Difference between revisions of "Friedenheim"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
|HPDBCountry=South Africa | |HPDBCountry=South Africa | ||
|HPDBCity/Town=Nelspruit, Mpumalanga, | |HPDBCity/Town=Nelspruit, Mpumalanga, | ||
− | |HPDBDate of Commission= | + | |HPDBDate of Commission=1987 |
|HPDBStream Name=Krokodil | |HPDBStream Name=Krokodil | ||
|HPDBProject Status=Commissioned | |HPDBProject Status=Commissioned | ||
|HPDBLink to Photos=http://hydro4africa.net/HP_database/station.php?ID=1&tab=images | |HPDBLink to Photos=http://hydro4africa.net/HP_database/station.php?ID=1&tab=images | ||
− | |HPDBPower=2000 | + | |HPDBPower=2000 |
− | |HPDBTurbine Type= | + | |HPDBTurbine Type=Francis |
|HPDBTurbine Manufacturer=Sulzer | |HPDBTurbine Manufacturer=Sulzer | ||
|HPDBMini Grid=No | |HPDBMini Grid=No | ||
− | |HPDBDam Height=500 | + | |HPDBDam Height=500 |
− | |HPDBLength of Dam=5200 | + | |HPDBLength of Dam=5200 |
− | |HPDBStorage Volume of Reservoir=4.000 | + | |HPDBStorage Volume of Reservoir=4.000 |
}} | }} |
Latest revision as of 13:00, 28 January 2013
Back to the Hydropower Sites Database
General Information
Country: | South Africa |
---|---|
City/Town: | Nelspruit, Mpumalanga, |
Coordinates (Powerhouse): | |
Year of Commission: | 1987 |
Basin Name: | |
Stream Name: | Krokodil |
Developer: | |
Operator: | |
Project Status: | Commissioned |
Any other uses of the water source: | |
Contact: | |
Comment: | |
Link to Photos: | http://hydro4africa.net/HP_database/station.php?ID=1&tab=images |
Technical Information
Power: (kW) | 2000 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | |
Penstock Length (m): | |
Penstock Material (m³/s): | |
Maximum Flow of the Penstock (m³/s): | |
Minimum Flow of the Stream (m³/s): | |
Head (m): | |
Turbine Type: | Francis |
Turbine Manufacturer: | Sulzer |
Generator Type: | |
Generator Capacity (kW): | |
Generator Manufacturer: | |
Comment: |
Mini/Island Grid Information
Mini Grid: | No |
---|---|
Load Control Information: | |
Connection Type: | |
Public Lighting: | |
Length of Transmission Line (m): | |
Voltage (v): | |
Transmission Conductor (type) : | |
Diameter of Conductor (mm²): | |
Transformer Rating (kVA): | |
Link to Grid: | |
S.W.E.R: | |
Operational Period (Xdays/year): | |
Comment: |
Dam Information
Dam Type: |
|
---|---|
Dam Construction Material: | |
Dam Height [m]: | 500 |
Length of Dam [m]: | 5200 |
Storage Volume of Reservoir (m³): | 4.000 |
Flood Storage of Reservoir: | |
Channel Material: | |
Comment: |
Economic Information
Cost (€): | |
---|---|
Donor/Financier & Percentage: | |
Tariff Levels: | |
Connected Households: | |
Connection Cost (€): | |
Cost to be Covered by Households (%): | |
Comment: | |
Link to Cost Breakdown: |