Results of the discussions during Mata 2009 about:
Which tariffs and billing systems have been successful? Which challenges have been identified?
Country/Project/System | system applied successful | Challenge |
Indonesia / MHP /Micro Hydro Schemes |
Communal-set tariffs
2. |
|
Pakistan | Item based (eg #of bulbs) | |
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|