Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
From energypedia
Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
Title of Document | Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis |
Abstract | The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.
The document includes the financial analysis: historical context, past financial performance, PLN's financial forecasts, project FRR analysis. |
File Download |
► English: Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf |
Original Source | World Bank |
Year | 2011 |
Region/Country | East Asia & The Pacific - Indonesia |
Language(s) | English |
Document Type | Project Financing- Examples of Economic & Financial Analysis |
Technology | Hydro Storage |
Connection Type |
Property "REPRC abstractsearch2" (as page type) with input value "ß, perusahaan listrik negara (pln), in hydropower planning, development and operation.</br></br>the document includes the financial analysis: historical context, past financial performance, pln's financial forecasts, project frr analysis." contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.