Knowledge fuels change - Support energypedia!
For over 10 years, energypedia has been connecting energy experts around the world — helping them share knowledge, learn from each other, and accelerate the global energy transition.
Today, we ask for your support to keep this platform free and accessible to all. Even a small contribution makes a big difference! If just 10–20% of our 60,000+ monthly visitors donated the equivalent of a cup of coffee — €5 — Energypedia would be fully funded for a whole year.
Is the knowledge you’ve gained through Energypedia this year worth €5 or more?
Your donation keeps the platform running, helps us create new knowledge products, and contributes directly to achieving SDG 7.


Donate now and support open access to energy expertise

Thank you for your support, your donation, big or small, truly matters!

Difference between revisions of "Fincha"

From energypedia
***** (***** | *****)
***** (***** | *****)
m
Line 2: Line 2:
 
|HPDBCountry=Ethiopia
 
|HPDBCountry=Ethiopia
 
|HPDBCity/Town=Oromiya
 
|HPDBCity/Town=Oromiya
|HPDBCoordinates=Latitude= 9.558, Longitude= 37.3663.
+
|HPDBCoordinates=9.558, 37.3663.
 
|HPDBDate of Commission=1974
 
|HPDBDate of Commission=1974
 
|HPDBBasin Name=Tana Lake
 
|HPDBBasin Name=Tana Lake

Revision as of 08:09, 3 September 2012


Back to the Hydropower Sites Database

General Information

Country: Ethiopia
City/Town: Oromiya
Coordinates (Powerhouse): The following coordinate was not recognized: 9.558, 37.3663..The following coordinate was not recognized: 9.558, 37.3663..
Year of Commission: 1974
Basin Name: Tana Lake
Stream Name: Tana Lake
Developer:
Operator: Ethiopian Electric and Power Company
Project Status: Completed
Any other uses of the water source:
Contact:
Comment:
Link to Photos:

Technical Information

Power: (kW) 84,000
Energy (kWh/a): 532,000,000
Capacity Factor (%): 72
Penstock Diameter (mm):
Penstock Length (m):
Penstock Material (m³/s):
Maximum Flow of the Penstock (m³/s):
Minimum Flow of the Stream (m³/s):
Head (m):
Turbine Type: Pelton
Turbine Manufacturer:
Generator Type:
Generator Capacity (kW):
Generator Manufacturer:
Comment:

Mini/Island Grid Information

Mini Grid: No
Load Control Information:
Connection Type:
Public Lighting:
Length of Transmission Line (m):
Voltage (v):
Transmission Conductor (type) :
Diameter of Conductor (mm²):
Transformer Rating (kVA):
Link to Grid:
S.W.E.R:
Operational Period (Xdays/year):
Comment:

Dam Information

Dam Type:

Dam on river with reservoir
Dam Construction Material:
Dam Height [m]: 20
Length of Dam [m]: 340
Storage Volume of Reservoir (m³): 650,000,000
Flood Storage of Reservoir:
Channel Material:
Comment:

Economic Information

Cost (€): 32,797,514
Donor/Financier & Percentage:
Tariff Levels:
Connected Households:
Connection Cost (€):
Cost to be Covered by Households (%):
Comment:
Link to Cost Breakdown: