Difference between revisions of "Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
(Created page with "{{RE Toolkit Database |RET title=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis |RET organization=World Bank |RET year...")
 
***** (***** | *****)
m (Text replace - "PRC" to "REPRC")
 
(13 intermediate revisions by 2 users not shown)
Line 1: Line 1:
{{RE Toolkit Database
 
|RET title=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
 
|RET organization=World Bank
 
|RET year=2011
 
|RET Country=Indonesia
 
|RET language=English
 
|RET file en=Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf
 
|RET file fr=
 
|RET file ar=
 
|RET file sp=
 
|RET file cn=
 
|RET file ru=
 
|RET file pr=
 
|RET file other=
 
|RET type general=Project Financing
 
|RET type financing=Examples of Economic & Financial Analysis
 
|RET type other=
 
|RET technology=Storage
 
|RET abstract=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Indonesia
 
  
Economic and Financial Analysis
+
{{Project Resource Center
 +
|REPRC title=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
 +
|REPRC organization=World Bank
 +
|REPRC year=2011
 +
|REPRC Region East Asia and Pacific=East Asia & The Pacific
 +
|REPRC Country in East Asia and Pacific=Indonesia
 +
|REPRC language=English
 +
|REPRC file ar=
 +
|REPRC file cn=
 +
|REPRC file en=Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf
 +
|REPRC file fr=
 +
|REPRC file pr=
 +
|REPRC file ru=
 +
|REPRC file sp=
 +
|REPRC file other=
 +
|REPRC type general=Project Financing
 +
|REPRC type financing=Examples of Economic & Financial Analysis
 +
|REPRC type other=
 +
|REPRC technology hydro=Hydro
 +
|REPRC technology storage=Storage
 +
|REPRC abstract=The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.
 +
 
 +
The document includes the financial analysis: historical context, past financial performance, PLN's financial forecasts, project FRR analysis.
 
}}
 
}}
 +
 +
[[Category:REPRC_Storage]]
 +
[[Category:Project_Resource_Center]]
 +
[[Category:Indonesia]]
 +
[[Category:REPRC_Project_Financing]]
 +
[[Category:Financing_and_Funding]]
 +
[[Category:REPRC_Hydro]]
 +
[[Category:Hydro]]

Latest revision as of 15:03, 26 February 2014



Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis

Title of Document Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
Abstract The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.

The document includes the financial analysis: historical context, past financial performance, PLN's financial forecasts, project FRR analysis.

File Download

English: Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf

Original Source World Bank
Year 2011
Region/Country East Asia & The Pacific - Indonesia
Language(s) English
Document Type Project Financing- Examples of Economic & Financial Analysis
Technology Hydro
Storage
Connection Type


Hydro


Property "REPRC abstractsearch2" (as page type) with input value "ß, perusahaan listrik negara (pln), in hydropower planning, development and operation.</br></br>the document includes the financial analysis: historical context, past financial performance, pln's financial forecasts, project frr analysis." contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.