
+
*Electrowatt-Ekono Oy – Norplan AS, COWI A/S 2003. The Uganda Alternative Energy Resources Assessment and Utilisation Study, Kampala, June 2003
*Ministry of Energy and Mineral Development 2002, The Energy Policy for Uganda, Kampala, September 2002
 
*Ministry of Energy and Mineral Development 2001, Rural Electrification Strategy and Plan.
 
*Kamfor Company Ltd 2006, Report on the Renewable Energy Resource Information Development and Capacity Building Assessment In Uganda, Ministry of Energy and Mineral Development, Kampala, January 2007.
 
*Ministry of Water, Lands and Environment 2002, [http://www.nfa.org.ug/docs/national_forest_plan.pdf The National Forest Plan], October 2002
 
*Kennedy & Donkin Power Limited 1996, The UEB Hydropower Development Master Plan – Part 1, Volume 2 Main Report, Kampala November 1997.
 
*Kennedy & Donkin Power Limited 1996, The UEB Hydropower Development Master Plan – part 1, Volume 7, Hydrology and Hydropower Potential of Non-Nile Rivers, July 1996&nbsp; .
 
*Sweco International 2001, Evaluation of Hydropower Potential Sites in Uganda with Capacity in Range of 0.5 – 50 MW, Kampala, March 2001.
 
*Electrowatt-Ekono Oy – Norplan AS, COWI A/S 2003. The Uganda Alternative Energy Resources Assessment and Utilisation Study, Kampala, June 2003.
 
 
*Electrowatt-Ekono Oy, NORPLAN A.S and COWI A/S (2004): The Uganda Alternative Energy Resources Assessment and Utilization Study AERDP Main Report Phase 1, Kampala, February 2004
 
*Electrowatt-Ekono Oy, NORPLAN A.S and COWI A/S (2004): The Uganda Alternative Energy Resources Assessment and Utilization Study AERDP Main Report Phase 1, Kampala, February 2004
 
*Ministry of Energy and Mineral Development 2006, Plan for Meeting Uganda’s Electricity Supply Needs In The Short, Medium And Long Term, Kampala June 2006.
 
*Ministry of Energy and Mineral Development 2006, Plan for Meeting Uganda’s Electricity Supply Needs In The Short, Medium And Long Term, Kampala June 2006.
*United Nations Development Programme (1998), Uganda Photovoltaic Pilot Project for Rural Electrification, Project Document, Kampala 1998.
+
*United Nations Development Programme (1998), Uganda Photovoltaic Pilot Project for Rural Electrification, Project Document, Kampala 1998
*B. Banks and G. Kihuguru (2006), Uganda Photovoltaic Pilot Project for Rural Electrification UGA/97/G32 Ex-Post Evaluation Report, UNDP, Kampala, May 2006.
+
*B. Banks and G. Kihuguru (2006), Uganda Photovoltaic Pilot Project for Rural Electrification UGA/97/G32 Ex-Post Evaluation Report, UNDP, Kampala, May 2006
*Pallabazzer, R.: The Wind resources in Uganda. Renewable Energy, Vol 13, no 1, pp 41-49, 1998.
+
*Pallabazzer, R.: The Wind resources in Uganda. Renewable Energy, Vol 13, no 1, pp 41-49, 1998
 
+
*[https://shellfoundation.org/app/uploads/2018/10/2018-UOMA-Market-Map.pdf Mapping the Ugandan off-grid energy market]
 
+
*[[Uganda_-_Information_Sources|Uganda - Information Sources]]
 
+
*[https://www.get-invest.eu/market-information/uganda/useful-links/ Get.invest's Market Insights Package for Uganda]
= References<br/> =
+
*USAID Power Africa: [https://www.usaid.gov/sites/default/files/documents/1860/Uganda_-_November_2018_Country_Fact_Sheet.pdf Uganda Factsheet]
 
+
*[[Impacts of Rural Electrification in Uganda 2011-2019|Impacts of Rural Electrification in Uganda 2011-2019]]
[https://energypedia.info/index.php/Sources_-_Uganda '''Sources page''']
+
*Case study: "[[:File:Analysis of Quality Infrastructure Services Offered in Uganda and Potential for Development.pdf|Analysis of Quality Infrastructure offered in Uganda and Potential for Development]]" with insights into quality assurance for renewable energies in the context of climate change mitigation and adaptation; as part of the publication "[[:File:Quality Infrastructure for Climate Change Mitigation and Adaptation in Sub-Saharan Africa.pdf|Quality Infrastructure for Climate Change Mitigation and Adaptation to Climate Change: Potentials, Opportunities and Chances in Sub-Saharan Africa.]]" PTB, 2019
 +
*Solar-powered Irrigation in Uganda
 +
**[[Publication - Technical Planning & Design Manual for Solar-Powered Irrigated Horticulture in Uganda Part I]]
 +
**[[Publication - Technical Planning & Design Manual for Solar-Powered Irrigated Horticulture in Uganda Part III]]
 +
**[[Publication - Technical Planning & Design Manual for Solar-Powered Irrigated Horticulture in Uganda Part III]]
 +
**[[Publication - Technical Planning & Design Manual for Solar-Powered Irrigated Horticulture in Uganda Part IV]]
 +
**[[Publication - Technical Planning & Design Manual for Solar-Powered Irrigated Horticulture in Uganda Part V]]
 +
**[[Publication - Practical Operation & Maintenance Manual for Users of Solar- Powered Irrigated Horticulture in Uganda|Practical Operation & Maintenance Manual for Users of Solar- Powered Irrigated Horticulture in Uganda]]
 +
<br />[[Uganda Energy Situation#toc|►Go To Top]]<br />
 +
= References =
  
 
<references />
 
<references />
  
<br/>
+
<br/>[[Uganda Energy Situation#toc|►Go To Top]]
 
 
[[Category:Country Situation|Country_Situation]] <br/>
 
 
 
[[Category:Uganda]]
 

Latest revision as of 13:37, 2 August 2023


Uganda
Flag of Uganda.png
Location _______.png

Capital:

Kampala

Region:

Coordinates:

1.0667° N, 31.8833° E

Total Area (km²): It includes a country's total area, including areas under inland bodies of water and some coastal waterways.

241,550

Population: It is based on the de facto definition of population, which counts all residents regardless of legal status or citizenship--except for refugees not permanently settled in the country of asylum, who are generally considered part of the population of their country of origin.

48,582,334 (2023)

Rural Population (% of total population): It refers to people living in rural areas as defined by national statistical offices. It is calculated as the difference between total population and urban population.

73 (2023)

GDP (current US$): It is the sum of gross value added by all resident producers in the economy plus any product taxes and minus any subsidies not included in the value of the products. It is calculated without making deductions for depreciation of fabricated assets or for depletion and degradation of natural resources.

49,272,882,214 (2023)

GDP Per Capita (current US$): It is gross domestic product divided by midyear population

1,014.21 (2023)

Access to Electricity (% of population): It is the percentage of population with access to electricity.

47.10 (2022)

Energy Imports Net (% of energy use): It is estimated as energy use less production, both measured in oil equivalents. A negative value indicates that the country is a net exporter. Energy use refers to use of primary energy before transformation to other end-use fuels, which is equal to indigenous production plus imports and stock changes, minus exports and fuels supplied to ships and aircraft engaged in international transport.

no data

Fossil Fuel Energy Consumption (% of total): It comprises coal, oil, petroleum, and natural gas products.

no data

Source: World Bank



Energy situation

Uganda has a total primary energy consumption of 0.0593 quadrillion Btu which equals 14.94 Mio. tons of oil equivalent (2012).[1] Biomass is still the most important source of energy for the majority of the Ugandan population. About 90% of the total primary energy consumption is generated through biomass, which can be separated in firewood (78.6%), charcoal (5.6%) and crop residues (4.7%). Electricity is contributing only 1.4% to the national energy balance while oil products, which are mainly used for vehicles and thermal power plants, account for the remaining 9.7%.[2] Concerning electricity generation, Uganda has an installed capacity of 822 MW, mostly consisting of hydropower (692 MW; 84%). Access to electricity in 2013 at national level in Uganda is very low with 15% (1991: 5.6%; 2006: 9%; 2010: 10%) but only 7% in rural areas. [3] Uganda currently has one of the lowest per capita electricity consumption in the world with 215 kWh per capita per year (Sub-Saharan Africa’s average: 552 kWh per capita, World average: 2,975 per capita).[4] Uganda politically and economically reformed its energy sector including a new legal and regulatory framework based on which the previously vertically integrated monopoly, Uganda Electricity Board, was unbundled leading to public private partnerships. The Government provides an enabling environment for private sector investments in generation and distribution of electricity while transmission above 33kV remains a public function through the Uganda Electricity Transmission Company Ltd (UETCL). The Electricity Regulatory Authority (ERA) was established to license and regulate operations of all electricity operators, and the Rural Electrification Agency (REA) was put in place to ensure that rural electrification, which in most cases is not commercially viable, is accelerated to achieve set targets.[5] The energy sector is one of the key sectors of the Ugandan economy. The sector provides a major contribution to the treasury resources from fuel taxes, VAT on electricity, levy on transmission bulk purchases of electricity, license fees and royalties and foreign exchange earnings from power exports. Significant public investment has injected into the sector, particularly in the area of electricity supply. Following liberalisation, the power sub-sector is now attracting the largest private sector investments in the country. The sector is not only a vital input into other sectors, but also major source of employment.

Energy demand

Mainly resulting from a prominent GDP growth of around 6% during the past two decades (2010: 6.2%; 2011: 5.0%; 2012: 4.7%; 2013:6.5%)[6], electricity demand has been growing at an average of 10% per annum.[7] In the past years this lead to occasional load shedding since the supply did not increase proportionally.
The following table shows the energy and electricity demand of the main consuming sectors according to Uganda Energy Balance 2012 of the Ministry of Energy & Mineral Development (MEMD).[8]

Sector

Energy Demand

Electricity Demand

Residential

67.09%

24.24%

Commercial

13.35%

11.16%

Industrial

11.86%

64.60%

Transport

7.25%

0.00%

Agriculture

0,45%

0.00%

Total

100%

100%

Energy supply

In 2012, Uganda had to import energy in the amount of 1,187,672 TOE (different petroleum products) while the amount of exports (only electricity) amounted to 8,514 TOE.[9] Uganda’s main source of energy is biomass. Regarding electrical power generation, hydropower accounts for about 84% of the total installed capacity of 822 MW. The actual total electricity capacity is 550 MW and the country’s peak demand is about 489 MW. According to the NDP the peak power demand is rising about 22.7% per annum.[10] The following table shows Uganda‘s most important power stations.[11]

Plant/Source

Capacity (MW)

Kiira (Large Hydro Power Station)

200

Nalubaale (Large Hydro Power Station)

180

Bujagali (Large Hydro Power Station)

250

Jacobsen Namanve (Thermal Power Plant)

50

Electro-Maxx-Tororo (Thermal Power Plant)

50

Kakira Sugar Works Ltd (Cogeneration)

22

Kinyara sugar Works (Cogeneration)

7.5

Kilembe Mines Ltd (Small Hydro)

5

Tronder Power Bugoye (Small Hydro)

13

Eco Power Ishasha (Small Hydro)

6.5

Africa EMS Mpanga (Small Hydro)

18

Hydromax Buseruka

9

Kasese Cobalt Company Ltd

10.5

►Go To Top

Problem Situation

Wood fuels are largely used for cooking in rural areas while charcoal mostly provides for the cooking needs of the urban population. High demand for wood fuels used inefficiently results in overuse and depletion of forests.. In 2012, 14.1% of Uganda’s land area was covered with forest.[12] The land available is becoming scarce and households prefer to use the land for food crops rather than planting trees. Since 1990 the forested area decreased from 49,240 km² down to 29,880 km². This means that from 1990 until 2010 more than 19,360 km², equaling 39 % of the existing forest disappeared. Currently about 90,000 hectares (equals 900 km²) of forest cover are lost annually, which leads to fuel wood scarcity in rural areas and increasing price levels of charcoal and fuel wood. Between 2005 and 2008 the charcoal price rose at an enormous nominal rate of 14% per year.[13] In addition, illegal cutting of trees increases. The production of charcoal is carried out under primitive conditions with an extremely low efficiency at 10 to 12% on weight-out to weigh-in basis and an efficiency rate on calorific value basis at 22%.[14] At the same time, households use biomass in a very inefficient way as the three-stone fire is still widely spread. Urban and rural households are facing increasing energy costs or spend more time collecting firewood. Furthermore, the traditional use of firewood is responsible for high indoor air pollution levels, thus causing respiratory diseases that affect women and children in particular. Moreover, the latter spend many hours and travel long distances to collect fuel wood. This deprives women of valuable time to engage in income generating activities and children to go to school and study. A total of 93% of rural households without access to electricity are currently using traditional lighting technologies such as candles or kerosene lamps that give poor quality lighting, emit noxious fumes and present hazards in terms of fires or burns (in particular for small children). Furthermore, the majority of social institutions (e.g. schools and health centres) in rural areas do not have access to electricity, which leads to inferior health and education services in comparison to electrified institutions. Lack of access to electricity also severely constrains the economic development of rural areas of Uganda, preventing the establishment of businesses that require electric power or forcing companies to buy diesel or petrol generators that are costly to operate and negatively impact the environment. Furthermore, job creation is being seriously constrained by the lack of adequate investment in the provision of rural infrastructure services, of which electricity is a key component. Lack of electricity also prevents access to information and communication technologies (e.g. mobile phones, computers, internet). This contributes to further isolation of rural areas from the rest of the country. Further, the quality of rural life is hampered by lack of electricity, particularly as rural public institutions such as health, educational and water facilities would be able to provide better services if they had access to electricity.
►Go To Top

Energy resources

Uganda is richly endowed with abundant energy resources, which are fairly distributed throughout the country. These include hydropower, biomass, solar, geothermal, peat and fossil fuels. The energy resource potential of the country includes an estimated 2,000 MW of hydro power, 450 MW of geothermal, 1,650 MW of biomass cogeneration, 460 million tons of biomass standing stock with a sustainable annual yield of 50 million tons, an average of 5.1 kWh/m2 of solar energy, and about 250 Mtoe of peat (800 MW). In addition, petroleum in an estimated amount of 6.5 billion barrels, of which 1.4 billion barrels are recoverable, has been discovered in the western part of the country. The overall renewable energy power generation potential is estimated to be 5,300 MW.[15]

Biomass

Biomass is the predominant type of energy used in Uganda, accounting for 94% of the total energy consumption in the country.[16] Charcoal is mainly used in the urban areas while firewood, agro-residues and wood wastes are widely used in the rural areas. Firewood is used mainly on three-stone fires in rural households and in food preparation by commercial vendors in urban areas. Only about 10% of all households use efficient stoves.[17] The same applies to the burning of farm residues. Firewood in some institutions like schools and hospitals is however used on improved stoves. Charcoal is mainly used on a metallic stove traditionally known as a ‘sigiri’ though the use of the clay sigiri is picking up. For the conversion of firewood into charcoal, earth mounds and pits are used as charcoal kilns. These have a wood conversion efficiency of 10 to 12% on weight-out to weight-in basis. This implies that about 9 kg of wood are needed to produce 1 kg of charcoal, which translates into 22% efficiency on an energy output to energy input basis. Introducing improved technologies may increase efficiency to achieve 3 to 4 kg of wood per kg of charcoal, which corresponds to 60% to 50% efficiency respectively on an energy basis.[18] Efforts to train charcoal burners have mainly been unsuccessful as most of them do it on an individual basis. Like in most African countries, research, development and dissemination of efficient and modern biomass technologies are not yet at the desired level.

Biomass potential and distribution

Various sources supply biomass, among them the different vegetation and land use types. The major sources are hardwood plantations, which consist of eucalyptus (50%), pine trees (33%) and cypresses (17%).[19] The total standing biomass stock is stated with 284.1 million tons [20] with a potential sustainable biomass supply of 45 million tons. However, accessible sustainable wood biomass supply stands at 26 million tons.[21] This amount meets 59% of the total demand of 44 million tons per year. The theoretical potential production of agriculture residues is between 1,186,000 and 1,203,000 tons annually.[22] The only business that utilizes biomass residues for electricity production is the sugar industry in a cogeneration process. A small amount of coffee and rice husks is also utilized for heat production in cement and tiles manufacturing. Another small amount is used for the production of carbonized and non-carbonized briquettes. Most of the biomass is used for cooking while a small share is either used as a fertilizer and/or animal fodder. The wood biomass demand and supply scenario projects that in the next ten years, the country will move from a surplus to a deficit and later to an acute deficit. By year 2011, the deficit is estimated to be 10.7 million tons.

Biomass stoves: Best practice case study

Against the background of high deforestation rates and firewood scarcity in Uganda, the Ministry of Energy and Mineral Development, with the support of the German Agency for International Cooperation (GIZ) through the Energy Advisory Project (EAP), partnered with NGOs and the private sector to promote the improved Rocket Lorena Stoves for households and institutions. The rocket stoves for households have been modified to fit the socio-economic setting of the poor by using locally available materials that can be obtained cheaply or at no cost. More information on the strategy, which has been successfully used to disseminate over 175,000 Rocket Lorena stoves in Bushenyi and Rakai districts in Uganda since 2005.

