Difference between revisions of "Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis"

From energypedia
***** (***** | *****)
m (Text replace - "RE Toolkit Database" to "Project Resource Center")
***** (***** | *****)
m (Text replace - "PRC" to "REPRC")
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
 
{{Project Resource Center
 
{{Project Resource Center
|PRC title=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
+
|REPRC title=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
|PRC organization=World Bank
+
|REPRC organization=World Bank
|PRC year=2011
+
|REPRC year=2011
|PRC Country=Indonesia
+
|REPRC Region East Asia and Pacific=East Asia & The Pacific
|PRC language=English
+
|REPRC Country in East Asia and Pacific=Indonesia
|PRC file en=Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf
+
|REPRC language=English
|PRC file fr=
+
|REPRC file ar=
|PRC file ar=
+
|REPRC file cn=
|PRC file sp=
+
|REPRC file en=Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf
|PRC file cn=
+
|REPRC file fr=
|PRC file ru=
+
|REPRC file pr=
|PRC file pr=
+
|REPRC file ru=
|PRC file other=
+
|REPRC file sp=
|PRC type general=Project Financing
+
|REPRC file other=
|PRC type financing=Examples of Economic & Financial Analysis
+
|REPRC type general=Project Financing
|PRC type other=
+
|REPRC type financing=Examples of Economic & Financial Analysis
|PRC technology=Storage
+
|REPRC type other=
|PRC abstract=Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Indonesia
+
|REPRC technology hydro=Hydro
 +
|REPRC technology storage=Storage
 +
|REPRC abstract=The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.
  
Economic and Financial Analysis
+
The document includes the financial analysis: historical context, past financial performance, PLN's financial forecasts, project FRR analysis.
 
}}
 
}}
  
 +
[[Category:REPRC_Storage]]
 +
[[Category:Project_Resource_Center]]
 +
[[Category:Indonesia]]
 +
[[Category:REPRC_Project_Financing]]
 +
[[Category:Financing_and_Funding]]
 +
[[Category:REPRC_Hydro]]
 
[[Category:Hydro]]
 
[[Category:Hydro]]
[[Category:Financing_and_Funding]]
 
[[Category:PRC_Project_Financing]]
 
[[Category:Indonesia]]
 
[[Category:Storage]]
 
[[Category:Project_Resource_Center]]
 

Latest revision as of 15:03, 26 February 2014



Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis

Title of Document Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project - Economic and Financial Analysis
Abstract The development objective is to significantly increase the peaking capacity of the power generation system in Java-Bali in an environmentally and socially sustainable way and strengthen the institutional capacity of the project implementing entity, Perusahaan Listrik Negara (PLN), in hydropower planning, development and operation.

The document includes the financial analysis: historical context, past financial performance, PLN's financial forecasts, project FRR analysis.

File Download

English: Indonesia Upper Cisokan Pumped Storage Hydro-Electrical Power (1040 MW) Project E&FA.pdf

Original Source World Bank
Year 2011
Region/Country East Asia & The Pacific - Indonesia
Language(s) English
Document Type Project Financing- Examples of Economic & Financial Analysis
Technology Hydro
Storage
Connection Type


Hydro


Property "REPRC abstractsearch2" (as page type) with input value "ß, perusahaan listrik negara (pln), in hydropower planning, development and operation.</br></br>the document includes the financial analysis: historical context, past financial performance, pln's financial forecasts, project frr analysis." contains invalid characters or is incomplete and therefore can cause unexpected results during a query or annotation process.