Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 5: | Line 5: | ||
{| width="98%" cellspacing="1" cellpadding="7" border="1" | {| width="98%" cellspacing="1" cellpadding="7" border="1" | ||
|- | |- | ||
− | | '''Country/Project/System''' | + | | width="30%" | '''Country/Project/System''' |
− | | ''' | + | | width="34%" | '''System applied successful''' |
− | | ''' | + | | '''Challenges''' |
|- | |- | ||
− | | Indonesia / MHP /Micro Hydro Schemes | + | | <u>'''Indonesia / MHP /Micro Hydro Schemes'''</u> |
| | | | ||
− | Communal-set tariffs | + | *'''Communal-set tariffs''' |
− | #Flat rate (households) | + | #'''Flat rate''' (households) |
− | #Item based (eg #of bulbs) | + | #'''Item based''' (eg # of bulbs) |
− | #Cluster metering | + | #'''Cluster metering''' |
− | |||
− | |||
| | | | ||
Line 24: | Line 22: | ||
|- | |- | ||
− | | Pakistan | + | | <u>'''Pakistan'''</u> |
− | | Item based (eg #of bulbs) | + | | |
+ | *'''Item based '''(eg # of bulbs) | ||
+ | |||
| | | | ||
|- | |- | ||
− | | planned in Ethiopia / EnDev / Micro Hydro Schemes | + | | planned in <u>'''Ethiopia / EnDev / Micro Hydro Schemes'''</u> |
| | | | ||
− | *flat rate (no productive use) + mech.load limiter; only CLF, no social tariff | + | *'''flat rate''' (no productive use) + mech.'''load limiter'''; only CLF, no social tariff |
| | | | ||
+ | *Expected challenges: | ||
+ | |||
+ | #billing - recovery rate too low | ||
+ | #monitoring of applied devices | ||
+ | #Static system | ||
+ | |||
+ | *risk: pilot --> not cost covering | ||
+ | |||
|- | |- | ||
| | | | ||
+ | <u>'''Republic South Africa / SHS'''</u> | ||
+ | |||
+ | <u>'''Pakistan / SHS'''</u> | ||
+ | |||
| | | | ||
| | | | ||
+ | *'''Fee for service with pre-paid metering''' | ||
+ | |||
+ | #complete financial failure | ||
+ | #conceptual design resulted in no ownership and caused vandalism, theft,... | ||
+ | |||
|- | |- | ||
+ | | <u>'''Ghana / grid'''</u> | ||
| | | | ||
− | + | *'''Multi-level tariff''' | |
+ | |||
+ | #'''prepaid''' and '''post paid metered''' | ||
+ | #'''lifetime tariff''' | ||
+ | |||
| | | | ||
|- | |- |
Revision as of 08:40, 13 July 2009
Results of the discussions during Mata 2009 about:
Which tariffs and billing systems have been successful? Which challenges have been identified?
Country/Project/System | System applied successful | Challenges |
Indonesia / MHP /Micro Hydro Schemes |
|
|
Pakistan |
|
|
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|
Republic South Africa / SHS Pakistan / SHS |
| |
Ghana / grid |
|
|