Hydropower

The electricity supply system in Uganda was developed during the 1950s and 1960s with the construction of the Owen Falls Hydropower Station (later renamed Nalubale Power Station) with 10 generators with a total installed capacity of 150 MW. Later the power station was refurbished and upgraded to 180 MW and a new power station, Kiira, was constructed with a capacity of 200 MW. With the liberalization of the economy and the unbundling of the electricity utility, both Nalubale and Kiira hydro power stations were leased to Eskom (U) Ltd under a 20-year concession agreement. The two hydropower stations form the back bone of the electricity supply network in the country. The private companies Kilembe Mines Ltd, Tronder Power and Kasese Cobalt Co. Ltd have their own smaller hydropower plants Mubuku I with 5.4 MW, Mobuku II with 14 MW and Mobuku III with 10.5 MW. The stations were initially built to supply their own industrial activity, but due to the interruption in the copper and cobalt production activities, the companies entered into a contract with the UETCL in 2003 to sell power to the grid. Other power stations are the Kanungu Power Station of Eco Power with 6.4 MW, and Mpanga Power Station of Africa Energy Management Systems with 18 MW. Three other small hydro power stations Kuluva (120 kW), Kagando (60 kW) and Kisiizi
(300 kW) supply electricity to isolated hospital grids. The German Agency for International Cooperation (GIZ) set up small hydro power plants in Bwindi (64 kW) and Suam (40 kW). The country is facing occasional electricity supply shortages. Uganda’s total installed capacity is 822 MW, generated primarily from Owen Falls Hydropower Station at Jinja in the South-Eastern part of Uganda (see Wikipedia "List of power stations in Uganda"). However, during droughts (like in 2009), only around half of the installed capacity could be used as a result of the low water level of Lake Victoria. Contributing to electricity supply problems is the fact that growth in demand for electricity has not been matched with new generation capacity. To alleviate this problem, the government has procured emergency thermal generators. A new hydro facility has been developed at Bujagali, and is operational since February 2012. The installation capacity is 250 MW. Before Bujagali became operational, 150 MW thermal capacities had been added in order to bridge the gap until the beginning of 2012. All big power generation plants belong to the Ugandan Electricity Generation Company Limited (UEGCL) but are operated and managed by ESKOM, Aggreko and other companies. (Two dams in Uganda are equipped with desilting gates and have proper plans for the management of upstream water and land use issues. However, there are no national plans for optimised operation of power plants under variable flow regimes).

Hydro potential and distribution

A Hydropower Development Master Plan has been developed with support from the Japan International Cooperation Agency (JICA). Uganda has considerable hydro resource potential estimated to be over 2,000 MW. The large-scale hydropower potential is along the White Nile, which originates in Lake Victoria. The flow of the White Nile River is controlled by the Owen Falls Dam. The water is released according to an “agreed curve” which is a relationship of the lake level and the flow representing the natural flow rate at Ripon Falls prior to the construction of the dam. In the long term, three large hydro power stations will be constructed. The Isimba Power Station with a capacity of 183.2 MW and expected to be operational in 2018. The Karuma Power Station with 600 MW installed capacity and expected to be operational in 2018. And the Ayago Power Station with a size of 600 MW and expected expected to be operational in 2023. The small and mini hydro sites are mainly located in the Eastern and the Western parts of the country which are hilly and mountainous. A total of 59 mini hydropower sites with a potential of about 210 MW have been identified through different studies. This gives a fair picture of the small and mini hydro potential in the country. Some of the sites can be developed for isolated grids and others as energy supply to the grid.

Solar energy

The level of solar energy utilization in Uganda is still very low. The use of solar PV began in the early 1980s mainly driven by donor-funded programmes for lighting and vaccine refrigeration in health centers. Later the Uganda Railways Cooperation, a government parastatal, installed 35kW at 29 locations for communications and signaling. The Uganda Post and Telecommunications Cooperation also installed 30kW at 35 remote telecommunication sites through out the country. Some of the earlier initiatives included:

  • PV systems installed by Uganda Rural Development and Training in Kagadi through a credit scheme supported by a Dutch organization Humanist Institute for Development Cooperation (HIVOS).
  • Habitat for Humanity and Solar Electric Light Fund funded by the US Department of Energy installed 125 solar home systems for low-income families in Kasese.
  • Solar Energy Uganda Ltd in partnership with Solar Light Churches for Africa installed a number of PV systems. However, the efforts were uncoordinated and lacked after-sales support.

In 2001, the Government launched the Rural Electrification Strategy and Plan (RESP) for the years of 2001 to 2010. It expired in 2012 due to delayed implementation. Among other, the RESP was supposed to increase the use of solar PV in rural areas. Unfortunately the RESP for 2001-2010 did not meet expectations. The plan anticipated rural electricity access to grow from the then-estimated 1% percent in rural population access to 10%. However the actual result was an increase of rural access by less than 5% percent. Also the RESP had a target of 80,000 PV systems by 2012 but in the end only 7,000 systems were installed.[23] Following this, the electrification strategy and plan 2013-2022.pdf Rural Electrification Strategy and Plan 2013 – 2022 was published. As part of the rural electrification program, Energy for Rural Transformation (ERT I), supported by the World Bank, is implementing PVTMA, a sales-based performance subsidy scheme that also provides business development support to private PV dealers, which is expected to increase PV sales. Under the same programme, the Ministries of Health, Education, and Water and the Uganda Communication Commission have procured PV systems to meet their sectors' electricity needs. The Ministry of Health planned for 568 PV systems for health centers under ERT Phase I. Finally 79 Solar DC vaccine fridges were supplied to Health Centers (HC); 261 staff houses received stand alone solar PV energy packages for lighting and operation of radio and TV/VCR; and 220 medical buildings received 17 stand alone solar PV energy packages. The Ministry of Education planned for 458 solar systems for 129 post-primary institutions in 10 districts. By the end of the ERT I, 94 of the 129 institutions had been electrified. After ERT I, the second Energy for Rural Transformation (ERT II) project was initiated. Its focus is to increase access to energy and Information and Communication Technology (ICTs) in rural Uganda. There are three components to the project, which are: rural energy infrastructure, the ICT and energy development in terms of cross sectoral links and impact monitoring. The project is running from 6th of April 2009 until 30th June 2016 and will cost about 105 million USD.[24] One part of the ERT II was the supply, installation, commissioning and maintenance of PV packages for 310 primary education institutions.[25]

Solar potential and distribution

The average solar radiation is 5.1 kWh/m2/day. Existing solar data clearly indicate that the solar energy resource in Uganda is high throughout the year. The data indicate a yearly variation (max month / min month) of only about maximum 20% (from 4.5 to 5.5 W/m2), which is due to the location near the equator. The insolation is highest in the dryer area in the north-east and very low in the mountains in the east and south-west.

Photovoltaik: Best practice case study

Against the background of low electrification rates, particulalry in rural areas, the Uganda Ministry of Energy and Mineral Development with financial support from UNDP and GEF implemented the Uganda Photovoltaic Pilot Project for Rural Electrification (1998-2003). The main objective of the project was to provide basic electrical services through solar PV to rural areas unlikely to have access to grid-based electricity in the foreseeable future.

