Difference between revisions of "Clanwilliam"

From energypedia
***** (***** | *****)
***** (***** | *****)
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
 
|HPDBDeveloper=Clackson Power
 
|HPDBDeveloper=Clackson Power
 
|HPDBProject Status=Commissioned
 
|HPDBProject Status=Commissioned
|HPDBCapacity Factor=300.0 kW
+
|HPDBPower=300
 
|HPDBMini Grid=No
 
|HPDBMini Grid=No
 
}}
 
}}

Latest revision as of 12:55, 28 January 2013


Back to the Hydropower Sites Database

General Information

Country: South Africa
City/Town: Clanwilliam, Western Cape
Coordinates (Powerhouse):
Year of Commission: 1935
Basin Name: Clanwilliam
Stream Name: Oliphants
Developer: Clackson Power
Operator:
Project Status: Commissioned
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 300
Energy (kWh/a):
Capacity Factor (%):
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type:
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: