Difference between revisions of "Tariffs and Billings Systems - Experience Matrix - MATA 2009"
From energypedia
***** (***** | *****) m |
***** (***** | *****) m |
||
Line 1: | Line 1: | ||
− | Results of the discussions during Mata 2009 about: | + | <p>Results of the discussions during Mata 2009 about: |
+ | </p> | ||
+ | <h1> Which tariffs and billing systems have been successful? Which challenges have been identified? </h1> | ||
+ | <table width="98%" cellspacing="1" cellpadding="7" border="1"> | ||
− | = | + | <tr> |
+ | <td width="30%"> <b>Country/Project/System</b> | ||
+ | </td><td width="34%"> <b>System applied successful</b> | ||
+ | </td><td> <b>Challenges</b> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Indonesia / MHP /Micro Hydro Schemes</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>Communal-set tariffs</b> | ||
+ | </li></ul> | ||
+ | <ol><li><b>Flat rate</b> (households) | ||
+ | </li><li><b>Item based</b> (eg # of bulbs) | ||
+ | </li><li><b>Cluster metering</b> | ||
+ | </li></ol> | ||
+ | </td><td> | ||
+ | <ul><li>Overloading | ||
+ | </li><li>Sanction management | ||
+ | </li></ul> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Pakistan</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>Item based </b>(eg # of bulbs) | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> planned in <u><b>Ethiopia / EnDev / Micro Hydro Schemes</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>flat rate</b> (no productive use) + mech.<b>load limiter</b>; only CLF, no social tariff | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | <ul><li>Expected challenges: | ||
+ | </li></ul> | ||
+ | <ol><li>billing - recovery rate too low | ||
+ | </li><li>monitoring of applied devices | ||
+ | </li><li>Static system | ||
+ | </li></ol> | ||
+ | <ul><li>risk: pilot --> not cost covering | ||
+ | </li></ul> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> | ||
+ | <p><u><b>Republic South Africa / SHS</b></u> | ||
+ | </p><p><u><b>Pakistan / SHS</b></u> | ||
+ | </p> | ||
+ | </td><td> | ||
+ | </td><td> | ||
+ | <ul><li><b>Fee for service with pre-paid metering</b> | ||
+ | </li></ul> | ||
+ | <ol><li>complete financial failure | ||
+ | </li><li>conceptual design resulted in no ownership and caused vandalism, theft,... | ||
+ | </li></ol> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> | ||
+ | <p><u><b>Senegal / SHS</b></u> | ||
+ | </p><p><u><b>Burkina Faso / SHS</b></u> | ||
+ | </p> | ||
+ | </td><td> | ||
+ | <ul><li><b>Fee for service </b>successful | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Ghana / grid</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>Multi-level tariff</b> | ||
+ | </li></ul> | ||
+ | <ol><li><b>prepaid</b> and <b>post paid metered</b> | ||
+ | </li><li><a href="http://www.endev.info/wiki/index.php/Tariffs#Lifeline_tariff_-_Ghana"><b>lifeline tariff</b></a> | ||
+ | </li></ol> | ||
+ | </td><td> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>China / grid - households</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>one tariff pre paid metered</b> | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Rwanda / grid</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>one tariff pre paid metered</b><br /> | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | <ul><li>power production to low for overall demand | ||
+ | </li></ul> | ||
+ | <ol><li>utility prefers to connect only big consumers | ||
+ | </li></ol> | ||
+ | <ul><li>off grid tariff (MHP) lower than grid tariff | ||
+ | </li></ul> | ||
+ | <ol><li>not cost covering | ||
+ | </li></ol> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Zambia / grid</b></u> | ||
+ | </td><td> | ||
+ | <ul><li>recently change from <b>flat rate</b> to <b>prepaid tariff</b> | ||
+ | </li></ul> | ||
+ | <ol><li>resulted in lower electricity consumption | ||
+ | </li></ol> | ||
+ | </td><td> | ||
+ | <ul><li>with reduced electricity consumption the demand for charcoal increase singnificant | ||
+ | </li></ul> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <u><b>Senegal / Minigrids</b></u> | ||
+ | </td><td> | ||
+ | <ul><li><b>flat rate</b> with <b>consumption limiter</b> | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | <ul><li>one tariff nationwide | ||
+ | </li></ul> | ||
+ | <ol><li>not cost covering under all conditions | ||
+ | </li></ol> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> <b>Marocco / planned for island grid</b> | ||
+ | </td><td> | ||
+ | <ul><li><b>load variable tariff</b> | ||
+ | </li></ul> | ||
+ | </td><td> | ||
+ | </td></tr> | ||
+ | <tr> | ||
+ | <td> | ||
+ | </td><td> | ||
+ | </td><td> | ||
+ | </td></tr></table> | ||
+ | <p><br /> <a href="Tariffs">Link to Tariff in the Hydro Portal</a> | ||
+ | </p><p><a href="Metering and billing systems">Link to Metering and billing systems</a> | ||
+ | </p> | ||
− | + | [[Category:Financing, promotion schemes and subsidies]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | [[Category: |
Revision as of 16:31, 2 August 2009
Results of the discussions during Mata 2009 about:
Which tariffs and billing systems have been successful? Which challenges have been identified?
Country/Project/System | System applied successful | Challenges |
Indonesia / MHP /Micro Hydro Schemes |
|
|
Pakistan |
| |
planned in Ethiopia / EnDev / Micro Hydro Schemes |
|
|
Republic South Africa / SHS Pakistan / SHS |
| |
Senegal / SHS Burkina Faso / SHS |
| |
Ghana / grid |
| |
China / grid - households |
| |
Rwanda / grid |
|
|
Zambia / grid |
|
|
Senegal / Minigrids |
|
|
Marocco / planned for island grid |
| |
<a href="Tariffs">Link to Tariff in the Hydro Portal</a>
<a href="Metering and billing systems">Link to Metering and billing systems</a>