Solar power in refugee camps

Uganda hosts one of the largest refugee settlement camps (Bidi Bidi) in the world. So, the 2018 Smart Communities Coalition Off-Grid Energy Challenge invited businesses to submit their proposal for providing clean off-grid energy in these refugee camps. Four Ugandan companies, namely Solar Today, Power Trust Uganda Limited, Aga Great Work Limited, and Raising Gabdho Foundation, each won a grant worth USD 100,000. Solar today will provide remote-controlled solar systems for business in Rwamwanja refugee camps. They will offer a 10% discount to these businesses and do not require an upfront cost. Power Trust Uganda Limited will set up stand-alone business hubs in Kiryandongo refugee camps. Aga Great Work Limited will set up a solar-powered mini-grid in Bidi Bidi refugee camps to provide electricity and promote productive end use activities in the settlement camps as well as the host communities. Raising Gabdho Foundation will provide clean cooking solutions in Bidi Bidi refugee camps. [26]

Self-consumption solar plant at a dairy farm in Uganda - case study

This case study portrays the first self-consumption solar plant at a dairy farm in Uganda, which is a new and innovative solar energy concept in the country, implemented by Equator Solar. As a result, many manufacturers and industries can now produce their own inexpensive energy with captive power plants.

The advantages of this concept can be outlined as follows:

  • Increasingly Popular: Captive power plants are becoming increasingly popular among industrial complexes who require constant energy to power their operations. Captive power plants can be in schools, hotels, offices & industrial companies.
  • Produce and Consume Your Own Energy: Energy production and consumption occur together at the source. Hundred percent of the power generated is utilised by the owner/producer of the plant.
  • Grid connected: Although the location where a captive power plant is deployed may be grid-connected, the electricity generated is not sent to the national grid.
  • Save Money: An own energy plant will always be cheaper than a grid energy supplier.
  • Finance Schemes Available: A captive plant can be fully financed by the user of the electricity, the developers of the project or a third party financier.

Read more here.

Solar Power for Saving Lives in Uganda - case study

The St. Francis Naggalama Hospital in Naggalama, Uganda acquired a solar back-up system from Equator Solar in order to ensure power supply during power outages and save lives. The installations of a 22 kWp solar PV system initiated on 24th September, 2021. This is the second solar PV system installed at the Hospital by Equator Solar following the initial 12 kWp solar system that was commissioned in 2019.

The new system is integrated with 21 kWh supercapacitor-based batteries that are to act as an emergency power back-up in case of any power outages at the hospital.

The back-up system, is significant towards ensuring an uninterrupted power supply for the hospital especially in scenarios where a stable electricity supply is required, that is; during operations and powering of life saving devices.

Read more here.

28 kWp Solar PV Solution for Hotel in Uganda - case study

A hotel in Uganda acquired a 28 kWp solar system from Equator Solar, which is in captive power configuration with zero feed-in implementation. The objective of the solar solution is to reduce grid electricity costs. The grid parallel design without batteries is for direct consumption of produced solar electricity without temporary storage. Zero feed-in implementation ensures that no electricity is fed back to the grid in the event of potential surplus production which is a regulatory requirement.

The flexible and scalable design basis provides the opportunity to extend the system in future. This can be the installation of more solar panels for increased generation capacity as well as the installation of a battery storage solution for the storage of solar electricity for night-time use and to provide a power back-up.

Read more here.

Wind energy

All wind measurements, which have been carried out so far are for meteorological record purposes (general weather data). The standard height for the location of measuring equipment is two meters above the ground and the sensors are often placed close to obstacles. The wind data collection from the national meteorological stations was never done with the intention of monitoring wind speeds for energy utilization. Based on wind data collected at 11 sites in three years (1989-1992) by the Department of Meteorology, Ministry of Water, Lands and Environment, the wind speeds in most areas of Uganda are moderate with average speed not exceeding 3 m/s. In some areas with complex terrain, the wind may speed up due to slopes of hills, escarpments and tunneling effects. In the mountain areas in the south-western part towards the border with Rwanda (Kabale, Kisoro, Ntungamo) and in the area around Mt. Elgon the average wind speed goes up to about 4 m/s. Measurement carried out under the Alternative Energy Resource Assessment and Utilisation Study at two sites for five months (June-Sept 2003) indicated that the average wind speed at Kabale and Mukono at 20m was 3.7m/s. This study concluded that the wind energy resource in Uganda is insufficient for large-scale electricity generation. However, the wind resource may be suitable for special applications, such as water pumping in remote areas and for small-scale electricity generation in mountainous areas. It is possible that some sites could have enough wind speeds to generate substantial amount of electricity. Preliminary investigations in the Karamoja region (North-Eastern Uganda) and along the shores of lake Victoria have shown that there could be potential for production of electricity on a medium scale.

Geothermal energy

The exploration for geothermal resources in Uganda is still at the reconnaissance and exploration stage. Reconnaissance surveys on Ugandan hot springs started in 1921 by the geological survey of Uganda and the first results were published by Wayland (1935). In 1973, as a result of the oil crisis, an attempt was made to initiate a geothermal project with United Nations support, but this did not materialise due to the political turmoil in the country. Geothermal energy resources in Uganda are estimated at 450 MW. Exploration for geothermal energy has been in progress since 1993. So far, three potential areas all situated in western Uganda, in the western branch of the East African Rift Valley have been identified for detailed exploration. The three potential areas are Katwe-Kikorongo, Buranga and Kibiro. Based on recent assessments, they have all been ranked as potential targets for geothermal development. The current study results indicate that the temperature level varies between 150 C° and 200 C° which is sufficient for electricity generation and for direct use in industry and agriculture. The rest of the geothermal areas of Uganda are at a preliminary level of investigation and results will soon be available as basis for their prioritisation for detailed surface exploration.

