Difference between revisions of "Bethlehem hydro Merino plant"

From energypedia
***** (***** | *****)
(Created page with "{{HPDB |HPDBCountry=South Africa |HPDBCity/Town=Bethlehem |HPDBDate of Commission=2010 |HPDBBasin Name=Bethlehem, Free State |HPDBStream Name=As River |HPDBProject Status=Comm...")
 
***** (***** | *****)
 
Line 7: Line 7:
 
|HPDBProject Status=Commissioned
 
|HPDBProject Status=Commissioned
 
|HPDBCapacity Factor=4000.0 kW
 
|HPDBCapacity Factor=4000.0 kW
|HPDBTurbine Type=1 * Kaplan of 4000.0 kW  
+
|HPDBTurbine Type=1 * Kaplan of 4000.0 kW
|HPDBTurbine Manufacturer=Boving Fouress  
+
|HPDBTurbine Manufacturer=Boving Fouress
 
|HPDBMini Grid=No
 
|HPDBMini Grid=No
 
}}
 
}}

Latest revision as of 08:32, 28 January 2013


Back to the Hydropower Sites Database

General Information

Country: South Africa
City/Town: Bethlehem
Coordinates (Powerhouse):
Year of Commission: 2010
Basin Name: Bethlehem, Free State
Stream Name: As River
Developer:
Operator:
Project Status: Commissioned
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW)
Energy (kWh/a):
Capacity Factor (%): 4000.0 kW
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: 1 * Kaplan of 4000.0 kW
Turbine Manufacturer: Boving Fouress
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam Construction Material:
Dam Height [m]:
Length of Dam [m]:
Storage Volume of Reservoir (m³):
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€):
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: