Difference between revisions of "Kisiizi Hospital"
From energypedia
***** (***** | *****) |
***** (***** | *****) |
||
Line 6: | Line 6: | ||
|HPDBOperator=Kisiizi Power Ltd | |HPDBOperator=Kisiizi Power Ltd | ||
|HPDBProject Status=Completed | |HPDBProject Status=Completed | ||
− | |HPDBContact= | + | |HPDBContact=please contact Paul Darrall (see bottom of the page) |
|HPDBLink to Photos=www.kisiizihospital.org.ug | |HPDBLink to Photos=www.kisiizihospital.org.ug | ||
|HPDBPower=300 | |HPDBPower=300 | ||
Line 47: | Line 47: | ||
|HPDBCommentEI=cost of service connection and meter | |HPDBCommentEI=cost of service connection and meter | ||
}} | }} | ||
+ | |||
Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric. | Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric. |
Revision as of 18:26, 4 February 2020
Back to the Hydropower Sites Database
General Information
Country: | Uganda |
---|---|
City/Town: | Kisiizi |
Coordinates (Powerhouse): | |
Year of Commission: | 2009 |
Basin Name: | |
Stream Name: | |
Developer: | Friends of Kisiizi UK |
Operator: | Kisiizi Power Ltd |
Project Status: | Completed |
Any other uses of the water source: | |
Contact: | please contact Paul Darrall (see bottom of the page) |
Comment: | |
Link to Photos: | www.kisiizihospital.org.ug |
Technical Information
Power: (kW) | 300 |
---|---|
Energy (kWh/a): | |
Capacity Factor (%): | |
Penstock Diameter (mm): | 800 |
Penstock Length (m): | 45 |
Penstock Material (m³/s): | Helically welded 8mm steel |
Maximum Flow of the Penstock (m³/s): | 1 |
Minimum Flow of the Stream (m³/s): | 2 |
Head (m): | 30 |
Turbine Type: | Crossflow |
Turbine Manufacturer: | Ossberger |
Generator Type: | Synchronous Brushless |
Generator Capacity (kW): | 500 |
Generator Manufacturer: | |
Comment: | Gearbox 2:1 |
Mini/Island Grid Information
Mini Grid: | Yes |
---|---|
Load Control Information: | Load Tank |
Connection Type: | |
Public Lighting: | Yes |
Length of Transmission Line (m): | 10000 |
Voltage (v): | 11000 |
Transmission Conductor (type) : | ACSR |
Diameter of Conductor (mm²): | 6 |
Transformer Rating (kVA): | 315 |
Link to Grid: | Off Grid |
S.W.E.R: | No |
Operational Period (Xdays/year): | 365 |
Comment: | 300 external paying customers |
Dam Information
Dam Type: |
Run of river |
---|---|
Dam Construction Material: | Concrete Gravity Dam |
Dam Height [m]: | 2 |
Length of Dam [m]: | 3 |
Storage Volume of Reservoir (m³): | 0 |
Flood Storage of Reservoir: | No |
Channel Material: | Stone/cement |
Comment: | Water diverted from 30m waterfall |
Economic Information
Cost (€): | 900000 |
---|---|
Donor/Financier & Percentage: | World Bank |
Tariff Levels: | Same as Umeme |
Connected Households: | 300 |
Connection Cost (€): | Individually priced |
Cost to be Covered by Households (%): | |
Comment: | cost of service connection and meter |
Link to Cost Breakdown: |
Non-profit company to return all profit to hospital to subsidise treatment for poor people, including psychiatric.