Cogeneration

Currently there is a capacity of 29.7 MW in two cogeneration plants installed, which both run with bagasse as fuel.[27]Further there is a considerable potential of cogeneration in the sugar processing industry as well as textile manufactures, beer industry, cement industries and foods and beverages industry. The potential in the sugar industry alone is currently estimated to be over 100 MW while for other industries it could be over 50 MW. Cogeneration contributes to power generation as well as to the goal of energy efficiency.[28]

Fossil fuels

The annual consumption of petroleum products was 1.4 billion litres in 2012, which is an increase of 13.9 % compared to 2011. The average annual growth of petroleum consumption is about 7%.[29] In 2012, the import bill for petroleum and petroleum products was the highest, totaling 1.3 billion US$ and accounting for 22.2 % of expenditure on formal imports. The total amount of petroleum products imported in 2012 stood at 1.227 billion litres. The composition is as follows: Petrol (41.1%), Kerosene (6.1%), and diesel products (52.8%). Uganda imports all its petroleum products from overseas since there is no local production yet. About 95% of Uganda’s petroleum imports are routed through Kenya and only 5% come through Tanzania.[30] Oil has been detected in six sedimentary basins in Uganda, the most prospective being the Albertine Graben covering 23,000 km2 in the Western Rift Valley along Uganda’s Border with the Democratic Republic of Congo. Two other basins, Hoima basin and Lake Kyoga basins are still under investigation. Currently the amount of oil discovered is about 6.5 billion barrels of which 1.4 billion barrels are recoverable. But it has to be noted that the numbers change every now and then, suiting to the political situation or new research projects. It is important to note that only around 40% of the Albertine rift basin has been evaluated. This discovery is placing Uganda among the foremost African oil producers. So far over 1 billion US$ has been invested in seismic and drilling of wells since 1998. By international standards the cost of finding a barrel of oil has been very low in Uganda. Bigger investments are required to develop the discovered oil and gas fields. A refinery with an input capacity of 60,000 barrels per day will be build in a modular manner, starting with a capacity of 30,000 barrels per day by the end of 2016 which will be increased to 60,000 barrels per day before 2020.[31] A production sharing agreement between the Government and the consortium Tullow Oil (Ire-UK), Total (F) and CNOOC (China) was concluded in February 2012. The consortium will in the near future detail its planning for the construction of the oil fields. Norway is the lead development partner in the petroleum sector, with a three-year, US$15 million programme, which began in June 2009. The IMF is providing support on petroleum revenue management; the AfDB is providing support on infrastructure; Ireland is considering ways in which it can support civil society in Uganda to work in the sector; DFID is already funding some groups and is exploring other ways to support civil society; and the World Bank is helping with environmental regulations and discussing a possible Petroleum Sector Support Project with the government. The EU delegation is active in all pertinent donor forums in which oil is becoming an increasingly important issue. The EU is actively seeking a better coordination and consolidation of current donor activity.[32]

  • For more information on the fossil fuels resources in Uganda, click here.

►Go To Top

Electricity transmission and distribution

The Ugandan grid is split up into transmission (> 30 kV) and distribution (<= 30 kV). The transmission system losses are approximately less than 4 % and the distribution system losses were 38% in 2005, 26.1% in 2012 and 24,9% in June 2013.[33]

Transmission

The Uganda Electricity Transmission Company Ltd. (UETCL) is the bulk supplier and single buyer of power for the national grid in Uganda. It purchases all independently generated power in the country and it also imports electricity from neighboring countries. UETCL is also responsible for publishing standardized tariffs for renewable energy generation of up to 20 MW capacity based on the avoided cost principle. The length of domestic transmission and distribution lines is 14,312 km.

Distribution

The biggest company empowered to trade and supply electricity at 33kV and below is Umeme Ltd, which leased the assets of the formerly government-owned distribution company (Uganda Electricity Distribution Company Ltd - UEDCL). There are some mini-grid distribution systems and one off-grid generation and distribution company (West Nile Rural Electrification Company Ltd).

Energy Tariffs

Energy cost

The end user tariff for domestic consumers is at 520.6 UGX (Umeme - Q4,2014), one of the highest in East Africa. This is due the enormous raise of prices (52%)[34] in 2012 up to nearly cost-covering end-consumer prices. Currently, the end user retail tariff is based on consumer category as illustrated in the following table. However, to cater for the poor, the life line tariff was not increased and remains at UGX.100 per unit up to 15 kWh per month. The following table shows all the Umeme tariffs from Q4,2014.[35]

Charge Code 10.1 (domestic) Code 10.2/3 (commercial) Code 20 (medium industrial) Code 30 (large industrial) Code 50 (street lights)
Average 520.6 474.4 458.9 310.4 488.8
Peak - 569.7 542.3 373.7 -
Shoulder - 475.0 452.2 311.6 -
Off-peak - 354.0 371.0 232.5 -


Feed-in-Tariffs (FiT)

To promote the development and use of renewable energy sources, the Government has developed a feed-in-tariff structure. A Feed-in-Tariff (FIT) is an instrument for promoting private sector generation of electricity from renewable energy sources. Renewable energy in the context of REFIT is defined as electricity, which can be generated from energy resources such as water power, wind power, solar energy, geothermal energy, biogas and landfill gas combustion, and biomass cogeneration. The REFIT applies to small-scale renewable energy systems of prescribed priority technologies, up to a maximium installed project capacity of 20 MW, as defined by the Electricity Act 1999. The Feed-in-Tariff (FiT) for solar power was approved by the ERA board in April 2014 at an amount of US$0.11/kWh.[36] The FiTs are paid by the Uganda Electricity Transmission Limited (UETCL).


Key Problems of the Energy Sector

According to Power Africa, these two issues are the biggest to face Uganda's energy sector[37]:

  • Lack of integrated power sector planning
  • Lack of fully functional financial ecosystem


Policy Framework

Energy Policy and Poverty Reduction Strategy

The Government of Uganda has over the past eight years embarked on a Power sub-Sector Reform Programme, which has resulted in the implementation of significant structural changes within the sector. The Reform Programme was aimed at providing adequate, reliable and least-cost power supply to meet the country’s demand, promoting the efficient operation of the power sector and scaling up rural and peri-urban access to maximize the impact on poverty reduction. Despite the implementation of these reforms, the country continues to experience significant power supply shortages, low rates of access to electricity and high levels of power losses, all negatively impacting the country’s economic growth. The low level of access to modern forms of energy, particularly electricity, has continued to be one of the major infrastructure bottlenecks to socio-economic growth in Uganda.[38]


The following laws have been passed in order to reform the energy sector:

The Electricity Act, 1999

The salient features of the Act are:
a. Liberalizing the electricity industry;
b. Disbanding of the Uganda Electricity Board (UEB) (historically a vertically integrated monopoly) into three entities namely generation, transmission and distribution;
c. Establishment of Electricity Regulatory Authority (ERA) to regulate the sector;
d. Establishment of the Rural Electrification Fund (REF), with the main objective of enhancing rural access to electricity; and
e. Establishment of the Electricity Dispute Tribunal (EDT) that has jurisdiction to hear and determine electricity sector disputes which are referred to it.


The Energy Policy for Uganda, 2002

The main policy goal is “to meet the energy needs of the Ugandan population for social and economic development, in an environmentally sustainable manner”. The broad policy objectives are:
a. To establish the availability, potential and demand of the various energy resources in the country.
b. To increase access to modern affordable and reliable energy services as a contribution to poverty eradication.
c. To improve energy governance and administration.
d. To stimulate economic development.
e. To manage energy-related environmental impacts.
f. To increase the role of private sector in the power sector operations and future development.

Renewable Energy Policy for Uganda, 2007

The overall goal of the Renewable Energy Policy (REP) is to increase the use of modern renewable energy.
The key policy objectives include:

a. To maintain and improve the responsiveness of the legal and institutional framework to promote renewable energy investments;
b. To establish an appropriate financing and fiscal policy framework for investments in renewable energy technologies;
c. To promote research and development, international cooperation, technology transfer and adoption of standards in renewable energy technologies;
d. To utilize biomass energy efficiently so as to contribute to the management of the resource in a sustainable manner;
e. To promote the sustainable production and utilization of bio-fuels; and
f. To promote the conversion of municipal and industrial waste to energy. Under the power generation programme, REP promotes power generation from mini-hydro power schemes, biomass, cogeneration, wind, solar, geothermal and peat. There are plans to consider nuclear power generation in the power mix in the long term.

The Atomic Energy Act, 2008

The Act provides for:
a. Regulation of the peaceful applications of ionizing radiation;
b. Establishment the Atomic Energy Council (AEC);
c. Protection and safety of individuals, society and the environment from the dangers resulting from ionizing radiation;
d. Production and use of radiation sources and the management of radioactive waste;
e. A framework for the promotion and development of nuclear energy for use in power generation and other peaceful purposes;
f. Compliance with international safety requirements for the use of ionizing radiation, radiation protection and security of radioactive sources;
g. Repeal of the Atomic Energy Act, Cap. 143; and other related matters.

Energy is also an integral part of the Ugandan Government’s Poverty Eradication Action Plan (PEAP) which includes frequent references to the link between energy and poverty alleviation. The Ugandan Government has set the target of providing 10% of rural population with access to electricity until 2012. This target has been specified in the Rural Electrification Strategy and Plan as well as in the PEAP. It is planned to be achieved by grid extension (including through private sector involvement), mini-grids and stand-alone electrification systems. In April 2010, the Government of Uganda launched the National Development Plan (NDP), which covers a number of energy issues. One of the objectives of this plan is increased access and consumption of electricity for growth, employment and socio-economic transformation. Limitations of the forestry sector and their impacts on the country's development are elaborated on as well as challenges of the power sector. In consequence, the NDP highlights the following strategies to overcome the barriers of the energy sector towards achievement its goals: Increase power generation capacity to reach 780-820 MW, mainly through large and small hydro; increase rural electrification from 6% to 10% by, among others, subsidization of mini-grids; promotion of energy efficiency, reduction of power losses from 40% to 16%; revision of existing policies in the energy sector and promotion of renewable energies, esp. biomass and solar. A consultant supported the Ministry to work out The Energy Efficiency and Conservation Bill to promote efficient utilisation of energy in Uganda. Besides that several awareness raising campaigns are carried out.
►Go To Top

Power Africa Uganda Electricity Supply Accelerator 2018

Power Africa announced the launch of the new Power Africa Uganda Electricity Supply Accelerator in 2018. This Accelerator will facilitate the addition of 1,000 megawatts of generation capacity and 1,000,000 new electricity connections in Uganda by 2020.[39]

Institutional Set-up and Actors in the Energy Sector

Public institutions

There are three main governmental institutions dealing with renewable energies for power generation:

  • The Ministry of Energy and Mineral Development (MEMD) is the lead agency in the energy sector. The Ministry is responsible for policy formulation, promotion, coordination, monitoring and evaluation. MEMD is also responsible for initiating legislation in the energy sector. Uganda’s National Energy Policy is so far centralized, i.e. there are no energy officers at sub-national/district level. Part of the MEMD is the Energy Department (ED), which is structured according to sectors. ED comprises four divisions “Energy Efficiency”, “Innovative and Renewable Energies”, “Electricity” and “Provision with Oil Products”.
  • Rural Electrification Agency (REA) functions as the secretariat to the Rural Electrification Board, which realizes MEMD`s rural electrification plans as stipulated in the Indicative Rural Electrification Master Plan. REA controls public funds as for the subsidization of rural electrification projects.
  • Electricity Regulatory Authority (ERA), which was established by the Electricity Act of 1999, is in charge to issue licences for the generation, transmission, distribution or sales of electricity. ERA has also the mandate to establish a tariff structure and investigate tariff charges and approve the rates of charges.

Development partners

Uganda has a large community of international development partners in the energy sector. Better co-ordination and management of international donor support to facilitate improved energy access and better value for money and the reduction of duplication would benefit Uganda significantly. Activities are coordinated through the Energy and Mineral Development Partners Group (EMDPG) which Germany has the lead in since November 2010. Following institutions and countries are represented in this working group: KfW, GIZ, USAID, DFID, EIB, EU-Commission, France, Ireland, IWF, AdDB, JICA, Norway and World Bank. Furthermore these institutions are supporting the Ugandan energy sector: NORAD, IAEA, USTDA, IDB, UNDP, UNIDO, NDF and SIDA.

Current Projects

Energy is generally a side topic for most Ugandan NGOs. However, a lot of projects involve renewable energies as they have a sustainable character and there are several NGOs with certain experiences in the field of the introduction of improved stoves, solar systems and solar lamps.

Current projects include:

  • Captive power plants in the dairy industry: implemented by Equator Solar, supported by the German Energy Agency - dena, the German Energy Solutions Initiative, and the dena Renewable Energy Soultions Programme (dena RES Programme).
  • Energy efficiency assesments in productive industries, implemented by Equator Solar, in partnership with Renergy Consulting GmbH, supported by Deutsche Gesellschaft für Internationale Zusammenarbeit GmbH (GIZ)

Commercial service provider

By 2010, in the field of photovoltaic systems over 30 providers operated in Uganda. The Solar companies in general have difficulties to develop markets in rural areas and focus their interest on urban areas.[40] In the field of stoves there are numerous artisans and private-business companies producing improved cook stoves especially for the urban market. Some of these artisans and private-business companies were trained and supported by the EnDev-Uganda programme.

►Go To Top

Key Problems Hampering Access to Modern Energy Services in Rural Areas

Obstacles for Grid Based Rural Electrification

The Government of Uganda has limited resources for extending the grid to rural areas. At the moment, the Government’s focus is on solving the power supply crisis that is crippling the national economy. Based on an improved power generation it will concentrate its efforts to extend the grid to major urban and peri-urban areas. Tariff rates for customers differ according to the category of client. They reflect the cost of electricity supply to that category. Implementation of this principle eliminates cross-subsidization of any category of customers by other categories. As a result, the tariff for domestic consumers is relatively high with 0,15 €/0,19 USD per kWh (UGX 518.7 – Umeme Q4,2014).[41] This tariff is often higher than the tariff for industrial consumers because domestic consumers who take supply at the low voltage impose higher investment and operational costs on the system than industrial consumers who are supplied at the high voltage or medium voltage. For Umeme ltd. it is generally profitable to extend the grid. However, poor households cannot afford the connection fee and the electricity costs. In addition, collection costs are high in areas with dispersed population and low numbers of clients. Prepaid meters are more and more common in Uganda. By the end of August 2013, Umeme had installed 33,985 prepayment meters.[42] Beside Uneme, private companies invest in minigrids only in exceptional cases. Normally, costs of providing access are too high due to remoteness of the sites, dispersed populations and difficulty of the terrain. Local communities don’t dispose of sufficient proper financial resources to make infrastructure investments in their community.

►Go To Top

Obstacles for Off Grid Energy Technologies and Services

There is strong political motivation to improve access to electricity of rural populations, particularly those remote from the grid. However, in the case of SHS both the affordability and the availability were seen as major problems for the dissemination of the solar systems in rural areas. In the case of hydropower, the investment costs are generally not affordable for rural communities and investors. In addition, there is a lack of management skills to operate MHPPs. Generally, the availability of micro-finance schemes for energy technologies in rural areas is limited. If accessible, the costs for such financing are very high (typically at rates as high as 25% per month). Large parts of the country have almost no access to institutional micro-finance services and must rely largely on moneylenders, suppliers, family and friends for short -term seasonal loans. There are no secure liquid savings options available to these households, which would enable them to build assets over time. Existing micro-finance institutions often have a narrow credit product line, limited experience in rural markets and a lack of access to best practice information and technical tools. In addition marketing and maintenance structure for energy technology devices in rural areas are weak. Almost all retailers are established in the big cities with no outlets in rural communities. Thus, clients have to travel to cities to purchase energy devices and for repair orders, which is difficult for most rural families. Establishing rural outlets is not considered to be profitable due to the high costs for transportation and mobilization, the dispersed nature of the populations and the low income and low demand of the local population.
►Go To Top

Impacts of electrification (2011-2019)

This article presents the results of a six-year monitoring exercise to track impacts of rural electrification in the West Nile sub-region of Uganda. Impacts of Rural Electrification in Uganda 2011-2019

Further Information


►Go To Top

References

  1. U.S. Energy Information Admistration - http://www.eia.gov/countries/country-data.cfm?fips=UG#tpefckLR
  2. Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19
  3. KfW
  4. PWC - http://www.pwc.com/en_UG/ug/assets/pdf/uganda-budget-2013.pdf
  5. SE4ALL
  6. World Bank - http://data.worldbank.org/country/uganda
  7. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 106
  8. Ministry of Energy and Mineral Development, Energy Balance of Uganda 2012
  9. Ministry of Energy and Mineral Development, Energy Balance of Uganda 2012
  10. Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19, page 84
  11. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19
  12. World Bank - http://data.worldbank.org/indicator/AG.LND.FRST.ZS
  13. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 38
  14. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 68
  15. SE4ALL
  16. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 101
  17. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 16
  18. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 68
  19. FAO (2010) – Planted forests Uganda; http://www.fao.org/forestry/country/18316/en/uga/
  20. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 62
  21. Ministry of Energy and Mineral Development, Biomass Energy Strategy (2014), page 11
  22. Ministry of Energy and Mineral Development, Uganda Renewable Energy Policy 2007
  23. REA - Rural electrification strategy and plan 2013-2022
  24. Worldbank - http://www.worldbank.org/projects/P112334/uganda-energy-rural-transformation-apl-2?lang=en
  25. https://www.devex.com/projects/tenders/energy-for-rural-transformation-ert-ii-project-in-uganda-supply-installation-commissioning-and-maintenance-of-solar-photovoltaic-energy-packages-for-310-post-primary-education-institutions-in-uganda/74846
  26. https://uganda7.com/info/four-ugandan-companies-win-grants-to-power-refugee-camps/
  27. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 27
  28. SE4ALL
  29. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 72
  30. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 71
  31. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 162
  32. SE4ALL
  33. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 33
  34. Ministry of Energy and Mineral Development, Strategic Investment Plan 2014/15 – 2018/19, page 33
  35. Umeme - http://www.umeme.co.ug/articles/TariffAdNV.pdf
  36. ERA - http://www.era.or.ug/index.php/2013-10-23-18-03-21/2013-10-23-18-12-48/featured-articles/320-feed-in-tariff-for-grid-connected-solar-pv-electricity
  37. Power Africa. (2018). Uganda Factsheet. Retrieved from: https://www.usaid.gov/sites/default/files/documents/1860/Uganda_-_November_2018_Country_Fact_Sheet.pdf
  38. SE4ALL
  39. https://www.newvision.co.ug/new_vision/news/1470667/us-uk-commit-sh40b-uganda-grid-energy-solutions
  40. REA - Rural electrification strategy and plan 2013-2022 http://rea.or.ug/phocadownload/rural%20electrification%20strategy%20and%20plan%202013-2022.pdf page 9
  41. ERA - http://www.era.or.ug/index.php/statistics-tariffs/tariffs/distribution-tariffs/2014-10-14-10-24-55
  42. Ministry of Energy and Mineras Development, Strategic Investment Plan 2014/15 – 2018/19, page 33